project 2 - 7 storey apartment building

StunningSugilite avatar
StunningSugilite
·
·
Download

Start Quiz

Study Flashcards

25 Questions

what would be the thickness and kind glass would you use of its shower enclosure

10mm tempered glass

what would be the best economical but appropriate lighting for this project

ceiling mounted lights

what would be the best and cost effective material for toilet

300x300 ceramic

what is the button part of an elevator which is used to request elevator when pushed

call

the putty or sealant compound uses to connect a glass is ____________

clear silicon

what is the minumum width of the common hallway, in meters

1.20

select the appropriate and cost-effective paint for the ceiling at the lobby

flat wall enamel

what is the nearest allowable maximum building footprint of the project rounded off to the nearest square meters

710

what is the minimum width of the common stair at the ground floor in nearest meters

1

what is the approximate length in meters of the car parking

5

an artificial stone made up of mixing cement, aggregates and water is _______ concrete

plain

what is the most common type of cement that is in general use

portland

which cement type has low hardening characteristics

portland pozzoland

crushed stones, crushed gravel or natural gravel with particles retained on a 5mm sieve is a _________ aggregate

fine

a closed loop of reinforcement bars that is used to hold the mail reinforcement bars of beam is called a

stirrups

a closed loop of reinforced cement bars that is used to hold the mail reinforcement bars in columns is called a

lateral ties

a composite material in which concretes relatively low tensile strength and ductility are counteracted by the inclusion of reinforcement having higher tensile strength and or ductility is a ______________

lateral tie

a composite material in which concretes relatively low tensile strength and ductility are counteracted by the inclusion of reinforcement having higher tensile strength and or ductility is a __________

reinforced concrete

which is NOT a raw material for rebar spacer

plastic

what is NOT considered a temporary facility needed during construction

sum pit

which part of the building elements is considered not part of architectural design drawings

details of shear wall

a graphic horizontals section looking up instead of down as normal drawing

ceiling plan

in what architectural design service phase does an architect renders the initial line drawings representing design studies leading to a recommended design solution including the general description of the project

schematic

the general term for precast materials that are fastened to a metal frame and carry no load is a _________ walls

precast curtain

what type of window designs that may be introduced on this project that will provide more space

bay

"Light Up Your Project: Discover the Best Cost-Effective Lighting Solutions" - Take this quiz to find out the most suitable and budget-friendly lighting options for your project. Learn about different types of lighting and their advantages, and get expert tips for creating a well-lit environment without breaking the bank. Whether it's for your home, office, or outdoor space, this quiz will guide you towards the perfect lighting solution.

Make Your Own Quizzes and Flashcards

Convert your notes into interactive study material.

Get started for free

More Quizzes Like This

Use Quizgecko on...
Browser
Browser