DM306 Exam Part 7
66 Questions
16 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is a key challenge in ensuring that the design team and manufacturers make decisions in parallel?

  • Lack of communication between departments (correct)
  • Limited access to advanced technology
  • Overlapping roles and responsibilities
  • Inadequate market research
  • Why is it essential to match product design with advanced flexible manufacturing in DFMA?

  • To reduce production costs
  • To streamline material procurement
  • To enhance production efficiency (correct)
  • To improve product quality
  • What does successful implementation of DFMA require consideration of?

  • Customer preferences
  • Market competition
  • Regulatory compliance
  • Organizational capabilities (correct)
  • Which aspect of DFMA supports multidisciplinary, team-based activities?

    <p>Concurrent engineering</p> Signup and view all the answers

    What is a crucial consideration for the successful integration of DFMA according to the text?

    <p>Organizational structure and management issues</p> Signup and view all the answers

    Why is it important to have a good understanding of an organization's capabilities in DFMA?

    <p>To design products within production capacity</p> Signup and view all the answers

    What does the text suggest are the two main considerations when approaching DFMA?

    <p>Organizational issues and management, and methods and tools</p> Signup and view all the answers

    'DFMA requires the integration of diverse and complex information.' Why is this integration necessary?

    <p>To support team-based activities</p> Signup and view all the answers

    What do the organisational and management issues in DFMA primarily focus on?

    <p>Strengthening communication and coordination</p> Signup and view all the answers

    In DFMA, what is essential to ensure successful implementation?

    <p>Understanding organisation's capabilities</p> Signup and view all the answers

    What is a key factor to consider when trying to enhance the highly-valued functions of a product without increasing costs?

    <p>Improving battery storage</p> Signup and view all the answers

    Why is market research important in value analysis and value engineering?

    <p>To understand the value customers have for each function</p> Signup and view all the answers

    How can process and value stream mapping help in value analysis and value engineering?

    <p>Identifying individual component costs</p> Signup and view all the answers

    What is a primary requirement for effective execution of value analysis and value engineering?

    <p>Effective communication</p> Signup and view all the answers

    Why is understanding individual product component costs necessary in value analysis and value engineering?

    <p>To better evaluate manufacturing and assembly costs</p> Signup and view all the answers

    Which of the following is NOT a method mentioned in the text to obtain information about individual component costs?

    <p>Conducting market research</p> Signup and view all the answers

    What is an important consideration to identify costs associated with producing individual components?

    <p>Utilizing process and value stream mapping</p> Signup and view all the answers

    Why is it important to consider the stability of a product when enhancing its highly-valued functions?

    <p>To improve ease of carrying the product</p> Signup and view all the answers

    In value engineering, what should be done to enhance energy efficiency without adding extra cost?

    <p>Improve energy efficiency</p> Signup and view all the answers

    What role does manufacturing and assembly costs play in value analysis and value engineering?

    <p>Evaluating production costs</p> Signup and view all the answers

    What is a key aspect to consider in the 'value analysis and value engineering' process?

    <p>Material cost</p> Signup and view all the answers

    Which factor is essential when optimizing the design of a product without increasing costs?

    <p>Usability improvements</p> Signup and view all the answers

    In DFMA, what is a primary consideration for successful integration according to the text?

    <p>Balancing high-value functions</p> Signup and view all the answers

    Why is reliability an important aspect to consider in product design?

    <p>To minimize breakdowns</p> Signup and view all the answers

    What is a critical consideration regarding safety in product design?

    <p>Compliance with regulations</p> Signup and view all the answers

    Why is maintenance an important factor to evaluate in the design of a product?

    <p>To extend product lifespan</p> Signup and view all the answers

    What role does versatility play in assessing product value?

    <p>Diversifying market reach</p> Signup and view all the answers

    Why is user-friendliness a significant factor in product design?

    <p>To improve customer satisfaction</p> Signup and view all the answers

    How can the design of a product impact its overall value?

    <p>By reducing maintenance requirements</p> Signup and view all the answers

    Why is it important to evaluate the lifetime of a product during the design phase?

    <p>To identify opportunities for lifespan extension</p> Signup and view all the answers

    What is the primary benefit of ensuring a strong understanding of DFMA guidelines?

    <p>To improve product designs at an early stage</p> Signup and view all the answers

    What is the primary objective of Systematic Evaluation Methods in DFMA?

    <p>To evaluate a design against set standards or criteria</p> Signup and view all the answers

    Which of the following DFMA guidelines is most closely related to reducing production costs?

    <p>Design parts for ease of fabrication</p> Signup and view all the answers

    What is the primary benefit of using modular design in DFMA?

    <p>To reduce the total number of parts</p> Signup and view all the answers

    What is the primary purpose of designing parts to be multifunctional in DFMA?

    <p>To minimize the total number of parts</p> Signup and view all the answers

    What is a primary objective of DFMA Guidelines?

    <p>To provide a framework for economic manufacture and assembly</p> Signup and view all the answers

    Which aspect of product design is critical to consider in DFMA?

    <p>Matching product design with advanced flexible manufacturing</p> Signup and view all the answers

    What is a key benefit of considering interactions between product and manufacturing process?

    <p>Improving the communication between design teams and manufacturers</p> Signup and view all the answers

    What is a primary consideration for successful implementation of DFMA?

    <p>Integrating diverse and complex information</p> Signup and view all the answers

    What is a key challenge in DFMA?

    <p>Considering the organisation and management structure</p> Signup and view all the answers

    What is a primary focus of DFMA Methods and Tools?

    <p>Value analysis and cost reduction</p> Signup and view all the answers

    What is the primary objective of Value Engineering?

    <p>To increase product value without reducing cost</p> Signup and view all the answers

    What is the key difference between Value Analysis and Value Engineering?

    <p>Value Analysis focuses on detailed analysis of components, while Value Engineering focuses on broader scope</p> Signup and view all the answers

    What is the relationship between cost and value?

    <p>Cost refers to the effort required to obtain a commodity, while value is dependent on the circumstances of use</p> Signup and view all the answers

    What is the importance of identifying highly valued features or functions in a product?

    <p>To ensure those features account for the highest proportion of product cost</p> Signup and view all the answers

    What is the focus of Value Analysis?

    <p>Identifying and removing unnecessary costs</p> Signup and view all the answers

    What is the goal of increasing product value in Value Engineering?

    <p>To increase the value of the product to its purchaser while reducing the cost to its producer</p> Signup and view all the answers

    What is the advantage of combining parts in DFMA?

    <p>Combining parts reduces assembly time</p> Signup and view all the answers

    What is the primary consideration in DFMA when matching product design with advanced flexible manufacturing?

    <p>Ensuring easy assembly and disassembly</p> Signup and view all the answers

    What is the primary objective of DFMA Guidelines?

    <p>To provide all-encompassing rules for best practice in economic manufacture and assembly</p> Signup and view all the answers

    What is a key aspect of DFMA that supports Concurrent Engineering?

    <p>Organisational and Management Issues</p> Signup and view all the answers

    What is the primary focus of Value Analysis?

    <p>Cost reduction without compromising value to the customer</p> Signup and view all the answers

    What is a crucial consideration for the successful integration of DFMA?

    <p>Considering organisational and management issues</p> Signup and view all the answers

    What is the primary benefit of using DFMA Methods and Tools?

    <p>Supporting Concurrent Engineering</p> Signup and view all the answers

    What is the primary aim of the Assemblability Evaluation Method developed by Hitachi Ltd?

    <p>To improve design quality for better assembly</p> Signup and view all the answers

    Which of the following values is NOT calculated by the Assemblability Evaluation Method?

    <p>T – Total assembly time required</p> Signup and view all the answers

    What is the Lucas Method primarily used for?

    <p>To analyze the function and fitting of parts</p> Signup and view all the answers

    What is the primary benefit of using Systematic Evaluation Methods in DFMA?

    <p>To provide quantifiable values and results</p> Signup and view all the answers

    Which of the following is a characteristic of Systematic Evaluation Methods?

    <p>Follows the principles of the DFMA guidelines</p> Signup and view all the answers

    What is the primary objective of the Boothroyd & Dewhurst Method?

    <p>To reduce the amount of assembly required for existing products</p> Signup and view all the answers

    What is the primary goal of conducting Value Analysis and Value Engineering?

    <p>To maintain or increase the value of a product to the customer while reducing costs</p> Signup and view all the answers

    What is the first step in conducting Value Analysis and Value Engineering?

    <p>Strip down the product</p> Signup and view all the answers

    What is crucial to the success of Value Analysis and Value Engineering?

    <p>Effective communication among stakeholders</p> Signup and view all the answers

    What is the purpose of process and value stream mapping in Value Analysis and Value Engineering?

    <p>To identify opportunities for improvement in the production process</p> Signup and view all the answers

    What is the relationship between cost and value in Value Analysis and Value Engineering?

    <p>Value is increased without adding cost or cost is reduced without reducing value</p> Signup and view all the answers

    What is the purpose of determining the value of each function in Value Analysis and Value Engineering?

    <p>To prioritize improvements based on customer value</p> Signup and view all the answers

    Study Notes

    • DFMA, Design for Manufacture and Assembly, aims to make manufacturing and assembly easier and quicker without compromising on quality or functionality, leading to cost savings.
    • DFMA was developed in the late '70s and early '80s to optimize material costs, manufacturing processes, product complexity, and time to market.
    • 75% to 85% of overall product costs are committed during the design stage, making early consideration of DFMA crucial for eliminating future assembly costs.
    • DFMA supports lean manufacturing by optimizing design early to facilitate future manufacture and assembly processes.
    • Benefits of DFMA include supporting concurrent engineering, simplifying product structures, reducing costs, increasing productivity, and highlighting deficiencies in product design.
    • Challenges in implementing DFMA include understanding interactions between product and manufacturing processes, considering associated costs of design decisions, and ensuring parallel decision-making between designers and manufacturers.
    • DFMA approaches can be divided into organizational and management issues (supporting multidisciplinary activities) and methods/tools considerations for successful implementation.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    Explore the concepts of Design for Manufacture and Assembly (DFMA) in the context of engineering design and manufacture. Learn about the need for DFMA, its benefits, issues, and different approaches to implement it effectively.

    More Like This

    Use Quizgecko on...
    Browser
    Browser