400-06 Fire Hydrant Maintenance Procedures
16 Questions
5 Views

400-06 Fire Hydrant Maintenance Procedures

Created by
@SoulfulPond

Questions and Answers

Who is responsible for ensuring the inspection, maintenance, and painting of hydrants in their first-due area?

  • The Company Commander (correct)
  • The Volunteer fire chief
  • The Central Fire Marshal
  • The GIS analyst
  • By what date should annual hydrant maintenance be completed to ensure proper repairs before winter?

  • December 1st
  • November 1st
  • September 1st
  • October 1st (correct)
  • What is the minimum clearance that should be maintained around hydrants to ensure visibility?

  • 48 inches
  • 24 inches
  • 36 inches (correct)
  • 30 inches
  • What should be done if a hydrant is missing from the Firehouse Software Hydrant Module?

    <p>Report it to the GIS Analyst via email</p> Signup and view all the answers

    Which safety techniques should members utilize when operating near hydrants?

    <p>Safety vests, spotters, and lane blocking</p> Signup and view all the answers

    What must be done within seven days of completing hydrant maintenance?

    <p>Enter data into Firehouse Software NFIRS Hydrant Module</p> Signup and view all the answers

    Which type of hydrants are included in the regular maintenance performed by fire stations?

    <p>Private hydrants with signed agreements</p> Signup and view all the answers

    What is the purpose of correlating hydrants to the map book(s)?

    <p>To align the hydrant locations with current records</p> Signup and view all the answers

    What should personnel do if a hydrant is deemed unsafe or non-operational?

    <p>Record it as out-of-service in the Firehouse Software</p> Signup and view all the answers

    When should the distribution list for 'Hydrants Pending Verification' be sent out?

    <p>Every Monday</p> Signup and view all the answers

    What is the purpose of placing a hydrant ring labeled 'BCoFD' on a hydrant?

    <p>To show the hydrant is out-of-service</p> Signup and view all the answers

    Who is responsible for assigning annual hydrant maintenance to each shift?

    <p>The Company Commander on 'C' shift</p> Signup and view all the answers

    If a shift has concerns about hydrant designations, who should they report to?

    <p>The Company Commander of 'C' shift</p> Signup and view all the answers

    When are the lists of hydrants for annual maintenance to be assigned?

    <p>By the last day of February</p> Signup and view all the answers

    What is the key emphasis regarding the operation of fire hydrants?

    <p>They must be accessible and operational</p> Signup and view all the answers

    What should be done if water can be safely obtained from the 4.5-inch steamer fitting?

    <p>The hydrant can remain in service</p> Signup and view all the answers

    Study Notes

    Fire Hydrant Repair Requests (Public)

    • Repairs handled by the Baltimore City Water Department.
    • Hydrants may only be placed out-of-service if they are non-operational or unsafe; if safe from the 4.5" fitting, they stay in service.
    • Out-of-service hydrants must be recorded in Firehouse Software (NFIRS) Hydrant Module promptly.
    • A labeled hydrant ring “BCoFD” is affixed to out-of-service hydrants.
    • Weekly verification of hydrants is conducted; company commanders must inspect those on the "Hydrants Pending Verification" list.

    Annual Fire Hydrant Inspection and Maintenance

    • Annual maintenance responsibilities are assigned by Company Commander of “C” shift by February's end.
    • Hirerarchy established amongst shifts for efficient assignments; conflicts reported to the Company Commander.
    • Career fire stations handle maintenance for all hydrants, including those on state highways and private hydrants with maintenance agreements.
    • Inspections, maintenance, and repainting of hydrants in their first-due area are mandatory.
    • Members must adhere to roadway safety techniques due to potential hazards.

    Hydrant Maintenance Protocols

    • Annual maintenance deadlines set for completion by October 1st to preempt winter issues.
    • Data updates for maintenance must occur within seven days in Firehouse Software (NFIRS) Hydrant Module.
    • Missing hydrants in Software should be reported to the GIS Analyst; ensure correlation with map books is regular.
    • Visibility of hydrants must be maintained; they should not be obstructed by vegetation or debris, ensuring 36” clearance.

    Additional Notes

    • Importance of proper inspection and maintenance of hydrants for operational readiness during emergencies.
    • Safety equipment such as vests, spotters, and lane-blocking should be used when working near roadways.
    • Maintenance agreements must be on file for private hydrants to ensure regular care and inspection.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    This quiz covers the procedures for fire hydrant repair requests and annual inspections as specified by the Baltimore City Water Department. It discusses the protocols for handling out-of-service hydrants, maintenance responsibilities, and the importance of timely verification. Perfect for fire department personnel involved in hydrant management.

    More Quizzes Like This

    3A2E3 C15 Obj 6
    15 questions

    3A2E3 C15 Obj 6

    WholesomeMaroon avatar
    WholesomeMaroon
    Fire Hydrant Water Supply System
    20 questions
    Inspección de Hidrantes
    51 questions

    Inspección de Hidrantes

    FastGrowingPhosphorus avatar
    FastGrowingPhosphorus
    Hydrant Water Availability Calculation
    29 questions
    Use Quizgecko on...
    Browser
    Browser