What is the purpose of the grading process in construction activities?
What is the purpose of the grading process in construction activities?
- Leveling and preparation of the construction site (correct)
- Installation of anchor bolts in concrete piers
- Connection of electrical lines to each unit disconnect
- Installation of rainwater leaders
Which activity is included in the site servicing for construction?
Which activity is included in the site servicing for construction?
- Structural Steel Framing
- Installation of rainwater leaders and connection to the storm line
- Fastening Techniques: Riveting, Bolting, Welding
- Civil Site Servicing: Storm, water, and sanitary site servicing inside buildings (correct)
What does the building portion of construction activities include?
What does the building portion of construction activities include?
- Structural Steel Framing
- Fastening Techniques: Riveting, Bolting, Welding
- Metal deck to OWSJ/Joist girder/Beam connection
- Footings and Foundation walls (correct)
What are the main members of structural steel framing?
What are the main members of structural steel framing?
How are column-base connections made in construction activities?
How are column-base connections made in construction activities?