What is the term used to describe the bar chart in project management?

  • PERT chart
  • CPM diagram
  • Gantt chart (correct)
  • Precedence diagram
  • Who plays a key role in assisting the Project Engineer with field operations?

  • Contractor’s engineer
  • Project inspector
  • Resident engineer (correct)
  • Materials engineer
  • What should be the retention rate for progress payments if the work is on schedule and 50% complete?

  • 5 % (correct)
  • 10%
  • 20%
  • 15%
  • Which type of activity in a PERT/CPM diagram is primarily affected by delays that are beyond the contractor's control?

    <p>Critical activities</p> Signup and view all the answers

    Which of the following options is not classified as a Variation Order?

    <p>Resume order</p> Signup and view all the answers

    What is the maximum allowable percentage for a change order in a variation order?

    <p>15%</p> Signup and view all the answers

    Which individual’s engineering judgment is pivotal in implementing the overall field project?

    <p>Project engineer</p> Signup and view all the answers

    What is the standard reference point for elevation in all infrastructure projects?

    <p>Mean sea level</p> Signup and view all the answers

    Which of the following is not used to allow movement in structural designs?

    <p>Risers</p> Signup and view all the answers

    What is the maximum value of impact applied to the superstructure of a bridge?

    <p>50/(L+125)</p> Signup and view all the answers

    Which of the following is not classified as a gravity load?

    <p>Wind load</p> Signup and view all the answers

    Which analytical method is not used to analyze lateral forces on building frames?

    <p>Stability Method</p> Signup and view all the answers

    If a project is started more than 8 months after bidding, the contractor is entitled to claim for which of the following?

    <p>Price adjustment</p> Signup and view all the answers

    Before issuing a certificate of final inspection for a completed project, which action must be conducted in the field?

    <p>Exit conference</p> Signup and view all the answers

    In an inspection report, which item is most crucial to include aside from findings?

    <p>Recommendations of possible actions</p> Signup and view all the answers

    Which data is not typically included in a logbook?

    <p>Personal reflections of the site manager</p> Signup and view all the answers

    What type of Atterberg Limit Test can be performed on non-plastic soil?

    <p>Shrinkage limit</p> Signup and view all the answers

    Which method is used for measuring concrete materials for concrete structures?

    <p>Volume</p> Signup and view all the answers

    If good soil is located 2 to 3 m below the river bed, what foundation type is likely required?

    <p>Pile foundations</p> Signup and view all the answers

    For a required thickness of 300 mm for item 200, how many layers may the material be spread and compacted in?

    <p>One</p> Signup and view all the answers

    What is the name of the record that contains data and history regarding a project's implementation?

    <p>Log book</p> Signup and view all the answers

    In riprapping and concrete slope protection, what serves as a water outlet and pressure reliever?

    <p>Weep hole</p> Signup and view all the answers

    What is the term used for strengthening an existing pavement by adding more thickness?

    <p>Overlaying</p> Signup and view all the answers

    What construction material measurement is not typically used for concrete structures?

    <p>Quantity</p> Signup and view all the answers

    What is the recommended asphalt content percentage range for a bituminous mix based on total dry aggregate?

    <p>4% to 8%</p> Signup and view all the answers

    Which material is not suitable for protecting Portland cement concrete pavement from rain before hardening?

    <p>Plastic water stops</p> Signup and view all the answers

    What is the minimum flexural strength requirement for Portland Cement Concrete Pavement?

    <p>3000 psi</p> Signup and view all the answers

    Identify the correct item number for Portland Cement Concrete Pavement in the DPWH Standard Specifications.

    <p>311</p> Signup and view all the answers

    Which of the following tests is not used to determine soil classification?

    <p>Compaction test</p> Signup and view all the answers

    What should be recommended to address reflection cracking in an asphalt overlay after three weeks?

    <p>Apply seal coat</p> Signup and view all the answers

    In choosing a project location for asphalt pavement, which criterion is inappropriate?

    <p>Area is located in a flood-prone road section</p> Signup and view all the answers

    What action should be recommended if the grading test results are unsatisfactory according to item 201 requirements?

    <p>Adjust the stockpile materials</p> Signup and view all the answers

    What is the required paste consistency when the rod settles below the original surface in 30 seconds?

    <p>10 +/- 1 mm</p> Signup and view all the answers

    What is the range of curing temperature for a concrete sample?

    <p>18-24 °C</p> Signup and view all the answers

    What is the maximum wash loss of fine aggregates in the no. 200 sieve?

    <p>3 %</p> Signup and view all the answers

    Up to how many hours can a retarder delay the setting time of concrete?

    <p>4 hours</p> Signup and view all the answers

    By what percentage can a super plasticizer enhance the strength of concrete?

    <p>40-60 %</p> Signup and view all the answers

    What term describes the moisture content in air-dried soil?

    <p>Natural Moisture Content</p> Signup and view all the answers

    What is the tolerance of the mix in a bituminous temperature?

    <p>+/- 15 °C</p> Signup and view all the answers

    What strength is required when using a cylinder mold in the absence of a beam mold?

    <p>3500 psi</p> Signup and view all the answers

    Study Notes

    Construction Management and Engineering Concepts

    • Non-availability of construction materials can hinder project timelines.
    • Rainy months may be predetermined in specific areas, impacting construction schedules.

    Project Management Tools

    • Bar charts are often known as Gantt charts, useful for project scheduling.

    Project Supervision

    • The Project engineer oversees the project, supported by the resident engineer during field operations.

    Financial Management in Projects

    • Retention rate for progress payments should be 5% if work is 50% complete and satisfactory.
    • A time extension due to delays beyond contractor control is granted if the works are identified as critical activities.

    Variation Orders

    • A variation order does not include resume orders; it can be in the form of change orders or extra work orders, with a maximum allowable percentage for change orders at 10%.

    Engineering Judgment and Project Implementation

    • The resident engineer's judgment prevails in field implementation decisions.

    Vertical Datum

    • Mean sea level is the single vertical datum used for infrastructure projects' elevation references.

    Supervision and Standards

    • Project inspectors supervise work and tests during project implementation, ensuring compliance with standards.
    • Minimum field density for embankment materials is set at 95%.

    Soil and Material Testing

    • Non-plastic soil (item 200) allows for the liquid limit and plastic limit tests.
    • Measurement of concrete materials for structures is based on weight.

    Foundation Types

    • When suitable soil is found within 2-3 m below riverbed, spread or raft foundations may be used.

    Project Documentation

    • A logbook compiles project data from start to completion, documenting activities, materials used, and weather conditions.

    Hydraulic Structures

    • In riprapping, weep holes provide water outlet and relieve lateral pressure on structures.

    Pavement Rehabilitation

    • Overlaying strengthens existing asphalt or concrete pavement by adding adequate thickness.

    Load and Design Analysis

    • The maximum impact applied to bridge superstructures is calculated using the formula: 15.24/(L+38).

    Construction Elements

    • Gravity loads include permanent components, but wind load is not classified under this category.

    Lateral Force Analysis

    • Lateral forces in building frames can be analyzed using the Moment-Distribution Method, Portal Method, Factor Method, or Cantilever Method.

    Project Delays

    • Contractors may claim for price adjustments if projects start over 8 months after bidding.

    Final Inspections

    • Exit conferences are conducted before issuing the final inspection certificate for completed projects.

    Inspection Reports

    • Recommendations for action by inspectors are crucial items in inspection reports.

    Curing and Strength of Concrete

    • Recommended curing temperature for concrete is between 15-18°C with a minimum flexural strength requirement of 3500 psi for Portland Cement Concrete Pavement.

    Soil Classification and Testing

    • Soil classification can be determined through Atterberg limits and sieve analysis tests.

    Asphalt Pavement Criteria

    • For asphalt pavement projects, ensure drainage facilities are maintained, and avoid flood-prone areas.

    Sampling and Testing

    • Core sample measurement for asphalt pavement should take at least 3 readings for thickness determination.

    Temperature Tolerances

    • The required mix tolerance for bituminous temperature is +/- 10°C.

    Quality Control

    • Prime coat application requires a minimum undisturbed period of 24 hours for proper bonding.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    This quiz covers essential concepts in construction management and engineering, including project timelines, supervision, financial management, and variation orders. It will help you understand the key tools and practices involved in successful project execution.

    More Like This

    Use Quizgecko on...
    Browser
    Browser