Podcast
Questions and Answers
In EWM, how can a storage group be utilized?
In EWM, how can a storage group be utilized?
- Assign the storage group to multiple storage bins. (correct)
- Use the storage group to define material flow.
- Use the storage group in POSC and LOSC. (correct)
- Assign the storage group as an intermediate storage type or storage bin.
What are the methods of storage control in EWM used to set up complex processes based on physical movement and warehouse structure?
What are the methods of storage control in EWM used to set up complex processes based on physical movement and warehouse structure?
- HU-oriented
- Process-oriented (correct)
- Warehouse-oriented
- Layout-oriented (correct)
In which scenario is setting up Process-Oriented Storage Control (POSC) in the warehouse possible?
In which scenario is setting up Process-Oriented Storage Control (POSC) in the warehouse possible?
- Unloading before counting
- Staging before loading
- VAS before putaway (correct)
- None of the above
When setting up an external step in Process-Oriented Storage Control (POSC), rule-based determination can be selected for which of the following?
When setting up an external step in Process-Oriented Storage Control (POSC), rule-based determination can be selected for which of the following?
What configuration is necessary to achieve complex processes in the warehouse for receiving and shipping, including multiple physical movements and resource changes?
What configuration is necessary to achieve complex processes in the warehouse for receiving and shipping, including multiple physical movements and resource changes?
When setting up complex inbound processes in EWM using Process-Oriented Storage Control (POSC), which of the following process steps can you choose?
When setting up complex inbound processes in EWM using Process-Oriented Storage Control (POSC), which of the following process steps can you choose?
In Process-Oriented Storage Control (POSC), what do you assign the external process step to?
In Process-Oriented Storage Control (POSC), what do you assign the external process step to?
If you're planning to set up Process-Oriented Storage Control (POSC) in the outbound process, which of the following are possible process steps?
If you're planning to set up Process-Oriented Storage Control (POSC) in the outbound process, which of the following are possible process steps?
When configuring Process-Oriented Storage Control (POSC) with Layout-Oriented Storage Control (LOSC), EWM always determines POSC first.
When configuring Process-Oriented Storage Control (POSC) with Layout-Oriented Storage Control (LOSC), EWM always determines POSC first.
When setting up a complex putaway process using Process-Oriented Storage Control (POSC), which of the following process steps are possible in the inbound process?
When setting up a complex putaway process using Process-Oriented Storage Control (POSC), which of the following process steps are possible in the inbound process?
In Layout-Oriented Storage Control (LOSC), the system creates two warehouse tasks: (1) to move Handling Units (HUs) from the source bin to the interim storage bin, and (2) to move HUs from interim storage bins to the final destination bin. Immediately after creation, what is the status of the first and second warehouse task?
In Layout-Oriented Storage Control (LOSC), the system creates two warehouse tasks: (1) to move Handling Units (HUs) from the source bin to the interim storage bin, and (2) to move HUs from interim storage bins to the final destination bin. Immediately after creation, what is the status of the first and second warehouse task?
In EWM, when configuring storage control for Process-Oriented Storage Control (POSC), which objects do you assign to the storage control to determine it?
In EWM, when configuring storage control for Process-Oriented Storage Control (POSC), which objects do you assign to the storage control to determine it?
In Process-Oriented Storage Control (POSC), which object in the external process step is assigned?
In Process-Oriented Storage Control (POSC), which object in the external process step is assigned?
When using Process-Oriented Storage Control (POSC) for inbound process steps with Handling Unit (HU) warehouse tasks required for storage control, which process step can have product warehouse tasks?
When using Process-Oriented Storage Control (POSC) for inbound process steps with Handling Unit (HU) warehouse tasks required for storage control, which process step can have product warehouse tasks?
The ______ is used for multi-step processes for putaway, picking or internal processes.
The ______ is used for multi-step processes for putaway, picking or internal processes.
Deconsolidation is a possible process step when setting up Process-Oriented Storage Control (POSC) in the stock removal process.
Deconsolidation is a possible process step when setting up Process-Oriented Storage Control (POSC) in the stock removal process.
Match the following EWM processes with their descriptions:
Match the following EWM processes with their descriptions:
In Process-Oriented Storage Control (POSC), what is the functionality of 'internal process' steps?
In Process-Oriented Storage Control (POSC), what is the functionality of 'internal process' steps?
You want to configure EWM to automatically determine the destination storage bin during the putaway process. Which EWM functionality should you use?
You want to configure EWM to automatically determine the destination storage bin during the putaway process. Which EWM functionality should you use?
In EWM, movements between the goods receiving zone to next operation steps such as deconsolidation, counting, and so on, will be performed via [ ] warehouse tasks.
In EWM, movements between the goods receiving zone to next operation steps such as deconsolidation, counting, and so on, will be performed via [ ] warehouse tasks.
The external process step is assigned to the warehouse process type for field step.
The external process step is assigned to the warehouse process type for field step.
You are asked to configure a scenario where goods need to undergo a quality inspection before being put away in their final storage bin. Which EWM storage control method is most suitable?
You are asked to configure a scenario where goods need to undergo a quality inspection before being put away in their final storage bin. Which EWM storage control method is most suitable?
Which warehouse task confirms the follow-on step?
Which warehouse task confirms the follow-on step?
External process steps are linked to ______ storage process steps.
External process steps are linked to ______ storage process steps.
The selection of labeling is covered under the picking process.
The selection of labeling is covered under the picking process.
Flashcards
Storage Group Use in EWM
Storage Group Use in EWM
Assign the storage group to storage bins and use it to define a breakdown of a storage type.
Methods of Storage Control in EWM
Methods of Storage Control in EWM
Layout-oriented and process-oriented storage control.
Possible Case for POSC
Possible Case for POSC
VAS before putaway supports POSC.
Rule-Based Determination in POSC
Rule-Based Determination in POSC
Signup and view all the flashcards
Configuration for Complex Processes
Configuration for Complex Processes
Signup and view all the flashcards
POSC Process Steps for Complex Inbound Processes
POSC Process Steps for Complex Inbound Processes
Signup and view all the flashcards
Assignment of External Process Step
Assignment of External Process Step
Signup and view all the flashcards
Possible Process Steps for Outbound POSC
Possible Process Steps for Outbound POSC
Signup and view all the flashcards
POSC and LOSC Determination Order
POSC and LOSC Determination Order
Signup and view all the flashcards
Possible Process Steps in Putaway using POSC
Possible Process Steps in Putaway using POSC
Signup and view all the flashcards
Warehouse Task Status in LOSC
Warehouse Task Status in LOSC
Signup and view all the flashcards
Objects Assigned to Storage Control
Objects Assigned to Storage Control
Signup and view all the flashcards
External Process Step Assignment
External Process Step Assignment
Signup and view all the flashcards
Process Step with Product Warehouse Tasks
Process Step with Product Warehouse Tasks
Signup and view all the flashcards
Study Notes
Storage Group Configuration in EWM
- Storage groups can be assigned to multiple storage bins.
- They can also be used in Process-Oriented Storage Control (POSC) and Layout-Oriented Storage Control (LOSC).
- Storage groups represent a logical or physical breakdown of a storage type.
- Within a storage type, storage bins can be combined based on the physics of the storage bin.
Methods of Storage Control in EWM
- Layout-oriented storage control caters to varying resource needs depending on warehouse layout (e.g., high rack storage).
- Process-oriented storage control handles diverse processes like unloading, deconsolidation, and Value-Added Services (VAS).
Use Case for Process-Oriented Storage Control (POSC)
- POSC is applicable when Value-Added Services (VAS) are performed before putaway.
- Inbound process steps include unloading, counting, deconsolidation, quality inspection, VAS, and putaway.
- Outbound process steps include picking, packing, VAS, staging, and loading.
Rule-Based Determination for External Steps in POSC
- Rule-based determination can be selected for destination storage bins in external process steps.
- Supported internal storage process steps include unload, deconsolidate, quality inspection, perform VAS, pack, stage, and load.
Configuring Complex Processes
- Storage process control is configured to achieve complex processes involving multiple physical movements and resource changes in receiving and shipping.
Process Steps for Complex Inbound Processes Using POSC
- Possible process steps include VAS, deconsolidation, and unloading.
Assignment of External Process Steps in POSC
- External process steps are assigned to internal process steps, representing warehouse processes.
- Internal process steps are predefined in SAP, e.g., unload, count, deconsolidate, putaway, remove from stock, pack, stage, and load.
Possible Process Steps for POSC in Outbound Processes
- Possible process steps include VAS, loading, picking, and packing.
POSC and LOSC Determination Order
- When POSC is configured with LOSC, POSC is always determined first.
- This begins with unloading in complex inbound processes with process steps and layout-oriented steps.
Possible Process Steps for Complex Putaway Processes Using POSC
- Possible process steps in the inbound process are deconsolidation, quality inspection, unloading, and VAS.
Warehouse Task Status in LOSC
- The first warehouse task (source bin to interim bin) has an open status immediately after creation.
- The second warehouse task (interim bin to final destination bin) has a waiting status initially.
- The second task activates upon confirmation of the first.
Objects Assigned to Storage Control for Determination in EWM
- Warehouse process type and Warehouse order creation rule.
- These are assigned in the customizing settings of warehouse order creation rule or warehouse process type setting.
Object Assigned to External Process Step
- The external process step is assigned to a work center.
- Configuration path: SCM Extended Warehouse Management -> Extended Warehouse Management -> Master Data -> Define Work Center for field Step
Warehouse Task Types in POSC
- Using HU warehouse tasks is a requirement for storage control.
- The final putaway process step can have product warehouse tasks.
- Movements between the goods receiving zone to next operation steps such as deconsolidation, counting, and so on, will be performed via HU warehouse tasks.
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.