Construction Project Management Quiz by zakaria qweder

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the primary role of the owner in a construction project?

  • To provide the financial resources for the project. (correct)
  • To oversee the day-to-day operations of the construction project.
  • To design the project and create construction plans.
  • To manage the subcontractors and ensure their work is completed on time and within budget.

Which of these is NOT a factor that influences the selection of participants in a construction project?

  • The project's budget.
  • The complexity of the project.
  • The cultural background of the project participants. (correct)
  • The geographical location of the project site.

The text mentions that the construction industry is "a kind of service rather than a manufacturing industry." What does this statement imply?

  • The construction industry is primarily focused on manufacturing building materials, but the service aspects are secondary.
  • Construction projects are not standardized and often involve unique needs and requirements. (correct)
  • Construction projects always involve some form of manufacturing, but the service aspect is primary.
  • The construction industry is purely service-based and does not involve any manufacturing processes.

What is one major reason cited for the common occurrence of cost overruns, time extensions, and conflicts in construction projects?

<p>The inherent uncertainty and complexity associated with construction projects. (B)</p> Signup and view all the answers

What is the main point conveyed by the examples of the pyramids of Egypt and other large-scale structures in the text?

<p>The human capacity for creative and challenging construction. (B)</p> Signup and view all the answers

Which of the following is NOT a key participant in a construction project?

<p>Government officials. (A)</p> Signup and view all the answers

The text highlights the importance of understanding the environment in which a construction project is initiated. What does this aspect refer to?

<p>The economic and political climate in which the project takes place. (D)</p> Signup and view all the answers

Which of the following statements best describes the role of technology and materials in the development of the construction industry?

<p>Technology and materials are crucial for meeting the increasing demands of the construction industry. (D)</p> Signup and view all the answers

Which type of contract is typically used for projects with a high degree of uncertainty and flexibility in design?

<p>Negotiated Cost-Plus (A)</p> Signup and view all the answers

Which of the following contract types offers the least incentive for the contractor to control costs and time efficiency?

<p>Cost + Fixed Percentage (A)</p> Signup and view all the answers

In a Unit Price contract, how is the final contract price determined?

<p>By multiplying the estimated quantities of work by the agreed-upon unit prices. (A)</p> Signup and view all the answers

Which contract type is most suitable for repetitive work where the quantities of work can be easily estimated from the design documents?

<p>Unit Price (C)</p> Signup and view all the answers

Which of the following is a potential disadvantage of a Cost + Fixed Fee contract?

<p>Lack of incentive for cost savings by the contractor. (B)</p> Signup and view all the answers

Why are Lump Sum contracts considered suitable for building projects with work items that cannot be easily quantified?

<p>The contractor assumes the risk of underestimating the required work. (A)</p> Signup and view all the answers

What is the main advantage of a Cost + Fixed Fee + Profit Sharing contract from the contractor's perspective?

<p>Increased incentive to minimize costs and improve efficiency. (C)</p> Signup and view all the answers

Which of the following contract types often leads to disputes and disagreements regarding variations in the work content?

<p>Unit Price (B)</p> Signup and view all the answers

Which of the following is NOT a factor to consider when determining the level of design/construction interaction required for a project?

<p>The availability of certain materials. (A)</p> Signup and view all the answers

What is a primary benefit for the owner when using a lump sum contract?

<p>Knowing the final price upfront. (D)</p> Signup and view all the answers

What type of project is NOT suited for a lump sum contract?

<p>Project with frequent design changes. (D)</p> Signup and view all the answers

Which of the following is a potential drawback for the owner when using a lump sum contract?

<p>Limited design flexibility. (A)</p> Signup and view all the answers

Why might some contractors avoid bidding on lump sum contracts?

<p>Lump sum contracts require a high level of upfront investment. (B)</p> Signup and view all the answers

What is the main difference between competitive bidding contracts and negotiated cost-plus contracts?

<p>Competitive bidding contracts involve a fixed price, while negotiated cost-plus contracts involve a variable price. (C)</p> Signup and view all the answers

Which of the following is a characteristic of a negotiated cost-plus contract?

<p>The contract allows for flexibility in addressing unforeseen issues. (B)</p> Signup and view all the answers

Which of the following is NOT a common form of competitive bidding contract?

<p>Cost-plus. (C)</p> Signup and view all the answers

Which of the following is NOT a factor in the decision to bid unbalance?

<p>The duration of the project (A)</p> Signup and view all the answers

In Example 1, what is the total indirect cost for the project?

<p>$15,000 (A)</p> Signup and view all the answers

In Example 2, what is the total cost of all activities in the project?

<p>$20,800 (A)</p> Signup and view all the answers

What is the purpose of a two-payment scheme as described in the text?

<p>To accommodate the owner's budgetary constraints (D)</p> Signup and view all the answers

In Example 1, what is the retainage amount for the first month?

<p>$500 (D)</p> Signup and view all the answers

In Example 2, how much is the contractor's net payment for the first period?

<p>$1,440 (C)</p> Signup and view all the answers

What is the primary purpose of the 'AON Network' diagram?

<p>To illustrate the sequence of activities in a project. (C)</p> Signup and view all the answers

What is the difference between 'costs', 'expenses', and 'bid prices' as defined in the text?

<p>Costs are the actual expenditures, expenses are the immediate outlays, and bid prices represent the estimated total project cost. (A)</p> Signup and view all the answers

What is the difference between "expenses" and "costs" as defined in the text?

<p>Expenses represent the portion of costs incurred at a specific time, while costs encompass all expenses throughout the project. (A)</p> Signup and view all the answers

How many periods are used in the cash flow calculations described in the text?

<p>6 (B)</p> Signup and view all the answers

Which of these sections is NOT part of the cash flow calculations table described in the text?

<p>Project timeline breakdowns. (C)</p> Signup and view all the answers

What is the purpose of the "Line of Balance" approach in project scheduling?

<p>To optimize the allocation of resources and ensure timely project completion. (C)</p> Signup and view all the answers

What is the formula for calculating the "Desired Rate (R)" in project scheduling?

<p><strong>(n-1) / (TL-T1 + TF)</strong> (D)</p> Signup and view all the answers

How is the "Lay-off and Recall" method used in practical scheduling?

<p>To temporarily stop work on a project to save time and resources, and then resume later. (D)</p> Signup and view all the answers

What is the primary purpose of "CPM calculations" in scheduling a project?

<p>To determine the critical path of the project and identify any potential delays. (B)</p> Signup and view all the answers

How many crews are needed to complete the construction of 6 houses in 27 days, assuming 8 work hours per day?

<p>4 (A)</p> Signup and view all the answers

In a Cost + Sliding Fee contract, how does the contractor's fee change in relation to the actual cost compared to the target cost?

<p>The fee increases linearly as the actual cost decreases compared to the target cost. (C)</p> Signup and view all the answers

What is the main characteristic of a Cost + Guaranteed Maximum Price (GMP) contract?

<p>The contractor is reimbursed for their actual costs, but the total price is capped at a pre-determined value. (B)</p> Signup and view all the answers

Which of the following contract types is considered to have the highest level of risk for the contractor?

<p>Lump Sum (A), Unit Price (D)</p> Signup and view all the answers

What are the two basic contractual relationships between an owner and a project participant?

<p>Agent and Non-Agent (C)</p> Signup and view all the answers

What is an example of an agent relationship in project delivery?

<p>The contract between an owner and an A/E firm. (C)</p> Signup and view all the answers

What is a non-agent relationship in project delivery?

<p>A regular legally binding contract to perform a service, such as the contract between the owner and the contractor. (B)</p> Signup and view all the answers

How do contractual relationships differ within various project delivery methods?

<p>Contractual relationships can vary depending on the chosen delivery method. (D)</p> Signup and view all the answers

What are Figs. 7 and 8 in the text likely to illustrate?

<p>The different types of contractual relationships associated with various project delivery methods. (C)</p> Signup and view all the answers

Flashcards

Construction Project

A planned work to construct one or more facilities.

Principal Participants

Key individuals in a construction project: owner, architect/engineer, consultant, general contractor, subcontractors.

Project Delivery Approach

The method used to organize and deliver the construction project to the stakeholders.

Contract Type

The agreement outlining the roles, responsibilities, and payment terms among project participants.

Signup and view all the flashcards

Economic Indicator

A measure of economic growth reflected by construction industry growth.

Signup and view all the flashcards

Cost Overruns

When actual costs exceed previously estimated costs on a construction project.

Signup and view all the flashcards

Time Extensions

Delays that extend the planned duration of a construction project.

Signup and view all the flashcards

Unique Nature of Construction

The unpredictable and one-of-a-kind characteristics of each construction project.

Signup and view all the flashcards

PCM project delivery

An approach emphasizing time efficiency for project owners.

Signup and view all the flashcards

Design/construction interaction

The level of collaboration between design and construction teams.

Signup and view all the flashcards

Competitive bidding contracts

Contracts awarded based on submitted bids, typically for fixed prices.

Signup and view all the flashcards

Lump sum contract

A contract that specifies a fixed total price for the project work.

Signup and view all the flashcards

Contractor payment methods

Ways in which a contractor is compensated for their work.

Signup and view all the flashcards

Risk in lump sum contracts

High financial risk due to changes and contingencies on fixed price contracts.

Signup and view all the flashcards

Milestone payments

Payments made to contractors upon reaching specific project stages.

Signup and view all the flashcards

Negotiated cost-plus contracts

Contracts where contractors are reimbursed for costs plus a fee.

Signup and view all the flashcards

Sliding Fee

A fee that increases linearly with cost savings introduced by the contractor.

Signup and view all the flashcards

Target Cost

A pre-set cost against which contractor performance is measured.

Signup and view all the flashcards

Cost Over Target

When actual costs exceed the target cost set for a project.

Signup and view all the flashcards

Guaranteed Maximum Price (GMP)

A contract where costs are reimbursed up to a maximum price cap.

Signup and view all the flashcards

Agent Relationship

A contractual arrangement where an organization represents the owner.

Signup and view all the flashcards

Non-Agent Relationship

A direct contract to perform a service without representation.

Signup and view all the flashcards

Risk Levels in Contracting

A measure showing the risk exposure of different contract types.

Signup and view all the flashcards

Project Delivery Methods

Various approaches to how construction projects are organized and executed.

Signup and view all the flashcards

Unit Price Contract

Bidders provide rates against estimated quantities, adjusted after construction.

Signup and view all the flashcards

Variations in Work

Changes introduced by the owner in the work defined in tender documents.

Signup and view all the flashcards

Cost + Fixed Percentage

Contract where the contractor is paid a fixed percentage of costs.

Signup and view all the flashcards

Cost + Fixed Fee

The contractor receives a fixed amount regardless of changes.

Signup and view all the flashcards

Cost + Fixed Fee + Profit Sharing

Contractor reimbursed for actual costs plus shares in savings.

Signup and view all the flashcards

Disputes in Contracts

Conflicts arising from changes in work content under unit price contracts.

Signup and view all the flashcards

Expense

The portion of costs incurred at a specific time (0 to 100%).

Signup and view all the flashcards

Cash Flow Calculations

Calculations that track money coming in and going out during a project.

Signup and view all the flashcards

S-Curve

A graphical representation of cumulative expenses over time in project management.

Signup and view all the flashcards

Owner Cumulative Payments

Total payments made to the project owner over time.

Signup and view all the flashcards

Overdraft Calculation

Calculating the negative balance in project finances due to overspending.

Signup and view all the flashcards

Repetitive Projects

Projects involving repetitive tasks like construction of highways or highrises.

Signup and view all the flashcards

Crew Synchronization Calculations

Calculating how to effectively schedule crews to maintain progress and efficiency.

Signup and view all the flashcards

Desired Progress Rate (R)

The rate at which work should progress to meet deadlines in project management.

Signup and view all the flashcards

Bid Unbalancing

Distributing costs unevenly to enhance competitiveness in bidding.

Signup and view all the flashcards

Indirect Costs

Expenses not directly tied to a specific project activity, like overhead.

Signup and view all the flashcards

Owner Retainage

Percentage of payment withheld by the owner until project completion.

Signup and view all the flashcards

Payment Schedule

Agreed timeline for payments between contractor and owner.

Signup and view all the flashcards

Markup Percentage

Extra charge added to the cost to ensure profit margin.

Signup and view all the flashcards

Overdraft Costs

Costs incurred when expenses exceed available funds.

Signup and view all the flashcards

Immediate Expenses

Costs that are charged as soon as they're incurred.

Signup and view all the flashcards

Bid Price Calculation

A summation of costs and markups to establish a bid price.

Signup and view all the flashcards

Study Notes

Introduction to Construction Projects

  • A construction project is a planned undertaking to build a facility or group of facilities.
  • Key participants include the owner, architect/engineer, consultant, general contractor, and subcontractors.
  • A successful project depends on understanding the project environment, roles, and responsibilities of all participants.
  • Various project delivery approaches and contract types are suitable for different project contexts.

Construction Industry History

  • Humans have built large structures throughout history, showcasing the ability to create and design for various purposes.
  • Twentieth and twenty-first centuries saw rapid advancements in technology and materials.
  • Large-scale constructions have significantly impacted human development.

Need for Management in Construction

  • The construction industry is the largest industry globally.
  • It's a service, not a manufacturing industry, as growth represents economic strength.
  • Disruptions in projects, e.g., cost overruns, time extensions, and conflicts among parties are widespread issues.
  • These problems stem from:
    • The unique uncertainty of construction projects.
    • The fragmented and competitive nature of the industry.
    • Growing challenges faced by the industry as a whole.
  • Efficient project management is crucial for success.
    • Handling complexities in modern projects
    • Efficient use of resources (Manpower, Materials, Machinery, and Money)
    • Meeting project deadlines
    • Avoiding conflicts between project participants
    • Improving construction quality and safety
    • Achieving higher productivity
    • Documenting past experience to improve future projects

Construction Project Participants

  • Owner/Client: The individual or organization funding and owning the project. Could be public or private.
  • Architect/Engineer: Designs the building's/facilities' appearance. Often consults engineers for structural, electrical & related designs.
  • Architect/Engineer (A/E): A firm with architects and/or engineers capable of doing complete project design
  • Construction Manager: Manages the overall construction process, from administration to material & method selection.
  • General Contractor (GC/Prime Contractor): Contracts with the owner to oversee construction of the entire project or a major part of it.
  • Subcontractors: Businesses contracting with the GC for specific tasks or materials in the project.
  • Project Manager: A person who coordinates all project facets, including planning, design, procurement, and construction.

Types of Construction

  • Residential construction
  • Non-residential building construction
  • Non-building construction

Life Cycle Stages of Projects

  • Concept Stage: Identifying needs and assessing various project alternatives. May take months to years, depending on factors like environmental assessments.
  • Design Stage: Working out detailed designs, specifications, service preparation, tender documents, and contracts.
  • Construction Stage: Actual construction, coordination, administration by the general contractor and supervising consultants. Commissioning and owner acceptance.
  • Operation & Maintenance (O & M): Activities after project completion, including operation and maintenance.

Project Contract Strategy

  • The contract strategy best fits the project needs when project managers are selected early on.
  • Choosing the right organizational and contractual policies for smooth project execution is key.
  • Key decisions include: setting project objectives, selecting a project delivery method, designing construction interactions, choosing a contract form, and administration practices.

Project Delivery Methods

  • Traditional Approach: Design first, then construction. Typically involves different firms for design and construction.
  • Design-Build: One firm takes responsibility for both design and construction.
  • Turnkey: A party contracts to fully design, build, and finance a project, transferring it to the owner afterward.
  • Professional Construction Management (PCM): The owner hires a PCM company to coordinate all stages, from design to final payment to contractors.

Construction Contract Forms / Types

  • Competitive Bidding Contracts: Two main types: Lump Sum and Unit Price.
  • Negotiated Cost-Plus Contracts: Deals where the owner shares project risk by reimbursing the contractor for actual costs + fee. Includes Cost + Fixed Percentage, Cost + Fixed Fee, Cost + Fee + Profit Sharing, and Cost + Sliding Fee.

Project Administration Practices: Contractual Relationships

  • Agent Relationship (A): Contract where a party (e.g., architect or engineer) acts on behalf of the owner.
  • Non-agent Relationship ($): Direct contract between the owner and the contractor to perform specified services.

Project Planning & Cost Estimation

  • Work Breakdown Structure (WBS): A deliverable-oriented breakdown of the project into manageable components.
  • Activity Relationships and Network Diagram: Establishing relationships between different projects so activities can happen in parallel, and identifying critical activities affecting scheduling.
  • Total Float Calculation and Identifying Critical Activities: Determining float and critical path to schedule to meet completion date.
  • Resource Histogram: A graphical representation of resources used along the project schedule.

Project Financing and Schedule Integration

  • Project Cash Flow: Difference between project income and expenses; graphical representations of expenses over time (S-curve) show how income and expense profiles vary based on payment cycles and project stages.
  • Time Period(s): Time units where income and expense changes are identified to help understand and account for project revenue and expenditures.
  • Cost estimation, Expenses, and Bid Prices: An understanding of costs and prices of each item in the project is imperative in creating an informative budget.
  • Project Financing Options: Methods for funding construction projects; include subcontractors credit, owner mobilization payments, front-end financing (bid unbalancing)

Earthmoving Operations, Materials, and Soil Characteristics

  • Earthmoving process: Movement and processing (excavating, loading, hauling, placing) soil/rock.
  • Equipment selection: Choosing the right equipment affects efficiency and profitability.
  • Production of earthmoving equipment: Calculating production based on output per cycle and cycles per hour, including efficiency factors.
  • Soil conditions: Factors such as trafficability, load ability, moisture content, and swell/shrinkage influence construction planning.
  • Soil classification: Categorizing soils. Systems like Unified and AASHTO help in planning and design.
  • Conversion of soil quantities: Conversion factors needed for conversions to different soil types (loose, compacted, bank).

Load Factors, Equipment, and Production

  • Load/Shrinkage Factors: Using factors to convert between different volume measurements of earth materials (loose, compacted, bank).
  • Excavating Equipment: Different types, including hydraulic excavators, draglines, and clamshells.
  • Production estimating: Methods for calculating the production rate per hour of each type of equipment.

Trenching and Trenchless Technology

  • Methods for digging trenches. Special trenching machines and plows are also in use.
  • Trenchless technology (also called trenchless excavation) also used.
  • Methods for installing utility lines below the ground as well.

Project Control (Earned Value)

  • Earned Value Analysis (EVA): Monitoring project status by comparing planned work against actual work performed and cost.
  • Key components for EVA include On-Progress, Work Scheduled, Work Completed, Actual cost.

Loaders, Trucks and Wagons, and Dozers

  • Loaders: Wheel and track loaders; loading material from excavation sites or hoppers.
  • Trucks and Wagons: Transportation of loads, calculation of required time, and number of vehicles.
  • Dozers: Tractor with a blade; used in site work, excavation, and earthmoving.
  • Cycle time, Load time: The various steps in these operations that need to be accounted for in overall estimating and scheduling.
  • Performance Curves: Used for loaders, trucks, and dozers to calculate maximum speed, given the required pull/resistance.

Specifications

  • Description of work: Clear, concise, and brief description of project requirements.
  • Types of specifications: Manufacturer's, standard, and contract specifications.
  • Materials & Measurements: Description, physical/chemical properties, workmanship.
  • Guidelines for Writing Specifications: Structure and content tips for writing good specifications; factors to avoid.

Quantity Surveying

  • Purpose of quantity Surveying: To assist in client budget, tendering, and measurement of accomplished work.
  • Steps of Quantity Surveying: Taking off, squaring, abstracting, writing the bill of quantities.
  • Principles of Measurement: Procedures for measuring quantities; considerations for each project item.
  • Take-Off Sheets: Format for recording work measurements.

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

Related Documents

More Like This

Use Quizgecko on...
Browser
Browser