Evolution of Human Building Techniques Quiz
10 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What are the three principal participants required for a construction project?

  • Owner, architect/engineer, contractor (correct)
  • Builder, architect, designer
  • Designer, technician, project manager
  • Owner, builder, design-builder

How has modern technology impacted the methods of construction?

  • Allowed construction to continue at a slower pace
  • Enhanced the effectiveness of primitive methods
  • Reduced the need for specialized knowledge
  • Replaced outdated tools with modern technology (correct)

What is the significance of the computer in modern construction projects?

  • It has revolutionized project administration on the Web (correct)
  • It has made project administration more complex
  • It has slowed down the pace of construction projects
  • It has reduced the need for a project team

When an owner enters into a contract, whom do they usually contract with to plan and design a project?

<p>Architect/engineer or design–build contractor (D)</p> Signup and view all the answers

What concept reduces the three principal participants to just two in a construction project?

<p>Design–build contract (C)</p> Signup and view all the answers

What is the primary responsibility of the owner during the design period?

<p>Set criteria for design, cost, and time limits (B)</p> Signup and view all the answers

What happens after the completion of the planning and design process under conventional contracts?

<p>The project is ready for construction and selection of construction contractors begins (B)</p> Signup and view all the answers

What is the role of periodic visits by the architect/engineer to the construction site?

<p>Observing general compliance with plans and specifications (B)</p> Signup and view all the answers

In the traditional contractual arrangement, how many prime contracts are usually made with the owner?

<p>Two - one with the architect/engineer and one with a single construction contractor (A)</p> Signup and view all the answers

What is the purpose of subcontracting with specialty contractors during a complex project?

<p>To better accomplish specific portions of the work (C)</p> Signup and view all the answers

More Like This

Construction Techniques Quiz
3 questions
Tanggam Kaedah dalam Pembinaan
17 questions

Tanggam Kaedah dalam Pembinaan

WorthBaritoneSaxophone avatar
WorthBaritoneSaxophone
Introduction to Construction Methods
11 questions
Use Quizgecko on...
Browser
Browser