Podcast
Questions and Answers
What is the main purpose of cross drainage works?
What is the main purpose of cross drainage works?
- To facilitate the flow of water from a higher drainage to a lower one (correct)
- To provide a water source for irrigation
- To build bridges and culverts
- To construct roads and highways
Where are cross drainage works typically used?
Where are cross drainage works typically used?
- In coastal areas for shoreline protection
- In urban areas for flood control
- In rural areas for irrigation
- In mountainous regions for water diversion (correct)
What is the primary benefit of cross drainage works?
What is the primary benefit of cross drainage works?
- Enhanced transportation infrastructure
- Increased crop yields
- Reduced risk of flooding (correct)
- Improved water quality
What type of structure is often used in cross drainage works?
What type of structure is often used in cross drainage works?
What is the primary goal of cross drainage works in relation to water flow?
What is the primary goal of cross drainage works in relation to water flow?
Flashcards are hidden until you start studying
Study Notes
Cross Drainage Works
- Cross drainage works involve the construction of structures to divert the flow of water from a natural watercourse or drainage basin to another watercourse or drainage basin.
- The primary objective of cross drainage works is to prevent waterlogging, flooding, and erosion in the donor basin, while also increasing the water availability in the recipient basin.
- Cross drainage works can be implemented through various methods, including the construction of canals, tunnels, and pipelines.
- These works can be used to transfer water from a surplus basin to a deficit basin, helping to meet the water demands of irrigation, industry, and municipal supplies.
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.