What is the main consideration for the voltage rating of a protective device?

It should be only slightly above the exchange fed voltage levels in the subscriber circuits.

What is the primary purpose of a protective device in a subscriber circuit?

To promptly operate when specified voltages or currents are reached.

What type of fuse is preferred in protective device assemblies?

Either normal fuse or self-restoring type fuse

Where should the protection arrangement be installed if there is no IDF?

At the MDF

What is the advantage of a self-restoring type fuse?

It can automatically restore itself after a fault

What is the purpose of daily measurements in a system without continuous automatic logging?

To track the battery set voltage and UPS/charger output/input voltage

What is the primary consideration for the current rating of a protective device?

It should be such that it does not produce noticeable heat in the components of the main equipment

What should the subscriber's protective device assembly consist of?

A single compact dust-proof unit containing fuse and lightning arrester

What is the frequency of checking the wiring of subscribers premises, CT boxes, and location boxes?

Yearly

What is the purpose of testing the individual cell voltage and load of batteries?

To check the sulphation of terminals

What is the frequency of cleaning the terminations in CT boxes and Location boxes?

Six monthly

What is the purpose of testing the service features from the Test Telephones?

To test the service features

What is the frequency of checking the cable termination MDF and IDF?

Monthly

What is the purpose of checking the earth resistance value?

To check the earth resistance value

What is the frequency of testing the spare cards?

Yearly

What is the purpose of testing the power supply system?

To test the power supply system

What is a primary requirement of the Man Machine Language (MML)?

It should be in common English

What should the MML structure ensure?

Addition of new functions has no influence on existing ones

What should the system ensure when executing a command?

No malfunctioning and/or overloading of the system

What should happen when a command error is detected by the system?

An error message is output

What is a requirement of the supervision system?

Continuous testing of the system

What type of supervision is required in the system?

Continuous supervision of its own power supply system

What should the system be able to do in case of a fault?

Detect, locate, and report faults

What should happen in case of a single hardware failure in the core system?

The system can be restored quickly in a new hardware

What is the recommended earthing arrangement in a telecom exchange room?

Two earth wires connecting Earth Electrodes to Earth Distribution Frame

What is the minimum requirement for the floor level in the exchange room?

The floor should be strictly level and high enough to avoid flooding

What is the recommended power supply arrangement in the exchange room?

Standard 230V AC single phase supply with voltage level display continuously

What is the primary purpose of providing separate rooms for the Operator Console, Power supply, Battery, and DG set in the exchange building?

To ensure the safety and reliability of the equipment and personnel

What is the recommended temperature range to be maintained inside the exchange equipment room?

22-25 degree C

What is the recommended arrangement for the equipment racks in the exchange room?

The equipment racks should be minimum 1 meter away from the wall and fixed on the floor

What is the purpose of providing underground ducts or overhead troughs in the exchange room?

To provide a route for the entry of UG cables and to run indoor cables

What is the recommended arrangement for the entry of UG cables in the exchange room?

The duct should be filled with sand and plastered on the top

During the inspection of a subscriber's office, what should be checked?

CT boxes, wiring, and batteries/power supply arrangement

What should be inspected by the Sr.Section Engineer/Telecom in a quarter year?

All exchanges and related installations

What should be measured during cable testing?

Only the insulation and loop resistance

What should be checked during hardware testing?

Manufacturer's instructions

What should be recorded during cable testing?

Only the insulation and loop resistance values

What should be checked during the inspection of an exchange?

Internal cabling, cabinets, and visual inspection of wiring

What should be maintained properly during periodical inspection?

Only the maintenance records and fault registers

Who should carry out a detailed inspection and testing once in a quarter year?

Sr.Section Engineer/Telecom

What is the primary function of the NGN network in the telecom exchange?

To provide a distributed trunk exchange with E1 links

What is the recommended way to connect IP phones to the LAN?

Using two Gigabit Ethernet ports on the IP phone

What is the purpose of using SIP Trunk/PRI gateway?

To connect to NGN or PSTN

What is the primary consideration for the IP phones used in the network?

They should be PoE enabled

What is the purpose of remote maintenance of the exchange?

To ensure secure access through SSH, HTTPS etc.

What is the advantage of using IP video phones?

They can be used for telephony

What is the primary function of the trunk exchange?

To handle all trunk calls

What is the recommended arrangement for the PoE switches?

They should have UPS backup

What is the primary purpose of a protective device in a subscriber circuit?

To prevent damage to the equipment due to overload or surge

What should the voltage rating of a protective device be?

Slightly above the exchange fed voltage levels

What type of device is preferred in protective device assemblies?

Self-restoring type fuse

Where should the protection arrangement be installed?

On IDF or MDF if there is no IDF

What is the purpose of daily measurements in a system without continuous automatic logging?

To take measurements manually

What should the subscriber's protective device assembly consist of?

A single compact dust-proof unit containing fuse and lightning arrester

What should be measured during daily measurements in a system without continuous automatic logging?

Battery set voltage and UPS/charger output/input voltage

What should be done daily in a system without continuous automatic logging?

Measure the battery set voltage and UPS/charger output/input voltage

What is done fortnightly in the Indian Railways Telecom Manual?

Testing of all trunk circuits

What is done during monthly maintenance?

BER test of all trunk circuits

What is done quarterly in the Indian Railways Telecom Manual?

Testing of All Service features from the Test Telephones

What is done six monthly in the Indian Railways Telecom Manual?

Line loop resistance and insulation testing

What is done yearly in the Indian Railways Telecom Manual?

Checking of wiring of subscribers premises

What is part of the daily routine in the Indian Railways Telecom Manual?

None of the above

What is part of the monthly routine in the Indian Railways Telecom Manual?

Specific gravity in case of non-VRLA batteries

What is part of the fortnightly routine in the Indian Railways Telecom Manual?

Individual cell Voltage and load test of the batteries

What is the main component to be checked during the inspection of a subscriber's office?

Lightning/surge arrester

What is the frequency of inspection of all exchanges and related installations by ADSTE/DSTE/Sr.DSTE?

Once a year

What is the purpose of checking the earth resistance value?

To check the connectivity of earth wires to each equipment

What is the primary purpose of cable testing?

To measure the insulation and loop resistance of cables for each subscriber

What is the purpose of checking the fault register (Electronic/Paper) during the inspection of an exchange?

To maintain the proper upkeep of maintenance records

What is the responsibility of Sr.Section Engineer/Telecom during the periodical inspection?

To carry out detailed and effective inspection and testing once in a quarter year

What is the purpose of checking the earth connections during the inspection of an exchange?

To measure the earth resistance value

What is the purpose of testing the hardware during the testing and commissioning of the telecom network?

To conduct hardware testing as per the manufacturer's instructions

Where should the IDF be accommodated in the exchange?

In the exchange equipment room

What type of cables should be used for outdoor connections?

Jelly filled underground type cables

What is the purpose of connecting an earth to the MDF frame?

To ensure effective use of protection devices

What should be the spare capacity for cables, cable terminals in CT Boxes?

30%

What is the purpose of the Main Distribution Frame (MDF)?

To connect exchange indoor and outdoor cables

Where should the outdoor cable termination box be located?

Outdoor, near the exchange

What should be done with the outdoor cable sheath when entering the exchange at MDF?

It should be earthed

Where should the protection arrangement be installed in the absence of an IDF?

Not specified

Study Notes

Protective Devices

  • A protective device should not decrease the efficiency of speech or signaling circuits.
  • The device should promptly operate in cases of specified voltages or currents being reached.
  • The voltage rating of the protective device should be only slightly above the exchange fed voltage levels in the subscriber circuits.
  • The device should promptly isolate the equipment and prevent further damage in cases of overload due to artificial or natural causes.
  • The current/voltage rating of the device should not produce noticeable heat in the components of the main equipment.
  • The device should be self-restoring type.
  • The prospective devices should consist of a normal fuse or self-restoring type fuse and lightning discharger.
  • The fuse should be connected in series with each external line.
  • The Integrated Protection Modules should be provided in case of Krone type connectors.
  • The rating of the fuse should be as per the requirement of exchange equipment.
  • The Protection arrangement should be installed on IDF or MDF if there is no IDF.
  • The subscriber's protective device assembly should consist of a single compact dust-proof unit containing a fuse and lightning arrester.

Maintenance

  • Preventive maintenance is required to ensure the system's reliability.
  • Measurements are to be taken manually in case of non-availability of continuous automatic logging features.
  • Daily measurements include:
    • Battery set voltage and UPS/charger output/input voltage.
    • Failure list of the subscribers.
  • Fortnightly measurements include:
    • Individual cell voltage and load test of the batteries.
    • Testing of all the trunk circuits.
  • Monthly measurements include:
    • Specific gravity in case of non-VRLA batteries.
    • The different modes of operation of FCBC.
    • Earthing connections of all equipment with earth electrodes.
    • All cabinets of equipment, man-machine interaction, terminal printer, and attendant consoles to be cleaned.
    • Cable termination MDF and IDF to be cleaned and checked.
    • Cable runs-inter rack, rack to IDF, MDF, and attendant consoles to be checked.
    • BER test of all trunk circuits.
    • Checking of lightning and surge protection devices.
    • Functional testing of attendant console if available.
    • Wiring and connecting terminals of power supply arrangement to be checked.
    • Data backup to be updated.
  • Quarterly measurements include:
    • Testing of all service features from the test telephones.
    • Cleaning of terminations in CT boxes, location boxes.
    • Complete testing of power supply system.
  • Six monthly measurements include:
    • Earth resistance value measurement.
    • Line loop resistance and insulation testing.
  • Yearly measurements include:
    • Checking of wiring of subscribers' premises, CT boxes, and location boxes.
    • Testing of spare cards.

Inspection

  • Subscriber's office:
    • CT boxes to be checked.
    • Wiring to be checked.
    • Lightning/surge arrester to be checked.
    • Batteries/power supply arrangement to be checked.
  • Cables:
    • Type of cable and length to be checked.
    • Cable route conditions to be checked.
    • All registers pertaining to cable laying and testing to be checked.
  • Exchange:
    • MDF/IDF wiring, connectors, terminals, fuses, and protection devices to be checked.
    • Earth connections and earth readings to be checked.
    • Power supply arrangement, battery registers, battery terminals, wiring, charger, and power panel to be checked.
    • Internal cabling, cabinets, and visual inspection of wiring to be checked.
    • Fault register (Electronic/Paper) to be checked.
  • Periodical inspection:
    • All exchanges and related installations should be inspected by ADSTE/DSTE/Sr.DSTE at least once in a year.
    • Maintenance records and fault registers should be checked for their proper upkeep.

Testing and Commissioning

  • Cable testing shall be conducted for each subscriber.
  • Insulation, loop resistance for cable is to be tested and recorded.
  • Provision of fuses, IPMs are to be checked for all lines.
  • The earth resistance for each earth electrode is to be measured.
  • The connectivity of earth wires to each equipment is to be checked.
  • Hardware testing shall be conducted as per the manufacturer's instructions.

Civil Infrastructure

  • The exchange room should be dustproof, with a false ceiling, mosaic/tile flooring, and windows with double doors.
  • Underground duct or overhead trough for running of indoor cables should be provided.
  • Separate Operator Console room, Power supply room, Battery room, DG set room, and MDF room should be provided.
  • Floor should be strictly level and high enough to avoid flooding.

Electrical Supply

  • Standard 230V AC single phase supply with voltage level display continuously should be available.
  • Alternate supply should be provided - either traction supply or DG supply.
  • The power supply should enter the room through MCB and changeover switch (preferably auto change-over) with proper earthing arrangement.

Environmental Conditions

  • The exchange equipment room should be air-conditioned.
  • 22-25 degree C should be maintained inside the room.
  • 50% standby air conditioners should be provided.
  • Lighting should be adequate for maintenance.

Equipment Installation

  • All equipment should be provided on racks.
  • Mounting on the walls should be avoided.
  • The equipment rack should be minimum 1 meter away from the wall.
  • The racks should be fixed on the floor with proper arrangement.
  • Underground ducts should be provided for entry of UG cables.
  • Duct/overhead troughs should be provided to run the indoor cables.
  • In case of UG cable entry, the duct should be filled with sand and plastered on the top.

IP Phone Requirements

  • IP phones in the network must be PoE enabled and draw power from PoE switches with UPS backup.
  • IP phones should have two Gigabit Ethernet ports: one for connecting to LAN on PoE and another for connecting PC through IP phone.
  • Local adaptors for phones may be avoided.

SIP Trunk/PRI Gateway Requirements

  • SIP Trunk/PRI gateway shall be used to connect to NGN or PSTN.
  • In cases where PRI from PSTN is a challenge, FXO can be used.

Telephone Requirements

  • Telephones used in VoIP exchanges shall be open standard, working with third-party exchanges/SIP servers.
  • Third-party SIP clients loaded on mobile phones using Wi-Fi shall also be possible.

Trunk Exchanges

  • Separate trunk exchanges are not required as trunk exchange function is handled by NGN network.
  • NGN uses MPLS network of RCIL to provide a distributed trunk exchange with which all zonal and divisional exchanges are connected using E1 links.
  • A backup for trunk connectivity at Zonal and divisional level may be done using direct E1/SIP/PRI connectivity.

Remote Maintenance

  • Provision for remote maintenance of the exchange from a remotely located operation & maintenance center shall be available.
  • Remote maintenance devices/interface should be built within the system.
  • All access should be through a secure method like SSH, HTTPS, etc.

System Capability

  • The system shall be capable of use as a local, tandem, transit exchange or combination of these.
  • The system shall also support Video telephony, allowing IP video phones to be used for telephony.

Subscriber Telephone Set

  • IDF shall have disconnecting type connectors with facility for isolating exchange indoor and outdoor side.
  • Cable terminals shall be installed on a rack, with protection arrangement available on the IDF.

Main Distribution Frame (MDF)

  • All outdoor cables shall be terminated on a rack forming the MDF, providing connectivity between outdoor cable and indoor switchboard cable.
  • The MDF shall be installed in a separate room, not in the exchange room, with an earth connected across the frame for its entire length.

Cables

  • Outdoor cables shall be jelly-filled underground type.
  • Indoor cables shall be twisted pair switchboard cables.
  • Outdoor cable shall have outdoor termination box/location box with terminals for proper termination of the cable.

Lightning and Surge Protection

  • It shall be provided as per chapter on "Protection of Telecom Equipments against Lightning".
  • The device shall promptly operate in cases of specified voltages or currents being reached.
  • The device shall promptly isolate the equipment and prevent further damage in cases of overload due to artificial or natural causes.

Maintenance Schedules

  • Daily: battery set voltage and UPS/charger output/input voltage, failure list of subscribers, working of lights, air conditioners, system status listing, failure history list, alarm checking, room temperature recording.
  • Fortnightly: individual cell voltage and load test of batteries, sulphation of terminals, testing of all trunk circuits.
  • Monthly: specific gravity in case of non-VRLA batteries, earthing connections of all equipment with earth electrodes, all cabinets of equipment to be cleaned, cable termination MDF and IDF to be cleaned and checked, BER test of all trunk circuits, checking of lightning and surge protection devices, functional testing of attendant console if available, wiring and connecting terminals of power supply arrangement, data backup to be updated.
  • Quarterly: testing of all service features from the test telephones, cleaning of terminations in CT boxes, location boxes, complete testing of power supply system.
  • Six-monthly: earth resistance value measurement, line loop resistance and insulation testing.
  • Yearly: checking of wiring of subscribers' premises, CT boxes and location boxes, testing of spare cards.

Inspection

  • Subscriber's office: CT boxes, wiring, lightning/surge arrester, batteries/power supply arrangement.
  • Cables: type of cable and length, cable route conditions, all registers pertaining to cable laying and testing.
  • Exchange: MDF/IDF wiring, connectors, terminals, fuses, protection devices, earth connections, earth readings, power supply arrangement, battery registers, battery terminals, wiring, charger and power panel.
  • Periodical inspection: all exchanges and related installations shall be inspected by ADSTE/DSTE/Sr.DSTE at least once a year, maintenance records and fault registers shall be checked for their proper upkeep.

This quiz covers the essential requirements for designing protective devices, including their impact on speech and signaling circuits, operating conditions, and voltage ratings.

Make Your Own Quizzes and Flashcards

Convert your notes into interactive study material.

Get started for free

More Quizzes Like This

Electrical Safety Systems Quiz
25 questions

Electrical Safety Systems Quiz

HumourousTropicalIsland avatar
HumourousTropicalIsland
Diodos: funciones y aplicaciones
6 questions
Electricidad: Seguridad y Aspectos Esenciales
12 questions
Use Quizgecko on...
Browser
Browser