What is the principal participant in construction projects?

The owner

Which factor is important in determining the suitable arrangement of project participants?

The project timeline

What does the background material provide regarding the organizational aspects of selecting project participants?

Insight into roles and responsibilities of participants

What does the advancement of humankind have to do with the construction industry?

It led to the development of ancient civilizations

What is the purpose of selecting project participants based on the environment of a project?

To ensure project success

Who are some principal participants in construction projects?

The general contractor and subcontractors

What is the primary impact of large structures on human development?

Impact on all fronts including social, economic, and cultural

Why is the construction industry considered a kind of service rather than a manufacturing industry?

Because it is linked to a large number of trades

What are the main reasons for the widespread problems in the construction industry?

Highly uncertain nature of construction projects

What is the key to the success of any construction organization according to the text?

Adopting a scientific approach to construction project management

What is the objective of construction project management as a discipline?

To control Time, Quality, and Cost

What role does the owner play in a construction project?

Own and finance the facility or project

Why is efficient management important in the construction industry?

To cope with the increasing complexity of modern projects

What main challenges does the construction industry face according to the text?

(1) Unique and highly uncertain nature of construction projects; (2) Fragmented and highly competitive nature of the construction industry; and (3) Increasing challenges facing the industry as a whole.

What does the term '4 M’s' refer to in the context of construction?

(4) Key resources: Manpower, Materials, Machinery, and Money

What is the primary purpose of earthmoving in the construction process?

To move soil or rock from one location to another and process it for construction needs

Which factor has a major influence on the efficiency and profitability of a construction operation in terms of equipment selection?

Equipment production per hour

What characteristic primarily determines the trafficability of soil?

Moisture content of the soil

What does the cycle time in estimating equipment production per hour depend on?

Distance, grade, effective minutes per hour, speed, load, and type of soil

How is the cost per unit of earthmoving equipment calculated?

Equipment cost per hour / Equipment production per hour

What is the term used to refer to soil in its natural state before any disturbance?

Bank

What phenomenon occurs when a soil increases in volume after excavation due to the loosening of soil grains and air filling void spaces?

Swell

What is the unit volume identified as a loose cubic meter (LCM) for construction materials?

1.25 cubic meter

Which value is calculated by comparing the weight of soil in its natural state to the weight after excavation, expressed as a percentage?

Swell

What is used to simplify the conversion of loose volume to bank volume in earthmoving calculations?

Conversion factor

Test your knowledge about the principal participants in construction projects, including the owner, architect/engineer, consultant, general contractor, and subcontractors. Understand the various ways these participants join their efforts in a project and how the arrangement depends on the nature and size of the project.

Make Your Own Quizzes and Flashcards

Convert your notes into interactive study material.

Get started for free

More Quizzes Like This

Construction Project Participants
16 questions
Construction Project Progress
0 questions
CDT Workbook - Domain 1
31 questions
Roles in Construction Projects
12 questions
Use Quizgecko on...
Browser
Browser