Questions and Answers

In the context of hydraulic fracturing services, what is the significance of adhering to SP-1171 standard, as specified in the contract?

  • It guarantees the contractor's compliance with environmental regulations. (correct)
  • It ensures that all equipment used meets specific pressure ratings.
  • It mandates a specific Quality Management System (QMS) during all phases of service.
  • It outlines the procedures for well control during fracturing operations.

When a conflict arises between general specifications and particular specifications within a hydraulic fracturing service contract, which specification takes precedence?

  • The specification that provides the greatest safety margin is prioritized. (correct)
  • The particular specification takes precedence unless stated otherwise.
  • The company decides the specification that needs to be prioritized.
  • The general specification always prevails to maintain consistency.

Under what circumstance can the Company request tests that were not initially defined or agreed upon in the hydraulic fracturing service contract?

  • At any time, provided that the Company compensates the Contractor for the additional costs.
  • The company can request for any tests and the Contractor shall comply with Company's requirement.
  • Only if the original tests yield inconclusive results.
  • Only if there is a change in well conditions that warrants additional testing. (correct)

In the event that the contractor's policy necessitates a higher safety factor for pressure ratings than the company's standard, who bears the extra cost for complying with the more stringent requirement?

<p>The contractor is responsible for the additional cost. (C)</p>
Signup and view all the answers

What is the implication if noncompliance, deficiencies, or omissions are discovered during the Operational Period of a hydraulic fracturing service contract?

<p>The operational period is suspended until a revised contract is negotiated. (D)</p>
Signup and view all the answers

How are instruments of measure, including gauges, meters, and recorders, to be calibrated for hydraulic fracturing services, according to the specifications?

<p>Using a combination of metric and imperial units for redundancy. (B)</p>
Signup and view all the answers

What role does the Company play during the Contractor's audits, reviews, or surveillance activities related to the hydraulic fracturing service contract?

<p>The company provides direct supervision and guidance during these activities. (D)</p>
Signup and view all the answers

In a hydraulic fracturing context, what climatic conditions must a contractor take into account when performing services?

<p>Extreme climate conditions leading to heavy condensation and seasonal sand and dust storms. (B), High rainfall with consistently low humidity year-round. (C)</p>
Signup and view all the answers

What specifications should the contractor's equipment meet when performing services on wells, particularly concerning H2S and CO2 content?

<p>H2S up to 5 mol % and CO2 up to 10 mol %. (C)</p>
Signup and view all the answers

Before submitting documents to the Company for review and approval, what must the contractor ensure regarding documents from subcontractors and manufacturers?

<p>The contractor ensures these documents are adequate, suitable, correct, and endorsed by the Contractor. (C)</p>
Signup and view all the answers

In the provision of Well Engineering and Hydraulic Fracturing services, what is the correct website to obtain relevant documents?

<p><a href="https://livelink.pdo.co.om">https://livelink.pdo.co.om</a> (B)</p>
Signup and view all the answers

According to the specifications, what is the primary function of the fracturing manifold, as it relates to low pressure (LP) and high pressure (HP) sides?

<p>The manifold functions as a junction, connecting the LP side to the blender and the HP side to the pumps. (A)</p>
Signup and view all the answers

What specific capabilities must the control room within a hydraulic fracturing unit possess to effectively monitor and evaluate treatments?

<p>Capability of providing data acquisition during Hydraulic Fracturing and/or Stimulation operations. (C)</p>
Signup and view all the answers

What are the key requirements for the fracturing tanks utilized in hydraulic fracturing services, concerning their capacity and fluid compatibility?

<p>Capacity sufficient to support usable fluid requirement with compatibility of various types of fluids, and must be corrosion-protected. (D)</p>
Signup and view all the answers

In the context of a laboratory setup for hydraulic fracturing services, what specialized equipment is essential for designing and optimizing fracturing fluids?

<p>An HP/HT rheometer is essential to accurately design Hydraulic Fracturing and/or Stimulation fluids. (C)</p>
Signup and view all the answers

How does the design of a standalone pressure testing unit contribute to the safety and efficiency of hydraulic fracturing operations?

<p>It allows pressure testing without the presence of HFU pumps, minimizing overall downtime. (A)</p>
Signup and view all the answers

In the context of real-time data acquisition during hydraulic fracturing, how should this data be managed and reported, according to service specifications?

<p>Real-time data acquisition shall be reported per Company’s Site representative instructions. (C)</p>
Signup and view all the answers

In relation to hydraulic fracturing equipment specifications, under which standard should all fracture treating iron be restrained?

<p>As specified in PR-1448 standard. (C)</p>
Signup and view all the answers

In a hydraulic fracturing operation, what is the significance of ensuring a treewalker or tree saver is capable of being 'unstrung' with a specified wellhead pressure?

<p>Unstring capable of withstanding 10,000 psi wellhead pressure. (D)</p>
Signup and view all the answers

In the context of wireline operations, which procedure or guideline is most relevant to ensure safety and efficiency?

<p>PR-1034 Wireline Operations Procedure. (C)</p>
Signup and view all the answers

What specific drawings are required to be available at the well site at all times during the performance of hydraulic fracturing services?

<p>Diagram of unit layout; map of hazardous zones; noise map; drawings of high/low pressure systems; and drops layout. (C)</p>
Signup and view all the answers

Contractor shall ensure that hardcopies and/or electronic copies of documents listed hereunder are readily available to all Contractor Personnel for which they are relevant, including at Site, and that all Contractor Personnel for which they are relevant are fully familiar with their content. In case of conflict or contradiction, unless stated otherwise in the Contract, the order of priority of the documents included below shall be:

<p>Tables 1, 2, 3, 4 and 5. (D)</p>
Signup and view all the answers

What are the responsibilities of the Contractor concerning documents and updates related to the hydraulic fracturing operation?

<p>Contractor must monitor updates and inform Company of them, and ensure document access for personnel. (C)</p>
Signup and view all the answers

What considerations must the contractor make regarding access to documents related to the hydraulic fracturing operation?

<p>Contractor must ensure access to documents and updates, requesting access from the Company if needed. (D)</p>
Signup and view all the answers

Considering the specifications for hydraulic fracturing equipment, what is the crucial implication of ensuring that all fracture treating iron is restrained as per PR-1448 standard?

<p>It mitigates risks associated with equipment failure and potential harm to personnel and the environment. (C)</p>
Signup and view all the answers

In the event that a well requires a 2-3/8", 15,000 psi CTU for hydraulic fracturing, what condition would necessitate the use of a jet blasting tool with non-rotational design and a minimum 2,000 psi pressure drop across the nozzles?

<p>To facilitate the removal of scale deposits and ensure complete cleanout during reverse services. (B)</p>
Signup and view all the answers

When performing hydraulic fracturing services, how must the contractor ensure effective management and real-time reporting of data acquisition, considering the need for secure data transmission?

<p>By providing real-time data acquisition that is reported as per Company's Site representative instructions, transmitting data through an internet link to relevant Company Personnel located in the Capital Area, ensuring secure data transmission. (A)</p>
Signup and view all the answers

In the context of Quality Assurance and Quality Control during all phases of a hydraulic fracturing service contract, what is the primary requirement for the contractor's Quality Management System (QMS)?

<p>The QMS must be certified by an accredited certification agency covering all Services activities constituted in the Contract, and the contractor must comply with SP-1171 standard during all phases of the performance of Services. (A)</p>
Signup and view all the answers

Given the environmental conditions specified for hydraulic fracturing services, what strategic adaptation should a contractor implement to address the challenges posed by high relative humidity regularly leading to heavy condensation during nighttime?

<p>Applying a specialized coating on all equipment to prevent condensation and corrosion, alongside implementing protocols for regular inspections and maintenance to mitigate potential damage. (C)</p>
Signup and view all the answers

Flashcards

Services Conformity

Conforms to specifications in Article 1.0 & general specifications in Article 2.0. The particular spec prevails in conflict.

Environment Considerations

Contractor shall account for climate like high humidity, sandstorms, and rough roads.

S.I. Units Used

Metres, Cubic Metres, Deca Newtons, Kilo Pascals, Kilowatt, Celsius

Well Specifications

Depth: up to 6,500 m, Rating: up to 105,000 kPa, Temperature: up to 175° С, H2S: up to 10 mol %, CO2: up to 17.1 mol %.

Signup and view all the flashcards

Quality Assurance Standard

Contractor's Quality Management System (QMS) is certified by an accredited agency.

Signup and view all the flashcards

Inspection Notification

The company can audit and witness inspections, the contractor must give 30 days written notice.

Signup and view all the flashcards

Wellhead Connectors

Cameron's or OTIS's

Signup and view all the flashcards

Document Adherence

The contractor adheres to listed documents, and shall ask the company for access to them.

Signup and view all the flashcards

Update Monitoring

The contractor monitors document updates and informs the company of such updates.

Signup and view all the flashcards

Real-Time Data

Provide real-time stats on surface pressure, slurry rate, volume, and report it per Company Site instructions.

Signup and view all the flashcards

Sand feeder capabilities

It transfers proppant into the fluid system for all rates, and has a bin storing of 170 MT

Signup and view all the flashcards

Blender control features

Automatic computers monitor and control locally/remotely, and has a liquid/dry additive system with mass flow meters.

Signup and view all the flashcards

Control room capabilities

Monitors oil/gas well Hydraulic Fracturing/Stimulation. Has data acquisition, battery backup, and office-like console.

Signup and view all the flashcards

Fracture Treating Iron Restraint

Stipulate that all fracture treating iron shall comply with PR-1448 standard

Signup and view all the flashcards

Hydraulic controls

A hydraulic control system is operated to monitor HMVs, TR-SCSSSVs and SSVS.

Signup and view all the flashcards

Laboratory capabilities

It has facilities to support all facets related to lab testing, water analysis, and water bath

Signup and view all the flashcards

Mobile crane attributes

Operators for 24hr, overload alarm, reversing alarm, and are compliant with safety specs

Signup and view all the flashcards

Well site office

Provide a site office for the company's site representative with >=2 work places

Signup and view all the flashcards

CT suspension requirements

The equipment consists of hydraulic system, adjustable jack etc... It will have sufficient capacity to suspend injector head

Signup and view all the flashcards

Choke Manifold traits

Two changable sides side choke bean and/or adjustable choke. Complies with API 6A

Signup and view all the flashcards

Electrocoagulation characteristics

Control of treating of water with Electrocoagulation. This can handle 500m3

Signup and view all the flashcards

Attributes of Jet Blasting Tool

Minimum 2,000 psi pressure drop across nozzles

Signup and view all the flashcards

Study Notes

General Specifications

  • All services must adhere to particular specifications detailed in Article 1.0 and the general specifications in Article 2.0
  • Unless stated otherwise, the particular specification prevails in the event of conflict between particular and general specifications

Environment

  • Services must account for these climatic conditions:
    • Maximum black-bulb temperature: 85°C
    • Maximum shade temperature: 56°C
    • Minimum shade temperature: 8°C
    • Maximum daily temperature variation: 25°C
    • Maximum relative humidity: 100%
    • Minimum relative humidity: 11%
    • Average barometric pressure: 97.6 to 98.7 kPa
    • Maximum 3-second gust wind-speed: 35 m/s
    • Soil thermal resistivity: 2.5°C m/W
    • Solar radiation: 0.12 W/mm²
    • Maximum ground temp @ 800 mm below grade: 35°C
    • Maximum ground temp @ 500 mm below grade: 40°C
  • Contractor shall consider the high relative humidity, extreme weather such as sand and dust storms plus high intensity rainfall, and long journeys over graded roads.

Units of Measure

  • Services are measured by the System International system:
    • Length: Metres (m)
    • Volume: Cubic Metres (m³)
    • Weight: Deca Newtons (daN)
    • Pressure: Kilo Pascals (kPa)
    • Mud gradient: Kilo Pascals/metre (kPa/m)
    • Power: Kilowatt (kW)
    • Temperature: Celsius (C)
  • Measuring instruments, including gauges, meters and recorders, must be calibrated in S.I. units.
  • Contractor's calibration program is subject to review and audit.

Wells Specifications

  • Equipment must perform on wells with these specifications:
    • Depth: Up to 6,500 m
    • Rating: Up to 105,000 kPa
    • Temperature: Up to 175° С
    • H2S and CO2: H2S is up to 10 mol % and CO2 is up to 17.1 mol %

Pressure Ratings Specifications

  • Company's policies/procedures are used to determine a safety factor for pressure ratings.
  • Extra costs due to the contractor's higher safety factor are on the account of Contractor.

Quality Assurance and Control

  • The contractor is responsible for quality assurance during all phases of the contract, following SP-1171.
  • Quality Management System (QMS) must be certified by an accredited agency.
  • Quality control plans must be prepared by the Contractor and sequentially listed.
  • The company reserves the right to audit and witness inspections/tests with 30 days' notice.
  • The company can request any tests and will have personnel to assist with audits and reviews.
  • Contractor must correct noncompliance stages, deficiencies or omissions at any stage.

Company's Wellheads and Christmas Trees

  • Contractor will provide connectors and crossovers (flanged) in SP-1213 standard:
    • Cameron's wellhead connectors of various sizes with working pressures - Part numbers for each size and connection are listed.
    • OTIS's Christmas tree cap assemblies.
    • Side outlets of various flange sizes and working pressures.
    • Flow line connectors of various sizes and ANSI ratings.

General Specifications and Procedures

  • Contractor must adhere to listed documents on Effective Date or updates.
  • Contractor ensures access to these documents and informs of any updates.
  • Company issues instructions for updates to documents.
  • Contractor makes documents available to personnel.
  • Order of document priority is Tables 1, 2, 3, 4, and 5 unless stated otherwise.

Download Locations

Company Specifications, Procedures and Guidelines, and SIEP Standards

  • Includes specifications, procedures and guidelines, and SIEP standards covering various aspects of operations, health, safety, environment, and quality.
  • Also involves well engineering, management of change, lifting, hazardous areas, and more.
  • Lists recommended practices and specifications for maintenance, inspection of drilling equipment, well control, safety, and other aspects.

Other Standards

  • Mentions other standards like ANSI, ASME, ASTM, ISBN, HACH, and BS for specific aspects.

Drawings

  • Drawings available at well Site for services performance:
    • Diagram of Unit layout.
    • Map of hazardous zones 1 and 2 with SP-2311 and API RP 505.
    • Noise map of Unit.
    • High and low pressure system showing tanks and mixing facilities.
    • Drops layout.

Equipment and Fluid Specifications

  • Hydraulic Fracturing and Stimulation Equipment:
    • Requires HFU, 15,000 psi HP Scope and LP Scope, 2", 15,000 psi CTU, 2", 10,000 psi CTU, and/or 2-3/8", 15,000 psi CTU, and 2-3/8", 10,000 psi CTU..
    • Covers detailed specifications for fracturing pumps, tanks, sand feeders, liquid additive systems, hydration units, blenders, control rooms, relief valves, treating iron, tree savers, pump skids, transfer pumps, pressure testing pumps, annulus pumps, mixing equipment, control panels, mechanical zonal isolations, and laboratories.
    • Specifications for mobile cranes, forklifts, well Site offices and facilities,.
    • Also goes into detail for ambulances, buses, and more.

Sand Management Systems

  • The Sand Management Systems must be 15,000 psi and 10,000 psi, and require mobile cranes and forklifts.

Flow Back Loop

  • Flow Back Loop shall be provided including minimum specifications and requirments.
  • Includes 4-1/16" SSV flange connection and enough crossovers for different sizes of Christmas trees plus SSVs and TR-SCSSSV control panel with ESD system.

HFU and CTU Mobile Camps

  • Mobile and SMS camps are required.

Additional Equipment

  • Covers specifications for N2 converters, tanks, sand feeders and additional equipment like rigs.

CCTV Specifications

  • CCTV Milestone XProtect software covering areas for easy rigging-up and unit movements will be required.

Hydraulic Fracturing Fluid Specifications

  • Fluid system additives and concentrations will be specifically set, for certain temperatures.
  • Specifications include crosslinked fluid systems and linear gel fluids with the specific measurement and compounds that must be used for all.

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

Related Documents

More Like This

Climate Factors and Solar Access Quiz
3 questions
Factors Shaping Global Climate Patterns Quiz
12 questions
Natural Disasters in Canada Quiz
10 questions
Use Quizgecko on...
Browser
Browser