Construction Specification MCQs and Open Questions
15 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

Who developed the General Specifications of the Construction Specification 2003?

  • MRD
  • MLMUPC
  • MPWT (correct)
  • APSARA Authority
  • What types of activities are provided in the General Specifications?

  • Rehabilitation of existing road network
  • Construction of new highways and bridges
  • Maintenance of existing road and structures
  • All of the above (correct)
  • Which standard specifications have been used for materials testing in the General Specifications?

  • AASHTO
  • ASTM
  • AS
  • All of the above (correct)
  • What is the General Specification considered as?

    <p>Contract document</p> Signup and view all the answers

    In the context of the text, what is the force account workforce?

    <p>Workforce for day-to-day operations</p> Signup and view all the answers

    Which section of the Construction Specification covers Bituminous Works?

    <p>Section 4: Bituminous Works</p> Signup and view all the answers

    Who is responsible for all necessary arrangement for employing and maintaining the workforce required for the execution of the works?

    <p>Contractor</p> Signup and view all the answers

    Prior to the utilization all materials, manufactured articles and machineries in the project site, they must in all cases be approved by:

    <p>Engineer</p> Signup and view all the answers

    Before placing any purchase order for materials, manufactured articles and machineries to be incorporated in the works, the Contractor shall submit to __________for approval?

    <p>Engineer and Employer</p> Signup and view all the answers

    Materials or articles to be incorporated in the works shall be stored in such a manner as:

    <p>All of the above</p> Signup and view all the answers

    The contractor shall comply with all legal load restrictions in the hauling of materials on public roads.

    <p>True</p> Signup and view all the answers

    Who bears all responsibility and liability for all damages or injuries caused by hauling materials within the limits of the works?

    <p>Contractor</p> Signup and view all the answers

    Construction equipment spent ___________in the project site:

    <p>Eight-hour shift</p> Signup and view all the answers

    Method of construction shall be prepared and submitted by:

    <p>Either a) or b) above</p> Signup and view all the answers

    It is the responsibility of ______________to ensure the project land requirement is made available before the project started:

    <p>Relevant local authority</p> Signup and view all the answers

    Study Notes

    General Specifications

    • The General Specifications of the Construction Specification 2003 was developed by the Ministry of Public Works and Housing.

    Activities in the General Specifications

    • The General Specifications provide for activities such as construction, installation, and testing of materials and equipment.

    Standard Specifications for Materials Testing

    • The General Specifications use the standard specifications of the American Society for Testing and Materials (ASTM) for materials testing.

    Significance of the General Specifications

    • The General Specifications are considered as a tool for ensuring quality control and standards in construction projects.

    Force Account Workforce

    • The force account workforce refers to a workforce employed and maintained by the employer (usually the government) to execute the works.

    Bituminous Works

    • The section of the Construction Specification that covers Bituminous Works is Section 903.

    Responsibility for Employing Workforce

    • The Employer is responsible for making all necessary arrangements for employing and maintaining the workforce required for the execution of the works.

    Approvals for Materials

    • Prior to utilization, all materials, manufactured articles, and machineries must be approved by the Employer.

    Submission of Materials for Approval

    • Before placing any purchase order for materials, manufactured articles, and machineries, the Contractor shall submit to the Employer for approval.

    Storage of Materials

    • Materials or articles to be incorporated in the works shall be stored in such a manner as to prevent deterioration or damage.

    Compliance with Load Restrictions

    • The Contractor shall comply with all legal load restrictions in the hauling of materials on public roads.

    Liability for Damages

    • The Contractor bears all responsibility and liability for all damages or injuries caused by hauling materials within the limits of the works.

    Construction Equipment

    • Construction equipment is spent on-site for a significant amount of time.

    Method of Construction

    • The method of construction shall be prepared and submitted by the Contractor.

    Ensuring Project Land Availability

    • It is the responsibility of the Employer to ensure the project land requirement is made available before the project starts.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    Test your knowledge of construction specifications with this list of 160 multiple choice questions and 30 open questions. Prepared by lecturer CHAO Sopheak Phibal, this quiz covers various sections including General Specification, Earthworks, Bituminous Works, Drainage, and more.

    More Like This

    SB250 Standard Specifications Quiz
    14 questions

    SB250 Standard Specifications Quiz

    WellEstablishedCognition avatar
    WellEstablishedCognition
    Bridge Construction Specifications
    40 questions
    Concrete Specifications and Cover Standards
    37 questions
    Use Quizgecko on...
    Browser
    Browser