Podcast
Questions and Answers
What does the Premises Emergency Data (PED) include?
What does the Premises Emergency Data (PED) include?
- Staff training history and performance reviews
- Financial data and audits
- Emergency contact numbers only
- Occupancy load and key personnel (correct)
Who is responsible for submitting the completed PED?
Who is responsible for submitting the completed PED?
- The Building Owner
- The CD Division HQ
- The Incident Commander
- The Fire Safety Manager (FSM) (correct)
How often must the FSM submit updates to the PED?
How often must the FSM submit updates to the PED?
- Once a year, unless updates are needed sooner (correct)
- Bi-annually
- Every month
- Only when the building changes ownership
What is the purpose of the operational survey conducted by the Division HQ?
What is the purpose of the operational survey conducted by the Division HQ?
What actions must the FSM take if there are revisions to the PED?
What actions must the FSM take if there are revisions to the PED?
What does the CD Division Contingency Plan primarily address?
What does the CD Division Contingency Plan primarily address?
Which of the following is not a part of the information required for the PED?
Which of the following is not a part of the information required for the PED?
How soon after submitting the PED does the Division HQ conduct an operational survey?
How soon after submitting the PED does the Division HQ conduct an operational survey?
What is the role of the FSM in relation to the PED?
What is the role of the FSM in relation to the PED?
What is required for the threat assessment included in the PED?
What is required for the threat assessment included in the PED?
How often does the Division HQ write to the FSM regarding PED updates?
How often does the Division HQ write to the FSM regarding PED updates?
What happens if inaccuracies are found during the operational survey?
What happens if inaccuracies are found during the operational survey?
Which of the following is considered in the fire risk assessment within the PED?
Which of the following is considered in the fire risk assessment within the PED?
What is the maximum timeframe for submitting the completed PED after receiving notification?
What is the maximum timeframe for submitting the completed PED after receiving notification?
Which component is NOT included in the data required for the PED?
Which component is NOT included in the data required for the PED?
What is a primary result of the operational survey conducted by the Division HQ?
What is a primary result of the operational survey conducted by the Division HQ?
Flashcards
PED (Premises Emergency Data)
PED (Premises Emergency Data)
Data about a building's features and resources required by SCDF (Singapore Civil Defence Force) Incident Commanders during emergencies.
Contingency Plan (CD Division)
Contingency Plan (CD Division)
A plan made by the Civil Defence (CD) Division outlining the incident management at a location during emergencies.
FSM (Facility Safety Manager)
FSM (Facility Safety Manager)
The person responsible for providing building data/information to SCDF during emergencies.
PED Submission Procedure
PED Submission Procedure
Signup and view all the flashcards
Annual PED Review
Annual PED Review
Signup and view all the flashcards
Operational Survey
Operational Survey
Signup and view all the flashcards
PED Format
PED Format
Signup and view all the flashcards
ERP (Emergency Response Plan)
ERP (Emergency Response Plan)
Signup and view all the flashcards
CD Division Contingency Plan
CD Division Contingency Plan
Signup and view all the flashcards
Premises Emergency Data (PED)
Premises Emergency Data (PED)
Signup and view all the flashcards
Threat Assessment (PED)
Threat Assessment (PED)
Signup and view all the flashcards
Building Occupancy Load
Building Occupancy Load
Signup and view all the flashcards
Key Personnel (PED)
Key Personnel (PED)
Signup and view all the flashcards
Fire Protection Systems (PED)
Fire Protection Systems (PED)
Signup and view all the flashcards
Study Notes
Fire Safety Management - Premises Emergency Data
- Learning Outcomes: Learners will be able to outline the CD Division Contingency Plan, describe the essential Premises Emergency Data (PED) to be provided, and state the procedure for submitting and updating PED data.
Introduction
- Fire Safety Manager (FSM) Role: The FSM assists the Singapore Civil Defence Force (SCDF) by providing comprehensive building information to support effective emergency response.
- Building-Specific Risks: Different buildings have varying levels and types of risks.
- Data Use: The data enables SCDF Ground/Incident Commanders to make informed decisions regarding fire-fighting equipment and mitigation measures in emergencies.
- Contingency Planning: The Civil Defence Division (SCDF) creates a Contingency Plan for each building based on the provided data, addressing operational concepts and incident management.
- FSM Responsibility: The FSM is responsible for preparing the PED.
- Contingency Plan Details: The first part of the contingency plan is prepared by the CD Division and outlines the concept of operations and overall incident management at the premises.
Premises Emergency Data (PED)
- Purpose: The PED contains information needed by the SCDF Incident Commander during an emergency.
- Data Supplied: The FSM provides data about the building's risk assessment, occupancy, key personnel, emergency response resources, fire risk, and fire protection systems.
- Format: The information must follow the standard format outlined in Appendix D of the SCDF general guidelines for Emergency Response Procedures (ERP).
Procedure for Submission of PED
- Format Distribution: The CD Division HQ provides the PED format to the FSM.
- Data Completion: FSM fills in all required details of the building.
- Submission Deadline: The completed PED is submitted to the Division HQ within three months of notification.
- Annual Revisions: The Division HQ annually requests confirmation of any PED revisions from the FSM.
- Responsibility: The FSM is responsible to notify the Division HQ of required PED revisions between annual submissions.
- PED and ERP: The PED is part of the ERP but does not require separate submission of the full ERP to the SCDF.
Operational Survey
- Verification: The Division HQ conducts an operational survey within two months of receiving the PED to verify the submitted data.
- Corrections: Any inaccuracies in the PED will be amended. The FSM then resubmits the amended PED to the relevant Division.
- Verification Timeframe: The operational survey must be conducted within two months of receiving the PED
Additional Information
- Update Date: The document was updated on July 8, 2023.
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.