Who is required to sign the Architectural Permit?

Architect

Which permit requires the signature of a professional electrical engineer?

Electrical Permit

What permit form should be used by all applicants when applying for a building permit?

NBC Form B-01

Who is authorized to issue a building permit according to the text?

Building Official

What type of permit is required to be signed by a civil engineer?

Civil/Structural Permit

How many years of active practice are required to become a professional electrical engineer?

4 years

What documents are required if the applicant is the registered owner of the lot?

Certified true copy of OCT/TCT, Tax Declaration, and Current Real Property Tax Receipt

In addition to the required documents for registered owners, what else must an applicant provide if not the registered owner of the lot?

Duly notarized copy of the Contract of Lease or Deed of Absolute Sale

Why do some foreign companies in the Philippines enter into long-term leases for land?

Due to a prohibition on foreign land ownership

What paper size is commonly used for building plans according to Engr. Frederick D. Navo?

A3

What is the color of copies made on a 20" x 30" paper commonly used for building plans?

Shades of blue

What permits are required according to RULE III - PERMITS AND INSPECTION by Engr. Frederick D. Navo?

Validity IAPOA No.

What kind of systems are detailed plans required for in fire suppression systems?

Smoke detectors and alarm devices

Which document is required for sewage disposal systems?

Location Plan and Site Plan

What is needed for pest and vermin control facilities according to the text?

Location Plan and Site Plan

Which type of systems require a detailed plan of abatement and control device?

Sanitation facilities

What scale is the minimum required for the detailed plan and layout drawings of fire suppression systems?

1:100

Which of the following is not required for plumbing installations according to the text?

Heat/smoke ventilation system

What is the purpose of the Schedule of Finishes mentioned in the text?

To specify the surface finishes for floors, ceilings, walls, and trims in building spaces

Which of the following is not strictly required by building officials?

List of materials used

What type of documents are included in the Plumbing Plans section?

Cost estimates

What should be included in an Interior Wall Elevation according to the text?

Finishes, switches, doors, and outlets

Which type of system design is mentioned in the Electronics Documents section?

Process control design

What should be shown in the Plan and Layout of Interior as mentioned in the text?

Furniture layout at 1:100 scale

Which item is part of the Architectural Interiors/Interior Design as per the text?

Detail design of major architectural interior elements

What is included in the Geodetic documents section related to Lot Survey Plans?

Relocation Survey Plan and Report

What is the main focus of a Space Plan or Layout in architectural interiors based on the text?

Furniture layout and process layout

In the Electronics Documents section, what is the purpose of the General layout plans with legends?

Provide an overview of the system layout

Which type of system is NOT specifically mentioned in the Electronics Documents section?

Water supply systems

What details are provided in the Plumbing Plans section that are NOT mentioned in the Electronics Documents section?

Design analysis and technical specifications

Explore the schedule of doors and windows including types, designations, dimensions, materials, and number of sets. This quiz covers essential information for architectural elements.

Make Your Own Quizzes and Flashcards

Convert your notes into interactive study material.

Get started for free

More Quizzes Like This

Use Quizgecko on...
Browser
Browser