What is the purpose of the grading process in construction activities?

  • Leveling and preparation of the construction site (correct)
  • Installation of anchor bolts in concrete piers
  • Connection of electrical lines to each unit disconnect
  • Installation of rainwater leaders
  • Which activity is included in the site servicing for construction?

  • Structural Steel Framing
  • Installation of rainwater leaders and connection to the storm line
  • Fastening Techniques: Riveting, Bolting, Welding
  • Civil Site Servicing: Storm, water, and sanitary site servicing inside buildings (correct)
  • What does the building portion of construction activities include?

  • Structural Steel Framing
  • Fastening Techniques: Riveting, Bolting, Welding
  • Metal deck to OWSJ/Joist girder/Beam connection
  • Footings and Foundation walls (correct)
  • What are the main members of structural steel framing?

    <p>Columns, Beams</p> Signup and view all the answers

    How are column-base connections made in construction activities?

    <p>Made with anchor bolts/hold-down bolts</p> Signup and view all the answers

    More Like This

    Construction Site Preparation
    12 questions

    Construction Site Preparation

    MagnificentSeaborgium avatar
    MagnificentSeaborgium
    Site Preparation in Construction
    12 questions
    Site Set Up for Construction Projects
    10 questions
    1. Site Preparation
    25 questions

    1. Site Preparation

    Glimpse_Study avatar
    Glimpse_Study
    Use Quizgecko on...
    Browser
    Browser