________ shall be fixed in a position on the surface of the earth by monuments of permanent nature.
________ shall be fixed in a position on the surface of the earth by monuments of permanent nature.
As per Sections __ and __, DAO No. 2007-29, the control surveys are defined and classified into geodetic and project control surveys.
As per Sections __ and __, DAO No. 2007-29, the control surveys are defined and classified into geodetic and project control surveys.
All Geodetic Control Surveys shall be conducted in the ________ using survey grade GNSS receivers.
All Geodetic Control Surveys shall be conducted in the ________ using survey grade GNSS receivers.
The calibration/testing and registration of the instrument prior to their use shall be in accordance with Section ___, DAO No. 2007-29.
The calibration/testing and registration of the instrument prior to their use shall be in accordance with Section ___, DAO No. 2007-29.
Signup and view all the answers
The project area selected shall be based on the recommendation of the ________ concerned.
The project area selected shall be based on the recommendation of the ________ concerned.
Signup and view all the answers
The person to be authorized to conduct the survey shall be a qualified professional pursuant to________, otherwise known as the Philippine Geodetic Engineering Act of 1998, as amended.
The person to be authorized to conduct the survey shall be a qualified professional pursuant to________, otherwise known as the Philippine Geodetic Engineering Act of 1998, as amended.
Signup and view all the answers
Survey Order as defined in Section 15 of DAO No. 2007-29 shall be issued by the _______Administrator.
Survey Order as defined in Section 15 of DAO No. 2007-29 shall be issued by the _______Administrator.
Signup and view all the answers
A copy of the Contract with the ______ shall be transmitted to the contractor and shall signal the start of survey activities.
A copy of the Contract with the ______ shall be transmitted to the contractor and shall signal the start of survey activities.
Signup and view all the answers
Organization of the Geodetic Control Survey Party – The _______ and its component shall be as determined by the Project Contractor or the Chief of Party.
Organization of the Geodetic Control Survey Party – The _______ and its component shall be as determined by the Project Contractor or the Chief of Party.
Signup and view all the answers
_________ - for general supervision, coordination activities, administrative and other related matters.
_________ - for general supervision, coordination activities, administrative and other related matters.
Signup and view all the answers
Manpower shall include computer literate personnel with knowledge on ______processing software.
Manpower shall include computer literate personnel with knowledge on ______processing software.
Signup and view all the answers
Field Operations – for reconnaissance, ______ setting, observations, and other related activities.
Field Operations – for reconnaissance, ______ setting, observations, and other related activities.
Signup and view all the answers
All personnel in the three components mentioned above shall be listed in the proposed________.
All personnel in the three components mentioned above shall be listed in the proposed________.
Signup and view all the answers
Geodetic Control Work Plan – The Work Plan shall be composed of Project Management and Technical Plans.
Geodetic Control Work Plan – The Work Plan shall be composed of Project Management and Technical Plans.
Signup and view all the answers
_______: It shall include activity costing and the bill of materials both for the office and field operations.
_______: It shall include activity costing and the bill of materials both for the office and field operations.
Signup and view all the answers
Equipment complement for the project and their corresponding allocation in the different phases of work, both in the office and in the field.
Equipment complement for the project and their corresponding allocation in the different phases of work, both in the office and in the field.
Signup and view all the answers
The estimated duration of the project expressed in number of days as per component project activities shall be presented in an _____Graph.
The estimated duration of the project expressed in number of days as per component project activities shall be presented in an _____Graph.
Signup and view all the answers
Study Notes
Survey Types and Regulations
- Control Surveys: Fixed positions on Earth's surface indicated by permanent monuments; classified into geodetic and project types.
- Relevant Sections: Sections 4 and 28 of DAO No. 2007-29 define and classify control surveys.
Geodetic Control Specifications
- Conducting Control Surveys: All geodetic control surveys must utilize survey-grade GNSS receivers and adhere to the Philippine Reference System of 1992.
- Instrumentation Requirements: Calibration, testing, and registration of survey instruments must follow Section 22 of DAO No. 2007-29.
Project Implementation
- Project Area Selection: Selected based on recommendations from the Regional Executive Director.
- Qualified Personnel: Conducting surveys requires a licensed professional under the Philippine Geodetic Engineering Act of 1998 (RA 8560).
Administrative Protocols
- Survey Order Issuance: Defined in Section 15 of DAO No. 2007-29, issued by NAMRIA.
- Contractual Procedures: A copy of the Contract with the "Notice to Proceed" is sent to the contractor, marking the official commencement date for survey activities.
Survey Organization and Management
- Survey Party Composition: Organized by the Project Contractor or Chief of Party; roles defined and coordinated by the Survey Party.
- Project Supervision: General supervision and administrative activities overseen by a Chief of Party, requiring licensing and qualifications per DAO No. 2007-29 and RA 8560.
Operational Components
- Office Operations: Includes data research, computations, and cartographic activities, necessitating personnel skilled in software such as AutoCAD.
- Field Operations: Involves reconnaissance and monument setting, essential for proper survey execution.
Project Documentation
- Personnel Listing: All individuals involved must be documented in the proposed Geodetic Control Work Plan, requiring licensed geodetic engineers for key positions.
- Work Plan Composition: Must include Project Management and Technical Plans, to be submitted to NAMRIA for project approval.
Financial Considerations
- Financial Plan Requirements: Includes activity costing and materials for office and field operations, covering miscellaneous expenses like document photocopying and map blueprints.
- Equipment Allocation: Surveying instruments to be specified in the plan, registered per Section 23 of DAO No. 2007-29.
Time Management
- Project Duration Presentation: Estimated project duration expressed in graphs such as Time and Motion Diagram or PERT-CPM, considering terrain and physiographic factors.
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.
Description
Test your knowledge on Control Surveys as per DMC 2010-13. This quiz covers key definitions, classifications, and principles of geodetic and project control surveys. Perfect for students and professionals in surveying and geospatial disciplines.