Construction Site Preparation and Development Quiz
5 Questions
0 Views

Construction Site Preparation and Development Quiz

Created by
@TantalizingSheep

Questions and Answers

What is the purpose of the grading process in construction activities?

  • Leveling and preparation of the construction site (correct)
  • Installation of anchor bolts in concrete piers
  • Connection of electrical lines to each unit disconnect
  • Installation of rainwater leaders
  • Which activity is included in the site servicing for construction?

  • Structural Steel Framing
  • Installation of rainwater leaders and connection to the storm line
  • Fastening Techniques: Riveting, Bolting, Welding
  • Civil Site Servicing: Storm, water, and sanitary site servicing inside buildings (correct)
  • What does the building portion of construction activities include?

  • Structural Steel Framing
  • Fastening Techniques: Riveting, Bolting, Welding
  • Metal deck to OWSJ/Joist girder/Beam connection
  • Footings and Foundation walls (correct)
  • What are the main members of structural steel framing?

    <p>Columns, Beams</p> Signup and view all the answers

    How are column-base connections made in construction activities?

    <p>Made with anchor bolts/hold-down bolts</p> Signup and view all the answers