Construction Site Preparation and Development Quiz
5 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the purpose of the grading process in construction activities?

  • Leveling and preparation of the construction site (correct)
  • Installation of anchor bolts in concrete piers
  • Connection of electrical lines to each unit disconnect
  • Installation of rainwater leaders

Which activity is included in the site servicing for construction?

  • Structural Steel Framing
  • Installation of rainwater leaders and connection to the storm line
  • Fastening Techniques: Riveting, Bolting, Welding
  • Civil Site Servicing: Storm, water, and sanitary site servicing inside buildings (correct)

What does the building portion of construction activities include?

  • Structural Steel Framing
  • Fastening Techniques: Riveting, Bolting, Welding
  • Metal deck to OWSJ/Joist girder/Beam connection
  • Footings and Foundation walls (correct)

What are the main members of structural steel framing?

<p>Columns, Beams (D)</p> Signup and view all the answers

How are column-base connections made in construction activities?

<p>Made with anchor bolts/hold-down bolts (D)</p> Signup and view all the answers

More Like This

Use Quizgecko on...
Browser
Browser