quiz image

CQA Tester Training: Compliance Submission

BeneficialSense avatar
BeneficialSense
·
·
Download

Start Quiz

Study Flashcards

30 Questions

What is the purpose of switching the Release Check Mode to Release during testing?

To check for differences in the build

Which of the following steps is NOT part of the Xbox One installation process described in the text?

Locate the .XVC files provided by your lead and drag them onto the Manager

What is the first step in the Switch installation process described in the text?

Connect your Switch to your PC using the relay box and USB cable

What is the purpose of the 'Release Check Mode' mentioned in the text?

To check for differences in the build

Which of the following is NOT a step in the Switch installation process described in the text?

Locate the .XVC file on your local drive and press OK to begin installation

What is the purpose of the 'CQA runs' mentioned in the text?

To perform installation and general testing

Which of the following is NOT a step in the Xbox One installation process described in the text?

Locate the .XVC files provided by your lead and drag them onto the Manager

What is the purpose of the 'Test Cases' mentioned in the text?

To change the settings for installation and general testing

What is the purpose of the 'relay box' mentioned in the Switch installation process?

To connect the Switch to the PC

What is the purpose of the 'Nintendo Target Manager' mentioned in the Switch installation process?

To add the Switch console to the Target List

The Release Check Mode should be switched to Debug at some point during testing.

False

The Xbox One Manager is opened before selecting the Add console option.

True

The.XVC files are usually provided by the manager in charge of the testing process.

False

The Switch must be connected to the PC using a HDMI cable in the E-DevKit.

False

In the Switch installation process, the build needs to be located on a local drive before installation begins.

True

The Release Check Mode should be switched to Test during general testing.

False

The Nintendo Target Manager should be opened before adding a Switch target.

True

The 'CQA runs' setting should not be changed during Test Cases.

False

Selecting 'Connect' in the Target List establishes the connection with the console in Nintendo Target Manager.

True

'Application or Patch' must be installed before locating the build on the local drive during Switch installation.

False

Match the following actions with their correct console: Open the Xbox One Manager

Xbox One = Select the Add console option in the top left Switch = Right click in the Target List and select Add Target

Match the following steps with their correct console: Connect your Switch to your PC, using the relay box and USB cable provided in the E-DevKit

Xbox One = Drag the .XVC file from windows explorer onto white area in the Manager Switch = Open Nintendo Target Manager

Match the following terms with their correct purpose: Release Check Mode

Release Check Mode = Should ideally be switched to Release at some point during testing to check for differences Nintendo Target Manager = Should be opened before adding a Switch target CQA runs = Use these settings for Installation and general testing in CQA runs, changing as required for Test Cases Test Cases = Changing as required for Test Cases

Match the following actions with their correct step: Right click in the Target List and select Add Target

Nintendo Target Manager = 'Application or Patch' must be installed before locating the build on the local drive Xbox One Manager = 'Locate the .XVC files generally provided by your lead

Match the following instructions with their correct process: Locate the build on your local drive and press OK to begin installation

Switch = 'Connect' in the list and select 'Connect' Xbox One = 'Connect' in the list and select 'Connect'

Match the following settings with their correct purpose: CQA runs

CQA runs = Use these settings for Installation and general testing in CQA runs, changing as required for Test Cases Release Check Mode = Should be switched to Test during general testing Test Cases = 'CQA runs' setting should not be changed during Test Cases Nintendo Target Manager = 'CQA runs' mentioned in Nintendo Target Manager

Match the following terms with their purpose: Relay box

Relay box = 'Connect your Switch to your PC, using the relay box and USB cable provided in the E-DevKit Release Check Mode = 'Connect your Switch to your PC, using the relay box and USB cable provided in the E-DevKit Nintendo Target Manager = 'Connect your Switch to your PC, using the relay box and USB cable provided in Nintendo Target Manager Test Cases = 'Connect your Switch to your PC, using HDMI cable in E-DevKit

Match the following actions with their correct sequence: Type in the console IP and press Add

Xbox One = 'Open Nintendo Target Manager' Switch = 'Type in console IP and press Add'

Match the following steps with their correct order: Open Nintendo Target Manager

Nintendo Target Manager = 'Right click on console in list and select Connect' Xbox One Manager = 'Right click on console in list and select Install Application or Patch' Switch = 'Open Nintendo Target Manager'

Match the following terms with their correct usage: .XVC files

.XVC files = .XVC files should be connected correctly through HDMI cable during installation

Learn about the role of a CQA tester in ensuring games pass Compliance Submission. Understand the checklist for functionality and the importance of thorough testing to avoid submission failures.

Make Your Own Quizzes and Flashcards

Convert your notes into interactive study material.

Get started for free

More Quizzes Like This

Mastering the Nintendo Switch
10 questions
Use Quizgecko on...
Browser
Browser