Engineering Plant Reserve Overview
80 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

When are hire charges applicable for the plant?

  • From the date of delivery to the date of return. (correct)
  • For the time spent in transportation only.
  • From the day of the order till delivery.
  • Only when the plant is used on-site.
  • Who is responsible for the replacement of wear and tear parts during the hire period?

  • The hiring department only. (correct)
  • The Controller of Stores.
  • The railway only.
  • Both the railway and the hiring department.
  • What must be done to acquire spare parts during the hiring period?

  • They must be sourced only from the railway ex-stores depot. (correct)
  • Spares can be bought from multiple sources without restriction.
  • They can be purchased from any local supplier.
  • The hiring department can shop around for the best price.
  • How is the cost of breakage or loss of parts determined?

    <p>It is shared based on the actual and assumed life of the part.</p> Signup and view all the answers

    What is the assumed life of machines when not otherwise specified?

    <p>15 years.</p> Signup and view all the answers

    What is the primary purpose of creating an Engineering Plant Reserve on each railway?

    <p>To avoid losses from forced sales of serviceable plant</p> Signup and view all the answers

    Which of the following items is NOT included in the Engineering Plant Reserve list?

    <p>Steel beams</p> Signup and view all the answers

    Who has the authority to modify the items on the Engineering Plant Reserve list?

    <p>The Chief Engineer</p> Signup and view all the answers

    Which of the following items represents a type of drilling machine included in the Engineering Plant Reserve?

    <p>Pneumatic drilling machine</p> Signup and view all the answers

    What restriction is placed on the Stores Department regarding the Engineering Plant Reserve?

    <p>They cannot hold separate stock for new building works</p> Signup and view all the answers

    Which item in the Engineering Plant Reserve is associated with lifting operations?

    <p>Cranes (derrick scotch)</p> Signup and view all the answers

    What type of equipment includes items such as air compressors and steam hoists?

    <p>Construction plant items</p> Signup and view all the answers

    What documentation is required when returning plant to the nearest stores depot?

    <p>An Advice Note with specific information</p> Signup and view all the answers

    Which of the following details is NOT required on the Advice Note when returning plant?

    <p>Current market value of the plant</p> Signup and view all the answers

    Under what condition may plant be transferred directly from one work to another?

    <p>With the Chief Engineer's permission if in good condition</p> Signup and view all the answers

    Who is responsible for deciding what material is maintained in the Engineering Plant Reserve?

    <p>The Engineering Department</p> Signup and view all the answers

    What should be done when new material is sent to the Reserve?

    <p>The Controller of Stores should decide stocking location</p> Signup and view all the answers

    What is necessary regarding the storage of materials in the Engineering Plant Reserve?

    <p>Records need to be kept for all items, even if just temporarily stored</p> Signup and view all the answers

    What condition qualifies plant for a transfer value fix by the Chief Engineer?

    <p>Plant that is in good condition and requires no overhaul</p> Signup and view all the answers

    What label should be used on the Advice Notes for returning engineering plant?

    <p>Engineering Plant Reserve</p> Signup and view all the answers

    Who maintains custody of materials in the Engineering Plant Reserve?

    <p>The Stores Department</p> Signup and view all the answers

    Where should winches, dredgers, and pumps that require overhaul be kept?

    <p>In or close to the relevant workshop</p> Signup and view all the answers

    What is the purpose of marking a plant with the letters 'E.R.'?

    <p>To designate it as an Engineering Reserve item</p> Signup and view all the answers

    What type of plant should be kept close to loco shops?

    <p>Portable engines with boilers</p> Signup and view all the answers

    How should pieces of plant from the same category be numbered?

    <p>Using a fraction with the category number as the numerator</p> Signup and view all the answers

    Which information is NOT included in the Reserve Plant Register?

    <p>Operating hours of the plant</p> Signup and view all the answers

    What document should be referred to for entering particulars on receipt of an Engineering Plant Reserve item?

    <p>Advice Notes form (S. 1539)</p> Signup and view all the answers

    Which of the following best describes a tip wagon’s storage requirement?

    <p>May require replacement of spare parts with minimal shop work</p> Signup and view all the answers

    What should be recorded in the Reserve Plant Register regarding the issuing of an item?

    <p>Amount debited on issue</p> Signup and view all the answers

    What is the primary purpose of maintaining a Reserve Plant Register?

    <p>To record the financial transactions related to Engineering Reserve items</p> Signup and view all the answers

    What key detail is associated with the Reserve Plant Number?

    <p>The price list number assigned to general stores items</p> Signup and view all the answers

    What must be done before any inspection or repair work is initiated?

    <p>Estimates of costs must be obtained and sent to the Chief Engineer for acceptance.</p> Signup and view all the answers

    How should the cost of inspection and repairs for returned items be allocated?

    <p>It should be charged to the specific work concerned.</p> Signup and view all the answers

    What should be noted if repairs are estimated but not undertaken immediately?

    <p>The value should be fixed after deducting the estimated cost of repairs.</p> Signup and view all the answers

    In cases where plant is debited on a hire basis, what should expenditure on inspection and repairs be charged to?

    <p>Head A-2210, which covers all charges.</p> Signup and view all the answers

    What document should be utilized for each material brought on or returned to the Reserve?

    <p>A Certificate of Inspection.</p> Signup and view all the answers

    What initial information should be included on the Engineering Reserve Plant Inspection Certificate?

    <p>Reserve Plant No. and the completion status of the item.</p> Signup and view all the answers

    What should NOT be operated upon for recording the expenditure on repairs to plants?

    <p>A suspense head or account.</p> Signup and view all the answers

    What should be included in the remarks section of the Engineering Reserve Plant Inspection Certificate?

    <p>Status summary of the item's functionality.</p> Signup and view all the answers

    What happens to the second-hand value of an article upon its return for inspection?

    <p>A difference is noted based on its condition at return.</p> Signup and view all the answers

    What is essential when estimating costs for repairs that may not be undertaken immediately?

    <p>Estimate costs and note the decision on the Advice Note.</p> Signup and view all the answers

    What additional information must be included on the Advice Note when returning plant to the stores depot?

    <p>Type of plant and maker's name</p> Signup and view all the answers

    In what condition may plant be transferred directly from one work to another without returning to the Reserve?

    <p>If it is in good condition and fit for further use</p> Signup and view all the answers

    Who holds the responsibility for maintaining records of receipts, issues, and balances in the Engineering Plant Reserve?

    <p>The Stores Department</p> Signup and view all the answers

    What is the role of the Controller of Stores when new material is sent to the Reserve?

    <p>To decide the storage location for the material</p> Signup and view all the answers

    What should be indicated on the Advice Notes accompanying the plant returned to the stores depot?

    <p>The title 'Engineering Plant Reserve'</p> Signup and view all the answers

    What does the Chief Engineer determine concerning the transfer value of plant?

    <p>It is established using a defined formula for second-hand value</p> Signup and view all the answers

    What must be included in the records when material is either sent to or returned from the Engineering Plant Reserve?

    <p>Entries that reflect a clear record without mixing with ordinary stocks</p> Signup and view all the answers

    What responsibility does the hirer have regarding inspection certificates while possessing the plant?

    <p>The hirer is responsible for obtaining any required inspection certificates in due time.</p> Signup and view all the answers

    What conditions allow the railway to recall the plant from the hirer?

    <p>The railway reserves the right to recall the plant with one month's notice or immediately for unforeseen emergencies.</p> Signup and view all the answers

    Which of the following actions must be taken upon the return of the plant?

    <p>The plant is to be examined, and a statement of repairs, excluding fair wear and tear, must be sent to the hirer.</p> Signup and view all the answers

    How should the costs of repairs and replacements be managed if they exceed fair wear and tear?

    <p>The costs for repairs and replacements above fair wear and tear shall be shared equally between parties.</p> Signup and view all the answers

    What is required to assess the condition of the plant upon return?

    <p>An examination of the plant in railway shops is obligatory upon its return.</p> Signup and view all the answers

    What must be included in the agreement signed for hiring the plant?

    <p>Confirmation of specific usage by departmental labor only</p> Signup and view all the answers

    Who monitors the recovery of hire and the return of the plant according to the procedures?

    <p>The Accounts Officer, Stores</p> Signup and view all the answers

    When shall delivery of the hired plant be made?

    <p>In the railway stores yard</p> Signup and view all the answers

    What additional cost must be covered by the hiring department besides hire charges?

    <p>Freight and incidental charges</p> Signup and view all the answers

    What will be the supervision charges incurred by the railway during plant dispatch and receipt?

    <p>12 percent of all direct charges incurred</p> Signup and view all the answers

    In the event that plant material is carried by rail, what dictates the carriage charges?

    <p>Public tariff rates</p> Signup and view all the answers

    What is the responsibility of the hirer regarding the return of the plant?

    <p>To return the plant to the same point at their own cost</p> Signup and view all the answers

    What should occur before any inspection or repair work is initiated?

    <p>Estimates of the cost should be obtained and sent for acceptance.</p> Signup and view all the answers

    What is a key requirement of the Engineering Reserve Plant Inspection Certificate?

    <p>Remarks section for additional comments</p> Signup and view all the answers

    How should the cost of repairs for items returned to the Plant Reserve be allocated?

    <p>Allocated to the work concerned, including differences in value.</p> Signup and view all the answers

    Which authorization is needed to change items on the Engineering Plant Reserve list?

    <p>Direct approval by the Chief Engineer</p> Signup and view all the answers

    When should the cost of repairs be estimated but not undertaken immediately?

    <p>If it is doubtful the plant will be used in the near future.</p> Signup and view all the answers

    Which of the following best describes the responsibility regarding costs during the inspection and repair of hired plant?

    <p>Debited to the plant's hire account if not undertaken immediately</p> Signup and view all the answers

    What information should be transcribed into the Plant Reserve Register after estimating repair costs?

    <p>The estimated cost of repairs and deductions made.</p> Signup and view all the answers

    What should be done with the expenditure on inspection and repairs when the work is debited on a hire basis?

    <p>Charged to head A-2210.</p> Signup and view all the answers

    What document should be obtained for all materials brought on or returned to the Reserve?

    <p>Engineering Reserve Plant Inspection Certificate.</p> Signup and view all the answers

    What aspect should be indicated in the remarks section of the Engineering Reserve Plant Inspection Certificate?

    <p>Condition of the material before inspection.</p> Signup and view all the answers

    What must accompany any requisitions placed on the Depot Officer by officials in charge of works?

    <p>Countersignature from the Chief Engineer</p> Signup and view all the answers

    What is the primary condition for hiring out items from the Engineering Plant Reserve to private parties?

    <p>It must serve public service interests and be handled by Departmental labor</p> Signup and view all the answers

    Which detail is mandated to be marked on the issue notes for plants issued from the reserve?

    <p>The Reserve Plant Number</p> Signup and view all the answers

    What should be done with charges incurred from returning the plant to the stores depot?

    <p>Borne by the party that returned the plant</p> Signup and view all the answers

    What is indicated by the label 'Engineering Plant Reserve' on outgoing issue documents?

    <p>The classification of the item</p> Signup and view all the answers

    What must be done when new material is added to the Engineering Plant Reserve?

    <p>The details should be registered in the Reserve Plant Register</p> Signup and view all the answers

    What key detail must be reflected in the remarks section of the Engineering Reserve Plant Inspection Certificate?

    <p>Any modifications or enhancements made</p> Signup and view all the answers

    Which responsibility does the Chief Engineer hold in relation to plants maintained in the Engineering Plant Reserve?

    <p>Fixing transfer values for equipment</p> Signup and view all the answers

    What should be kept in mind regarding the items likely to be idle for a considerable time in the Reserve?

    <p>They may be leased out to private organizations with express permission</p> Signup and view all the answers

    What initial information is required on the Engineering Reserve Plant Inspection Certificate?

    <p>The current condition of the plant</p> Signup and view all the answers

    Study Notes

    Engineering Plant Reserve

    • Purpose: Avoid losses from forced sales of usable plant leftover from special projects. A reserve is created to ensure needed plant is available for future use.
    • Creation: Requires approval from the Railway Board, who set a maximum financial limit.
    • Inventory: Includes construction plant, including:
      • Air compressors
      • Air receivers
      • Boilers
      • Boring equipment (hand or power)
      • Concrete mixers
      • Cranes (derrick scotch)
      • Dregers
      • Drilling machines (hand/power/pneumatic)
      • Driving gear
      • Portable steam engines
      • Internal combustion engines
      • Locomotive engines (2 ft gauge)
      • Gantries for girder erection
      • Pneumatic hammers (rock drilling)
      • Hydraulic jacks
      • Screw jacks
      • Jolly boats
      • Lathes (construction)
      • Lorries (motor)
      • Mortar mills (steam)
      • Pumps and all types of pumping plants
      • Pile driving frames
      • Pile hammers (steam)
      • Screwing machines
      • Steam hoists
      • Stone crushers
      • Winches (crab/steam)
    • Separate Stock: Stores departments should not keep separate stock of these items for new work (not normal railway operations).
    • Transferring Plant: On completion of projects, engineers transfer unused plant to the nearest depot with additional info like type, maker, receipt date, and work allocation.
    • Marked Advice Notes: Notes should be marked "Engineering Plant Reserve".
    • Direct Transfer: Plant in good condition can be transferred to another project without returning to reserve, with chief engineer permission.
    • Custody: Stores department is responsible for all reserve plant materials. They need to record receipts, issues and balances.
    • Storage: Materials should be held near the workshop or loco shops if needed for repair, and separate records must exist.
    • Plant Numbering: Each machine gets a unique "E.R." (Engineering Reserve) number, often matching the price list number, or an additional category number if multiple machines in the same category exist. A separate reserve plant register is also maintained.
    • Inspection and Repairs: Plants returned to the depot need dismantling, repairs, and inspection. The Chief Engineer is responsible for arranging these.
    • Cost Estimation: Before any work for inspection or repair (other than routine maintenance), cost estimates need Chief Engineer approval.
    • Accounting of Hire Charges: The Controller of Stores manages recovery of hire charges and maintain records for each item.
    • Priced Ledgers: Each plant has its own priced ledger, with receipt, issue, and balance info for accurate accounting.
    • Posting to Ledger: Post entries related to plant reserve to the priced ledger, handling as single class for summaries.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Related Documents

    Description

    This quiz covers the key aspects of the Engineering Plant Reserve, including its purpose, creation process, and inventory items. Test your knowledge on various construction plant and machinery that can be included in the reserve. Understand the importance of managing these resources efficiently for future use.

    More Like This

    Power Plant Engineering
    5 questions
    Power Plant Engineering Quiz
    3 questions
    Use Quizgecko on...
    Browser
    Browser