E-Tagout Flashcards
52 Questions
100 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

The outside must go with which checker if any all to sign the tag?

2nd checker

What does the term piggy backing mean?

Hanging an electronic tag that has a previously attached physical tag on it.

What is a standard tag-out?

A prepared list of tags to allow more rapid issuing of tags in the event of a casualty or isolation for a large number of jobs.

When hanging a danger tag onto a component, what is the first step?

<p>Verify value, breaker, designation against the danger tag tors.</p> Signup and view all the answers

Is it normal to have multiple physical tags on the same component?

<p>False</p> Signup and view all the answers

Personnel, equipment hazards, and danger associated with maintenance for danger line items is in what block?

<p>Hazards/amplifying instruction.</p> Signup and view all the answers

What sheet must be printed to get CO's permission for tag-out?

<p>LIRS.</p> Signup and view all the answers

When do we use AAO'S?

<p>During heavy maintenance periods.</p> Signup and view all the answers

Which document provides information for PPE and safety for electronic/electric equipment?

<p>NSTM 300.</p> Signup and view all the answers

WAF'S and instruction for use can be found in what manual and what volume?

<p>JFMM V4 CH4.</p> Signup and view all the answers

When opening a breaker box and a danger tag falls out onto the ground, what would you do?

<p>Post a safety watch on the breaker and contact the Authorizing Officer.</p> Signup and view all the answers

Who can authorize single valve protection to a high energy system?

<p>CO.</p> Signup and view all the answers

Plastic danger tags are allowed?

<p>False</p> Signup and view all the answers

Double barrier protection is required when?

<p>High temp, high pressure, connected to the sea, hull penetration beneath the waterline, liquids with low flash points, oxygen, hazardous/toxic vapors, temporary seawater system with unlimited supply.</p> Signup and view all the answers

What do red flags in E-tagout indicate?

<p>Tags hanging.</p> Signup and view all the answers

What do green flags in E-tagout indicate?

<p>Tags issued.</p> Signup and view all the answers

What is restoration configuration?

<p>Position in which a component is to be placed once tags are cleared.</p> Signup and view all the answers

What sticker should be placed on the backside of a caution tag? What color is a caution tag?

<p>Amplifying instructions/Yellow.</p> Signup and view all the answers

Which tab is used for electronic signature?

<p>Line item verification tab.</p> Signup and view all the answers

Which document provides amplifying instruction specific to the Nimitz?

<p>NIMITZINST 9210.E.</p> Signup and view all the answers

What is placement config?

<p>Position in which a component is to be placed once tags are cleared.</p> Signup and view all the answers

What is the Nimitz instruction for electrical safety program?

<p>5100.2L.</p> Signup and view all the answers

What is the max length of extension cord allowed in flight deck or hangar bay?

<p>200 ft.</p> Signup and view all the answers

If tagging out DC equipment, which department must it be routed through?

<p>Engineering.</p> Signup and view all the answers

What are the requirements for line items issue and time to match in E-tagout?

<p>None.</p> Signup and view all the answers

What is on the back of a caution tag and its color?

<p>Instruction/Green.</p> Signup and view all the answers

When are cross checks required?

<p>When isolation affects more than just the system you are working on.</p> Signup and view all the answers

Which tags must DC tags be routed through no matter what?

<p>Engineering.</p> Signup and view all the answers

What color is an Out of Calibration sticker?

<p>Orange.</p> Signup and view all the answers

During CNO avails or dry dock when will the first audit for a tag be completed?

<p>Within 24 hours.</p> Signup and view all the answers

Tag out line items for PMS must contain formatting. What is the required format?

<p>Shop[PMS]MIP PERIODICITY EQUIPMENT DATE.</p> Signup and view all the answers

What does a blue flag in E-tagout indicate?

<p>Ready to be cleared.</p> Signup and view all the answers

When will the RA sign the danger tag?

<p>With the 2nd checker.</p> Signup and view all the answers

What is the Nimitz amplifying instruction for Tag Outs?

<p>9210.3E.</p> Signup and view all the answers

Which manual is not found in the tag out binder?

<p>NSTM 300.</p> Signup and view all the answers

When are locking devices allowed?

<p>False</p> Signup and view all the answers

What are the basic reasons for tag-outs IAW 9210.3E?

<p>300, SAFE, PMS, CORS, RIP, CAI, IEM.</p> Signup and view all the answers

What are standard tags and what are they used for?

<p>Pre-prepared tags to be used quickly during casualty.</p> Signup and view all the answers

When would you be required to print a LIRS sheet if E-tagout is still up and running?

<p>CO's permission, more than two RAs on the job.</p> Signup and view all the answers

Are tag-outs needed for pulling dead fuses?

<p>False</p> Signup and view all the answers

Is it okay to hang tags in absence of RA?

<p>False</p> Signup and view all the answers

Which tab do you annotate the auditing division in ESOMS?

<p>Line item verification.</p> Signup and view all the answers

Who is overall in charge of safety on the Nimitz?

<p>CO.</p> Signup and view all the answers

During dry dock the shipyard may have their own tagout binder which is not allowed to be audited by SF.

<p>True</p> Signup and view all the answers

What form is required for outside work?

<p>WAF.</p> Signup and view all the answers

Drawings from MSC are validated for how long?

<p>3 months.</p> Signup and view all the answers

Electrical safety checks are broken down into what categories?

<p>Personal, Portable, Mobile.</p> Signup and view all the answers

What does an orange tag in E-tagout signify?

<p>Tags staged.</p> Signup and view all the answers

Double barrier tagout is to be authorized by whom?

<p>AO.</p> Signup and view all the answers

When are tag-out audits conducted?

<p>Weekly, as needed.</p> Signup and view all the answers

What is the required signature for validation of drawing and isolation?

<p>AO.</p> Signup and view all the answers

What is TORS and whose permission is needed for authorized use over E-tag?

<p>Tag Out Record Sheet/Cheng.</p> Signup and view all the answers

Study Notes

E-Tagout Overview

  • E-Tagout is critical for safety during maintenance and isolation of equipment.
  • Utilizes electronic tags to indicate the status of components.

Key Definitions and Concepts

  • 2nd Checker: The outside must coordinate with this person to sign the tag.
  • Piggy Backing: Refers to attaching an electronic tag to a component that already has a physical tag.
  • Standard Tag-Out: Pre-prepared tags that expedite the tagging process during large-scale outages or equipment isolation.

Danger Tagging Procedures

  • Initial Step for Danger Tags: Verify the value, breaker, and designation against the related danger tags.
  • Multiple Physical Tags: Not permitted on the same component to maintain clarity and safety.

Risk Assessment and Documentation

  • Hazards Block: Contains personnel, equipment hazards, and associated dangers.
  • CO Permission Document: LIRS must be printed to obtain permission for tagout.
  • Nimitz Specific Instructions: "NIMITZINST 9210.E" provides amplifying instructions for tagging specific to the Nimitz.

Safety and Compliance Protocols

  • Authorized Personnel: Only the CO can authorize single valve protection for high-energy systems.
  • Plastic Danger Tags: Never allowed for safety reasons.
  • Double Barrier Protection: Required in high-risk situations such as high temperature, pressure, or hazardous materials.

Tag Indicators

  • Red Flags: Indicate tags hanging; caution is needed.
  • Green Flags: Show that tags have been issued and processes are activated.
  • Blue Flags: Indicate that components are ready to be cleared.

Tagging Conditions and Recommendations

  • Caution Tag Instructions: Amplifying instructions should be affixed on the back of a yellow caution tag.
  • Extension Cord Limit: Maximum length allowed in flight deck or hangar bay is 200 ft.
  • Locking Devices: Not permitted at any time in the tagging process.

Audit and Oversight Procedures

  • Tag-Out Audits Timing: Conducted weekly and as needed during maintenance checks.
  • Engagement of Engineering Department: Required for routing DC equipment tagging.

Precision and Requirement Compliance

  • No Tag Needed for Dead Fuses: Pulling dead fuses does not necessitate tagging.
  • Drawing Validation: Drawings from MSC are valid for three months and require AO approval for validation.
  • Presence of RA: Tags cannot be hung in the absence of the Responsible Authority (RA).

Nimitz Specific Protocols

  • Nimitz Electrical Safety Program: Documented in Nimitz Instruction 5100.2L.
  • Standardization for PMS Tag-Out: Must follow specific formatting: Shop[PMS]MIP PERIODICITY EQUIPMENT DATE.
  • Tag Out Requirements for WAFs: Work Authorization Forms are necessary for outside work.

Summary of Essential Contacts

  • CO's Role: Overall in charge of safety aboard the Nimitz, also responsible for authorizing various safety and isolation measures.
  • Auditing Division Tab: Line item verification tab in ESOMS is vital for annotation.

Conclusion

Understanding these aspects of E-Tagout ensures compliance with safety protocols and effective maintenance operations aboard ships.

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

Description

Test your knowledge on E-Tagout terminology with these flashcards. The quiz covers essential terms and definitions related to the E-Tagout process, including the roles of checkers and tag standards. Perfect for anyone involved in safety and compliance in the workplace.

More Like This

300-03 Lockout-Tagout
49 questions

300-03 Lockout-Tagout

ComfyCarolingianArt avatar
ComfyCarolingianArt
Lockout/Tagout Safety Overview
10 questions

Lockout/Tagout Safety Overview

ImprovingSocialRealism4496 avatar
ImprovingSocialRealism4496
Use Quizgecko on...
Browser
Browser