Questions and Answers

When are hire charges applicable for the plant?

  • From the date of delivery to the date of return. (correct)
  • For the time spent in transportation only.
  • From the day of the order till delivery.
  • Only when the plant is used on-site.

Who is responsible for the replacement of wear and tear parts during the hire period?

  • The hiring department only. (correct)
  • The Controller of Stores.
  • The railway only.
  • Both the railway and the hiring department.

What must be done to acquire spare parts during the hiring period?

  • They must be sourced only from the railway ex-stores depot. (correct)
  • Spares can be bought from multiple sources without restriction.
  • They can be purchased from any local supplier.
  • The hiring department can shop around for the best price.

How is the cost of breakage or loss of parts determined?

<p>It is shared based on the actual and assumed life of the part. (D)</p> Signup and view all the answers

What is the assumed life of machines when not otherwise specified?

<p>15 years. (A)</p> Signup and view all the answers

What is the primary purpose of creating an Engineering Plant Reserve on each railway?

<p>To avoid losses from forced sales of serviceable plant (A)</p> Signup and view all the answers

Which of the following items is NOT included in the Engineering Plant Reserve list?

<p>Steel beams (B)</p> Signup and view all the answers

Who has the authority to modify the items on the Engineering Plant Reserve list?

<p>The Chief Engineer (B)</p> Signup and view all the answers

Which of the following items represents a type of drilling machine included in the Engineering Plant Reserve?

<p>Pneumatic drilling machine (D)</p> Signup and view all the answers

What restriction is placed on the Stores Department regarding the Engineering Plant Reserve?

<p>They cannot hold separate stock for new building works (B)</p> Signup and view all the answers

Which item in the Engineering Plant Reserve is associated with lifting operations?

<p>Cranes (derrick scotch) (D)</p> Signup and view all the answers

What type of equipment includes items such as air compressors and steam hoists?

<p>Construction plant items (B)</p> Signup and view all the answers

What documentation is required when returning plant to the nearest stores depot?

<p>An Advice Note with specific information (A)</p> Signup and view all the answers

Which of the following details is NOT required on the Advice Note when returning plant?

<p>Current market value of the plant (A)</p> Signup and view all the answers

Under what condition may plant be transferred directly from one work to another?

<p>With the Chief Engineer's permission if in good condition (B)</p> Signup and view all the answers

Who is responsible for deciding what material is maintained in the Engineering Plant Reserve?

<p>The Engineering Department (B)</p> Signup and view all the answers

What should be done when new material is sent to the Reserve?

<p>The Controller of Stores should decide stocking location (A)</p> Signup and view all the answers

What is necessary regarding the storage of materials in the Engineering Plant Reserve?

<p>Records need to be kept for all items, even if just temporarily stored (D)</p> Signup and view all the answers

What condition qualifies plant for a transfer value fix by the Chief Engineer?

<p>Plant that is in good condition and requires no overhaul (A)</p> Signup and view all the answers

What label should be used on the Advice Notes for returning engineering plant?

<p>Engineering Plant Reserve (B)</p> Signup and view all the answers

Who maintains custody of materials in the Engineering Plant Reserve?

<p>The Stores Department (B)</p> Signup and view all the answers

Where should winches, dredgers, and pumps that require overhaul be kept?

<p>In or close to the relevant workshop (A)</p> Signup and view all the answers

What is the purpose of marking a plant with the letters 'E.R.'?

<p>To designate it as an Engineering Reserve item (B)</p> Signup and view all the answers

What type of plant should be kept close to loco shops?

<p>Portable engines with boilers (D)</p> Signup and view all the answers

How should pieces of plant from the same category be numbered?

<p>Using a fraction with the category number as the numerator (B)</p> Signup and view all the answers

Which information is NOT included in the Reserve Plant Register?

<p>Operating hours of the plant (A)</p> Signup and view all the answers

What document should be referred to for entering particulars on receipt of an Engineering Plant Reserve item?

<p>Advice Notes form (S. 1539) (C)</p> Signup and view all the answers

Which of the following best describes a tip wagon’s storage requirement?

<p>May require replacement of spare parts with minimal shop work (C)</p> Signup and view all the answers

What should be recorded in the Reserve Plant Register regarding the issuing of an item?

<p>Amount debited on issue (C)</p> Signup and view all the answers

What is the primary purpose of maintaining a Reserve Plant Register?

<p>To record the financial transactions related to Engineering Reserve items (D)</p> Signup and view all the answers

What key detail is associated with the Reserve Plant Number?

<p>The price list number assigned to general stores items (D)</p> Signup and view all the answers

What must be done before any inspection or repair work is initiated?

<p>Estimates of costs must be obtained and sent to the Chief Engineer for acceptance. (C)</p> Signup and view all the answers

How should the cost of inspection and repairs for returned items be allocated?

<p>It should be charged to the specific work concerned. (A)</p> Signup and view all the answers

What should be noted if repairs are estimated but not undertaken immediately?

<p>The value should be fixed after deducting the estimated cost of repairs. (C)</p> Signup and view all the answers

In cases where plant is debited on a hire basis, what should expenditure on inspection and repairs be charged to?

<p>Head A-2210, which covers all charges. (A)</p> Signup and view all the answers

What document should be utilized for each material brought on or returned to the Reserve?

<p>A Certificate of Inspection. (D)</p> Signup and view all the answers

What initial information should be included on the Engineering Reserve Plant Inspection Certificate?

<p>Reserve Plant No. and the completion status of the item. (C)</p> Signup and view all the answers

What should NOT be operated upon for recording the expenditure on repairs to plants?

<p>A suspense head or account. (C)</p> Signup and view all the answers

What should be included in the remarks section of the Engineering Reserve Plant Inspection Certificate?

<p>Status summary of the item's functionality. (D)</p> Signup and view all the answers

What happens to the second-hand value of an article upon its return for inspection?

<p>A difference is noted based on its condition at return. (A)</p> Signup and view all the answers

What is essential when estimating costs for repairs that may not be undertaken immediately?

<p>Estimate costs and note the decision on the Advice Note. (B)</p> Signup and view all the answers

What additional information must be included on the Advice Note when returning plant to the stores depot?

<p>Type of plant and maker's name (D)</p> Signup and view all the answers

In what condition may plant be transferred directly from one work to another without returning to the Reserve?

<p>If it is in good condition and fit for further use (D)</p> Signup and view all the answers

Who holds the responsibility for maintaining records of receipts, issues, and balances in the Engineering Plant Reserve?

<p>The Stores Department (B)</p> Signup and view all the answers

What is the role of the Controller of Stores when new material is sent to the Reserve?

<p>To decide the storage location for the material (C)</p> Signup and view all the answers

What should be indicated on the Advice Notes accompanying the plant returned to the stores depot?

<p>The title 'Engineering Plant Reserve' (D)</p> Signup and view all the answers

What does the Chief Engineer determine concerning the transfer value of plant?

<p>It is established using a defined formula for second-hand value (D)</p> Signup and view all the answers

What must be included in the records when material is either sent to or returned from the Engineering Plant Reserve?

<p>Entries that reflect a clear record without mixing with ordinary stocks (D)</p> Signup and view all the answers

What responsibility does the hirer have regarding inspection certificates while possessing the plant?

<p>The hirer is responsible for obtaining any required inspection certificates in due time. (A)</p> Signup and view all the answers

What conditions allow the railway to recall the plant from the hirer?

<p>The railway reserves the right to recall the plant with one month's notice or immediately for unforeseen emergencies. (C)</p> Signup and view all the answers

Which of the following actions must be taken upon the return of the plant?

<p>The plant is to be examined, and a statement of repairs, excluding fair wear and tear, must be sent to the hirer. (C)</p> Signup and view all the answers

How should the costs of repairs and replacements be managed if they exceed fair wear and tear?

<p>The costs for repairs and replacements above fair wear and tear shall be shared equally between parties. (B)</p> Signup and view all the answers

What is required to assess the condition of the plant upon return?

<p>An examination of the plant in railway shops is obligatory upon its return. (B)</p> Signup and view all the answers

What must be included in the agreement signed for hiring the plant?

<p>Confirmation of specific usage by departmental labor only (A)</p> Signup and view all the answers

Who monitors the recovery of hire and the return of the plant according to the procedures?

<p>The Accounts Officer, Stores (D)</p> Signup and view all the answers

When shall delivery of the hired plant be made?

<p>In the railway stores yard (C)</p> Signup and view all the answers

What additional cost must be covered by the hiring department besides hire charges?

<p>Freight and incidental charges (D)</p> Signup and view all the answers

What will be the supervision charges incurred by the railway during plant dispatch and receipt?

<p>12 percent of all direct charges incurred (A)</p> Signup and view all the answers

In the event that plant material is carried by rail, what dictates the carriage charges?

<p>Public tariff rates (D)</p> Signup and view all the answers

What is the responsibility of the hirer regarding the return of the plant?

<p>To return the plant to the same point at their own cost (A)</p> Signup and view all the answers

What should occur before any inspection or repair work is initiated?

<p>Estimates of the cost should be obtained and sent for acceptance. (B)</p> Signup and view all the answers

What is a key requirement of the Engineering Reserve Plant Inspection Certificate?

<p>Remarks section for additional comments (A)</p> Signup and view all the answers

How should the cost of repairs for items returned to the Plant Reserve be allocated?

<p>Allocated to the work concerned, including differences in value. (C)</p> Signup and view all the answers

Which authorization is needed to change items on the Engineering Plant Reserve list?

<p>Direct approval by the Chief Engineer (C)</p> Signup and view all the answers

When should the cost of repairs be estimated but not undertaken immediately?

<p>If it is doubtful the plant will be used in the near future. (A)</p> Signup and view all the answers

Which of the following best describes the responsibility regarding costs during the inspection and repair of hired plant?

<p>Debited to the plant's hire account if not undertaken immediately (D)</p> Signup and view all the answers

What information should be transcribed into the Plant Reserve Register after estimating repair costs?

<p>The estimated cost of repairs and deductions made. (B)</p> Signup and view all the answers

What should be done with the expenditure on inspection and repairs when the work is debited on a hire basis?

<p>Charged to head A-2210. (C)</p> Signup and view all the answers

What document should be obtained for all materials brought on or returned to the Reserve?

<p>Engineering Reserve Plant Inspection Certificate. (A)</p> Signup and view all the answers

What aspect should be indicated in the remarks section of the Engineering Reserve Plant Inspection Certificate?

<p>Condition of the material before inspection. (D)</p> Signup and view all the answers

What must accompany any requisitions placed on the Depot Officer by officials in charge of works?

<p>Countersignature from the Chief Engineer (A)</p> Signup and view all the answers

What is the primary condition for hiring out items from the Engineering Plant Reserve to private parties?

<p>It must serve public service interests and be handled by Departmental labor (B)</p> Signup and view all the answers

Which detail is mandated to be marked on the issue notes for plants issued from the reserve?

<p>The Reserve Plant Number (C)</p> Signup and view all the answers

What should be done with charges incurred from returning the plant to the stores depot?

<p>Borne by the party that returned the plant (C)</p> Signup and view all the answers

What is indicated by the label 'Engineering Plant Reserve' on outgoing issue documents?

<p>The classification of the item (D)</p> Signup and view all the answers

What must be done when new material is added to the Engineering Plant Reserve?

<p>The details should be registered in the Reserve Plant Register (C)</p> Signup and view all the answers

What key detail must be reflected in the remarks section of the Engineering Reserve Plant Inspection Certificate?

<p>Any modifications or enhancements made (D)</p> Signup and view all the answers

Which responsibility does the Chief Engineer hold in relation to plants maintained in the Engineering Plant Reserve?

<p>Fixing transfer values for equipment (C)</p> Signup and view all the answers

What should be kept in mind regarding the items likely to be idle for a considerable time in the Reserve?

<p>They may be leased out to private organizations with express permission (D)</p> Signup and view all the answers

What initial information is required on the Engineering Reserve Plant Inspection Certificate?

<p>The current condition of the plant (B)</p> Signup and view all the answers

Flashcards

Engineering Plant Reserve

A stock of construction equipment kept for future use.

Construction Plant Items

Equipment for construction work.

Purpose of Reserve

Avoid losses from selling usable gear needed later.

Air Compressors

Machines that compress air.

Signup and view all the flashcards

Boilers

For supplying steam to construction machinery.

Signup and view all the flashcards

Cranes

Heavy lifting construction equipment.

Signup and view all the flashcards

Railway Board Approval

Needed before creating a reserve and setting financial limits

Signup and view all the flashcards

Transfer of Plant to Reserve

When construction projects are completed, any reusable equipment should be sent to the Engineering Plant Reserve.

Signup and view all the flashcards

Advice Note (S. 1539)

A document used to record the transfer of equipment from a project to the Engineering Plant Reserve.

Signup and view all the flashcards

Information in Advice Note

The Advice Note must include details like the type of equipment, its cost, and which projects used it.

Signup and view all the flashcards

Direct Transfer to New Project

Instead of going to the Reserve, well-maintained equipment can be directly transferred to another project that needs it.

Signup and view all the flashcards

Transfer Value

The Chief Engineer decides the value of equipment transferred to a new project, based on its age and condition.

Signup and view all the flashcards

Engineering Department Responsibility

The Engineering Department determines which equipment is suitable for the Engineering Plant Reserve.

Signup and view all the flashcards

Stores Department Responsibility

The Stores Department manages the Engineering Plant Reserve, keeping track of equipment received, issued, and in storage.

Signup and view all the flashcards

Storage Location

Equipment in the Reserve should be stored in a convenient location with access for maintenance and repair.

Signup and view all the flashcards

Locating Reserve Plant

Different types of equipment are stored in specific locations, like workshops or loco shops, depending on their maintenance needs.

Signup and view all the flashcards

Reserve Plant Number

Each piece of equipment in the reserve gets a unique number for easy identification and tracking.

Signup and view all the flashcards

Reserve Plant Register

A logbook detailing the movement of all reserve equipment, including receipts, issues, and balances.

Signup and view all the flashcards

Estimated Scrap Value

The estimated value of an item at the end of its useful life for disposal or future use.

Signup and view all the flashcards

Book Value on Receipt

The current value of an item when it is returned to the reserve, factoring in depreciation and repairs.

Signup and view all the flashcards

Total Book Value

The combined value of all items in the reserve, calculated by summing up the individual book values.

Signup and view all the flashcards

Issue Notes

Documents used to record the issuance of equipment from the reserve to a specific work site.

Signup and view all the flashcards

Amount Debited on Issue

The cost of the equipment taken from the reserve is debited to the work site that borrowed it.

Signup and view all the flashcards

Cost of Inspection and Repairs

Before repairing a plant reserve item, get an estimate and send it to the Chief Engineer for approval.

Signup and view all the flashcards

Allocation of Inspection and Repair Costs

The cost of inspecting and repairing a plant reserve item is charged to the project it was used for. Additionally, the difference between the item's initial and current value is added to the project's cost.

Signup and view all the flashcards

Plant Reserve Usage in the Future

If it's uncertain whether a plant reserve item will be needed soon, repairs can be delayed. In this case, estimate the repair cost and reduce the plant's value accordingly.

Signup and view all the flashcards

Plant Hire Charges (A-2210)

When plant hire charges include all costs like inspection, repair, and depreciation, these expenses go under account A-2210.

Signup and view all the flashcards

Certificate of Inspection (Form S. 1919)

A certificate verifying the completeness and readiness for use of a plant reserve item.

Signup and view all the flashcards

Description of the Item

The certificate should include a detailed description of the plant reserve item to avoid confusion.

Signup and view all the flashcards

Spares Included

The certificate must list any spare parts that come with the plant reserve item.

Signup and view all the flashcards

Remarks

The inspection certificate allows for adding any additional remarks relevant to the plant reserve item.

Signup and view all the flashcards

Material Is Ready

The inspection certificate confirms that the plant reserve item is complete and ready for use.

Signup and view all the flashcards

Hire Charges

The cost of using equipment from the railway is calculated from the delivery date to the return date, with both dates included.

Signup and view all the flashcards

Liability for Wear and Tear

The department borrowing the equipment is responsible for replacing worn-out parts, like washers or packing, at their own cost.

Signup and view all the flashcards

Spares for Wearable Parts

Spare parts for replacing worn-out items must be purchased from the railway at their book price plus extra charges.

Signup and view all the flashcards

Breakage or Loss of Parts (Other Than Wearable)

If a part breaks or gets lost, the cost is shared between the railway and the hirer based on the remaining life of the part.

Signup and view all the flashcards

Loss of the Entire Plant

If the entire equipment is lost, the cost is divided using the same method as for a single broken part, based on remaining life.

Signup and view all the flashcards

Direct Transfer of Equipment

Instead of going to the Engineering Plant Reserve, well-maintained equipment can be directly moved to a new project that needs it, with the Chief Engineer's permission.

Signup and view all the flashcards

Custody of the Reserve

The Stores Department is responsible for managing the Engineering Plant Reserve, keeping detailed records of equipment received, issued, and in storage.

Signup and view all the flashcards

Storage of Reserve Equipment

Reserve equipment should be stored in a place that makes it easy to access for maintenance and repair, ideally close to workshops or loco shops.

Signup and view all the flashcards

Plant Reserve Management

The process of managing the Engineering Plant Reserve, including receiving, storing, issuing, and keeping track of equipment.

Signup and view all the flashcards

Plant Transfer to Reserve

When a construction project is finished, reusable equipment gets transferred to the Engineering Plant Reserve.

Signup and view all the flashcards

Plant Reserve Issue

When equipment from the Reserve is given to a new project.

Signup and view all the flashcards

Plant Hire Charges

Fees charged when equipment from the Reserve is used by other departments or private parties.

Signup and view all the flashcards

Plant Inspection Certificate

A document confirming that the plant reserve equipment is in good condition and ready for use.

Signup and view all the flashcards

Plant Reserve Number

A unique number assigned to each piece of equipment in the Engineering Plant Reserve for easy identification and tracking.

Signup and view all the flashcards

Plant Reserve Register

A detailed record of all equipment in the Reserve, including receipts, issues, and remaining balances.

Signup and view all the flashcards

Plant Reserve Cost Allocation

The cost of inspecting, repairing, and using equipment from the Reserve is allocated to the project that used it.

Signup and view all the flashcards

Plant Reserve Disposal

When equipment in the Reserve is no longer needed, it can be sold as scrap or used for other purposes.

Signup and view all the flashcards

What is the first step before repairing a plant reserve item?

Obtain an estimate of the repair cost and send it to the Chief Engineer for approval before any work is started.

Signup and view all the flashcards

Who pays for inspecting and repairing a returned plant reserve item?

The cost is charged to the project that used the item, along with the difference between its initial and current value.

Signup and view all the flashcards

What happens to inspection and repair costs when plant hire charges include all costs?

Expenses like inspection, repair, and depreciation are charged to account A-2210 when the plant hire charge covers everything.

Signup and view all the flashcards

What information should the Certificate of Inspection (Form S. 1919) include?

The certificate should include:

  1. Description of the plant reserve item
  2. List of any spare parts included
  3. Additional remarks relevant to the item's condition
Signup and view all the flashcards

What does the Certificate of Inspection (Form S. 1919) confirm?

It confirms that the plant reserve item is complete and ready for use.

Signup and view all the flashcards

What happens to the cost of spare parts for wearable items?

The borrowing department buys spare parts at the railway's book price plus extra charges.

Signup and view all the flashcards

Who is responsible for replacing worn-out parts during plant hire?

The department borrowing the equipment is responsible for replacing worn-out parts like washers or packing at their own cost.

Signup and view all the flashcards

Hirer's Responsibility

The person renting the equipment is responsible for obtaining necessary licences and permits, ensuring safe operation, and being liable for accidents caused by the equipment.

Signup and view all the flashcards

Railway's Right of Recall

The railway has the right to reclaim equipment with one month's notice or immediately in emergencies, without compensation to the hirer.

Signup and view all the flashcards

Shared Repair Costs

When repairs beyond normal wear and tear are needed, the railway and the hirer share the cost based on the equipment's remaining useful life.

Signup and view all the flashcards

What is the Engineering Plant Reserve?

A stock of construction equipment owned by the railway and kept for future use on projects.

Signup and view all the flashcards

Who can borrow equipment from the Reserve?

Other government departments can borrow equipment from the Engineering Plant Reserve, but they must follow specific rules and procedures.

Signup and view all the flashcards

How is equipment transferred to the Reserve?

When a construction project is finished, any reusable equipment is transferred to the Engineering Plant Reserve.

Signup and view all the flashcards

What are the terms of delivery for borrowed equipment?

The department borrowing the equipment is responsible for picking it up from and returning it to the railway stores yard.

Signup and view all the flashcards

What is the cost of borrowing equipment?

The department borrows equipment at a specific hire rate, and also pays for any packing, handling, and transportation costs.

Signup and view all the flashcards

Who manages the Engineering Plant Reserve?

The Stores Department manages the Engineering Plant Reserve, keeping track of equipment arriving, leaving, and stored.

Signup and view all the flashcards

Why is the Engineering Plant Reserve important?

The Engineering Plant Reserve ensures that valuable equipment is not sold off after a project, allowing for reuse on future projects.

Signup and view all the flashcards

What happens when equipment is borrowed from the Reserve?

The cost of the borrowed equipment is charged to the project using it, and a detailed record of the loan is kept.

Signup and view all the flashcards

How is the condition of equipment in the Reserve checked?

Before equipment is issued for use, an inspection certificate is created to ensure the item is in good working order.

Signup and view all the flashcards

What happens to equipment when it is no longer needed in the Reserve?

Equipment can be sold as scrap or used for other purposes, depending on its condition and remaining useful life.

Signup and view all the flashcards

Study Notes

Engineering Plant Reserve

  • Purpose: Avoid losses from forced sales of usable plant leftover from special projects. A reserve is created to ensure needed plant is available for future use.
  • Creation: Requires approval from the Railway Board, who set a maximum financial limit.
  • Inventory: Includes construction plant, including:
    • Air compressors
    • Air receivers
    • Boilers
    • Boring equipment (hand or power)
    • Concrete mixers
    • Cranes (derrick scotch)
    • Dregers
    • Drilling machines (hand/power/pneumatic)
    • Driving gear
    • Portable steam engines
    • Internal combustion engines
    • Locomotive engines (2 ft gauge)
    • Gantries for girder erection
    • Pneumatic hammers (rock drilling)
    • Hydraulic jacks
    • Screw jacks
    • Jolly boats
    • Lathes (construction)
    • Lorries (motor)
    • Mortar mills (steam)
    • Pumps and all types of pumping plants
    • Pile driving frames
    • Pile hammers (steam)
    • Screwing machines
    • Steam hoists
    • Stone crushers
    • Winches (crab/steam)
  • Separate Stock: Stores departments should not keep separate stock of these items for new work (not normal railway operations).
  • Transferring Plant: On completion of projects, engineers transfer unused plant to the nearest depot with additional info like type, maker, receipt date, and work allocation.
  • Marked Advice Notes: Notes should be marked "Engineering Plant Reserve".
  • Direct Transfer: Plant in good condition can be transferred to another project without returning to reserve, with chief engineer permission.
  • Custody: Stores department is responsible for all reserve plant materials. They need to record receipts, issues and balances.
  • Storage: Materials should be held near the workshop or loco shops if needed for repair, and separate records must exist.
  • Plant Numbering: Each machine gets a unique "E.R." (Engineering Reserve) number, often matching the price list number, or an additional category number if multiple machines in the same category exist. A separate reserve plant register is also maintained.
  • Inspection and Repairs: Plants returned to the depot need dismantling, repairs, and inspection. The Chief Engineer is responsible for arranging these.
  • Cost Estimation: Before any work for inspection or repair (other than routine maintenance), cost estimates need Chief Engineer approval.
  • Accounting of Hire Charges: The Controller of Stores manages recovery of hire charges and maintain records for each item.
  • Priced Ledgers: Each plant has its own priced ledger, with receipt, issue, and balance info for accurate accounting.
  • Posting to Ledger: Post entries related to plant reserve to the priced ledger, handling as single class for summaries.

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

Related Documents

More Like This

Power Plant Engineering
5 questions
Power Plant Engineering Quiz
3 questions
Industrial Plant Engineering Elements Quiz
40 questions
Use Quizgecko on...
Browser
Browser