What is the person-days ratio for the overall multi-trade prefabrication compared to the South Korean Government Labor Input Standard?
What is the person-days ratio for the overall multi-trade prefabrication compared to the South Korean Government Labor Input Standard?
- 114.3
- 113.5 (correct)
- 100
- 129.7
Which BIM tool is NOT listed under BIM Modeling?
Which BIM tool is NOT listed under BIM Modeling?
- AutoCAD MEP
- Revit Architect
- Navisworks (correct)
- Tekla Structures
Which floor of the building has the lowest person-days input compared to the South Korean Government Standard?
Which floor of the building has the lowest person-days input compared to the South Korean Government Standard?
- Eighth Floor (correct)
- Seventh Floor
- Fifth Floor
- Sixth Floor
What BIM tool is used for 4D simulation?
What BIM tool is used for 4D simulation?
What is the person-days input for the Sixth Floor according to the South Korean Government Standard?
What is the person-days input for the Sixth Floor according to the South Korean Government Standard?
What is the primary focus of Tier 1 meetings?
What is the primary focus of Tier 1 meetings?
Who is NOT typically represented in a Tier 1 meeting?
Who is NOT typically represented in a Tier 1 meeting?
What classification do design errors requiring significant changes and cost impact fall under?
What classification do design errors requiring significant changes and cost impact fall under?
Which level of development is the BIM model used in Tier 1 meetings generally categorized under?
Which level of development is the BIM model used in Tier 1 meetings generally categorized under?
Which materials were excluded from the scope of the BIM model for Tier 1 meetings?
Which materials were excluded from the scope of the BIM model for Tier 1 meetings?
What was the primary issue faced by the trade manager for the installation of exterior panels?
What was the primary issue faced by the trade manager for the installation of exterior panels?
Which method could have identified the critical panel installation issues?
Which method could have identified the critical panel installation issues?
What could have been revised after identifying the installation issues?
What could have been revised after identifying the installation issues?
What does the combination of the BIM model and point cloud data primarily aim to achieve?
What does the combination of the BIM model and point cloud data primarily aim to achieve?
What type of analysis was mentioned in the context of the Trimble Realworks?
What type of analysis was mentioned in the context of the Trimble Realworks?
What is a possible consequence of exceeding 70% deflection monitoring thresholds?
What is a possible consequence of exceeding 70% deflection monitoring thresholds?
Who was responsible for resolving the issues related to panel installation?
Who was responsible for resolving the issues related to panel installation?
Which scanning technology was referenced for data collection?
Which scanning technology was referenced for data collection?
What is a major factor that determines the success of a project using BIM?
What is a major factor that determines the success of a project using BIM?
What is one of the lessons learned from the Hyundai Motorstudio Goyang project regarding meetings?
What is one of the lessons learned from the Hyundai Motorstudio Goyang project regarding meetings?
Which method was used in the Hyundai project to handle the design and construction of irregular façades?
Which method was used in the Hyundai project to handle the design and construction of irregular façades?
What does the phrase 'too many cooks spoil the broth' imply in the context of BIM coordination?
What does the phrase 'too many cooks spoil the broth' imply in the context of BIM coordination?
What challenge is mentioned regarding the relationship between efficiency and cost in the project?
What challenge is mentioned regarding the relationship between efficiency and cost in the project?
What is a key requirement for all participants involved in a BIM project?
What is a key requirement for all participants involved in a BIM project?
Why is BIM considered a relatively new working technique?
Why is BIM considered a relatively new working technique?
Which of the following best summarizes the overall strategy of the Hyundai Motorstudio Goyang project?
Which of the following best summarizes the overall strategy of the Hyundai Motorstudio Goyang project?
What was a significant award won by the Fondation Louis Vuitton in 2012?
What was a significant award won by the Fondation Louis Vuitton in 2012?
Who is the architect behind the design of the Fondation Louis Vuitton?
Who is the architect behind the design of the Fondation Louis Vuitton?
What unique architectural feature is highlighted in the design of the Fondation Louis Vuitton?
What unique architectural feature is highlighted in the design of the Fondation Louis Vuitton?
Where is the Fondation Louis Vuitton located?
Where is the Fondation Louis Vuitton located?
What is primarily hosted by the Fondation Louis Vuitton?
What is primarily hosted by the Fondation Louis Vuitton?
Study Notes
Tier 1 and Tier 2 Meetings
- Tier 1 meetings include clients, designers, general contractors, and major subcontractors (steel, concrete, MEP).
- Tier 2 meetings involve general contractors and specific subcontractors (glazing, façade, door, catwalk).
- Focus of Tier 1 meetings is on constructability, major design errors, and design development direction, not minor errors or clash eliminations.
- Input from both general contractor and designer is essential for resolving constructability issues.
- Major design errors lead to architectural design changes and significant cost effects.
- Agreement on the direction for detailed shop drawing development is established in Tier 1 meetings.
- A BIM model (Level of Development 250-350) was developed by ArchiMac for coordination, excluding miscellaneous materials for efficiency.
- Minor clashes are handled by trade managers per their construction plans.
Analysis and Evaluation
- 3D laser scanning aids in identifying installation issues, helping revise design as needed.
- A combined analysis process includes BIM models and point cloud data for accurate displacement monitoring.
Labor Input Comparison
- South Korean Government Standard requires 114.3 person-days for reference.
- Multi-trade prefabrication shows an increase to 129.7 person-days, with variations for different building floors.
BIM Usage and Tools
- Common BIM tools include CATIA, Tekla Structures, Revit Architect, and AutoCAD MEP.
- Navisworks is used for integrated file management and 4D simulation.
- Laser scanning data is managed using Realworks and Autodesk Recap.
Lessons Learned from the Hyundai Motorstudio Goyang Project
- Effective BIM implementation depends on active engagement from all participants and proper access to necessary data.
- Meeting efficiencies can be improved by categorizing agendas and only inviting relevant parties.
- Parametric modeling techniques enhance the generation of design details for irregular façades, although cost efficiency may vary.
Fondation Louis Vuitton Overview
- Designed by Frank Gehry, opened in October 2014, serving as an exhibition space for art collections and performances.
- Recognized with the 2012 BIM Excellence Award by the American Institute of Architects.
- Located in Jardin d’Acclimatation, it integrates an organic architectural style with innovative use of materials and construction techniques.
- Frank Gehry's fluid design establishes a visual connection with the natural surroundings and Paris.
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.
Related Documents
Description
This quiz covers the structure and purpose of Tier 1 and Tier 2 meetings in construction projects. It focuses on the attendees of each meeting type and their specific roles, emphasizing the importance of constructability and design error discussions. Gain insights into efficient project management and collaboration among professionals.