Concrete Specifications and Cover Standards

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the maximum allowable temperature for concrete during delivery and placement?

  • 28°C
  • 25°C
  • 32°C (correct)
  • 20°C

At what temperature should concrete specimens be kept during final curing?

  • 23°C±2°C (correct)
  • 25°C±2°C
  • 30°C±2°C
  • 20°C±2°C

How often should the compression testing machine be calibrated?

  • 6 months
  • 1 month
  • 12 months (correct)
  • 3 months

What percentage of surface area damage on a coated steel reinforcing bar indicates that it should be rejected?

<p>2% (A)</p> Signup and view all the answers

What is the minimum clear distance from anchor bolts or sleeves to the edge of concrete?

<p>100mm (C)</p> Signup and view all the answers

What is the maximum distance permitted between manholes for public sewers?

<p>75 meters (D)</p> Signup and view all the answers

What is the minimum distance that public sewers must be separated from potable water lines?

<p>2 meters (B)</p> Signup and view all the answers

What is the minimum pressure rating of valves as specified?

<p>12.1 bar (A)</p> Signup and view all the answers

What is the minimum inside diameter for storm drain manholes with pipe diameters up to 600 mm?

<p>900 mm (C)</p> Signup and view all the answers

What is the minimum thickness of sand cover installed on top of direct buried cable or conduit?

<p>300 mm (C)</p> Signup and view all the answers

What percentage of silica fume is required as a replacement by weight of cement?

<p>7% (B)</p> Signup and view all the answers

What is the minimum size for high strength bolts in bolted connections?

<p>20 mm (C)</p> Signup and view all the answers

What is the minimum thickness of grout between the foundation and base plates?

<p>25 mm (D)</p> Signup and view all the answers

What is the minimum thickness of a gusset and stiffener plate required?

<p>10mm (C)</p> Signup and view all the answers

How many days should a masonry wall be cured before grout pouring in high lift grouted construction?

<p>7 days (D)</p> Signup and view all the answers

What is the minimum compressive strength of structural concrete at 28 days?

<p>4000psi (B)</p> Signup and view all the answers

What is the maximum height that concrete may be allowed to drop freely?

<p>1m (A)</p> Signup and view all the answers

What is the required relative density for free-draining soils to be compacted?

<p>70% (D)</p> Signup and view all the answers

What is the minimum thickness of paving slabs subject to vehicular traffic?

<p>150mm (C)</p> Signup and view all the answers

Which material is classified as brittle?

<p>Concrete (A)</p> Signup and view all the answers

How much natural pozzolan is used in cement?

<p>20% (A)</p> Signup and view all the answers

The prime coat should be applied when the atmospheric temperature is what or above?

<p>16°C (A)</p> Signup and view all the answers

At what rate should the prime coat be applied using a pressure distributor?

<p>0.65 to 1.75 litres/m2 (B)</p> Signup and view all the answers

What is the minimum temperature for applying the prime coat for MC-70?

<p>50°C (C)</p> Signup and view all the answers

What is the maximum application rate of the tack coat on paved surfaces?

<p>0.25 liters/m2 (B)</p> Signup and view all the answers

What is the minimum core thickness measurement required?

<p>10mm or 15% (C)</p> Signup and view all the answers

What is the minimum compressive strength of pre-packaged cement based grout at 28 days?

<p>5,000 psi (A)</p> Signup and view all the answers

What is the minimum time for continuous water curing of grout?

<p>7 days (C)</p> Signup and view all the answers

What is the maximum working time allowed after mixing grout at a minimum working temperature of 32°C?

<p>30 minutes (C)</p> Signup and view all the answers

What is the maximum thickness of concrete layers during placement?

<p>4 inches (A)</p> Signup and view all the answers

What is the minimum required curing time for a masonry wall before grouting?

<p>5 days (A)</p> Signup and view all the answers

Which dimension does a gypsum board width typically fall between?

<p>1200mm to 1370mm (A)</p> Signup and view all the answers

What percentage of compaction is required for base and sub-base of asphalt paving?

<p>90% and 95% (A)</p> Signup and view all the answers

What is the minimum clear spacing between parallel bars in a layer?

<p>3 inches (B)</p> Signup and view all the answers

Which sieve size must 100% of selected fill material pass?

<p>No. 4 sieve (A)</p> Signup and view all the answers

How thick must a cohesive cap layer be when using dune sand as fill material?

<p>150mm to 300mm (A)</p> Signup and view all the answers

What is the minimum time that a plastic sheet should remain on a concrete surface to assess moisture content?

<p>24 hours (C)</p> Signup and view all the answers

Flashcards are hidden until you start studying

Study Notes

Concrete Specifications

  • Allowable concrete temperature during delivery and placement should be a maximum of 32°C.
  • Concrete specimens should be subjected to final curing with free water maintained on their surfaces at all times at a temperature of 23°C ± 2°C.
  • The compression testing machine should be calibrated once in 12 months.
  • When the extent of damaged coating exceeds 2% of the surface area of the coated steel reinforcing bar in any 0.3–m (1–ft) length, the coated bar should be rejected.
  • Concrete should be discharged from the mixer within 90 minutes or 300 revolutions of the mixer from the time the mixing water was added.

Concrete Cover and Clear Distances

  • Minimum concrete cover for permanently exposed concrete structures to earth (including foundations over a sub-slab), weather supporting process equipment foundations should be 75mm.
  • Minimum clear distance from anchor bolts or sleeves to the edge of concrete should be 100mm.
  • The minimum anchor bolt diameter should be 20mm unless specified by the vendor for small equipment or for the anchorage of small miscellaneous items, e.g., of base or sub-base.

Prime Coat Specifications

  • Prime coat should only be applied when the surface to be treated is dry and the atmospheric temperature is 16°C or above.
  • Prime coat should be applied uniformly to the surface of the base using a pressure distributor at a rate between 0.65 and 1.75 liters/m2.
  • The prime coat should be applied at a temperature between 50°C and 80°C for MC-70.
  • The prime coat should be applied at a temperature between 65°C and 105°C for MC-250.

Tack Coat Specifications

  • Tack coat should be applied on paved surfaces and vertical surfaces which will be in contact with the asphalt paving by means of a bitumen distributor at a maximum rate of 0.25 liters/m2.
  • Tack coats should not be placed during rain, on a moist surface when the air or surface temperature is below 16°C.
  • If application of the surface course is delayed by more than 3 days or if dirt, sand, or other impurities have contaminated the tack coat, a new tack coat should be applied after the original one has been swept clean.

Core Measurements and General Requirements

  • Measurement of any cores should not be less than 10mm or 15% of the design thickness, whichever is less.
  • Core compaction requirements should be equal to or greater than 96% of Marshall density (ASTM D-2726/ASTM D1559) using samples taken at the road site.
  • Minimum Compressive Strength of pre-packaged cement-based grout at 28 days should be 5,000 psi.
  • Standard temperature of mix should be 23°C ± 2°C when test cubes are cast.
  • The compressive strength of the grout should be a minimum of 3,500 psi at 7 days of age.
  • Grout should be given a continuous water cure (covered by wet burlap and 0.15 mm polyethylene) for a minimum of 7 days.
  • Grout placement should be within 30 minutes at 32°C minimum working time, after mixing.

Public Sewer Specifications

  • The maximum distance between manholes for public sewers should be 15m.
  • Public sewers that are parallel to potable water lines should be separated from such lines by a minimum distance of 2m and shall be located below the potable water lines.

Underground Piping and Drainage

  • Minimum pressure rating of valves should be 12.1 bar.
  • For trenches deeper than 1.5 m, RTR pipe should be assembled in the trench.
  • The minimum diameter of a storm drain pipe (except building connections) or road crossing culvert should be 300 mm.
  • Storm drain manholes should have a minimum inside diameter of 1.0 m for straight run manholes with a pipe diameter size of 600 mm or less.

Cable Trench Specifications

  • A minimum of 150 mm of dry sand should be installed from the bottom of the trench to the bottom of the cable or conduit as a cushion.
  • A minimum of 300 mm of dry sand cover should be installed on top of the cable or conduit as a cushion.

Gypsum Board Specifications

  • Gypsum board width should be 1220 mm to 1370 mm with a tolerance of -2 mm under the specified width.
  • Gypsum board corners should be square with a tolerance of ± 2° over the full width of the board.
  • Wood supports for lath or gypsum board should not be less than 38 mm in least dimension.

Grout and Bolt Specifications

  • The minimum thickness of grout should be 25 mm.
  • The minimum thickness of grout between the foundation and base plates should be 25 mm.
  • Steel shims and packings should be provided.
  • In bolted connections, the minimum size of high-strength bolts that should be used is 20 mm.
  • The minimum thickness of gusset and stiffener plates should be 10 mm.

Moisture Content Determination

  • The minimum time that a plastic sheet should be in place on a concrete surface to determine its moisture content by the plastic sheet method, ASTM D4263, is 16 hours.

Concrete Slab and Masonry Wall Specifications

  • The minimum concrete slab thickness supported on the ground is 100 mm (4").
  • A masonry wall should be cured for 7 days prior to grout pouring for high-lift grouted construction.

Fill Material Specifications

  • The maximum particle size of fill material should be 1/2 lift thick.
  • Fill material classified as "select fill" should contain 0 to 20% particles passing through #200 sieves.
  • Fill materials should be placed in lifts or layers not exceeding 200 mm in loose depth.
  • Free-draining soils or cohesionless material should be compacted to 70% relative density.

Concrete Strength and Paving Slab Specifications

  • The minimum compressive strength of structural concrete at 28 days should be 25 MPa.
  • Paving slabs subject to vehicular traffic should have a minimum thickness of 150 mm.
  • Control or construction joints for concrete paving should be spaced at a maximum of 6.0 meters in both directions.

Concrete Placement and Grout Strength

  • Concrete may be allowed to drop freely at a maximum height of 1 m.
  • Cementations non-shrink grout should have a compressive strength of 5,000 psi.

Miscellaneous Steel Specifications

  • End-lap for metal panels should not be less than 250 mm.
  • A beam with a depth of 8 inches requires 2 rows of bolts.

Brittle Materials

  • A material is brittle if, when subjected to stress, it breaks with little elastic deformation and without significant plastic deformation.
  • Brittle materials absorb relatively little energy prior to fracture, even those of high strength. Breaking is often accompanied by a snapping sound.
  • Examples of brittle materials are: bone, cast iron, ceramic, and concrete.

Concrete Vibrator and Cracking

  • We use vibrators to increase the workability and consolidation of concrete.
  • Concrete cracking can be caused by dehydration and shrinkage.

Pozzolan Use and Concrete Placement

  • Natural pozzolan should be used at 15% of the cement weight.
  • Place concrete in layers not exceeding 150 mm in thickness and consolidate.

Base Class Material and Tack Coat Delay

  • The laboratory California Bearing Ratio (CBR) per ASTM D1883 or AASHTO T-193 for base class material at 100% compaction DD1557 should conform to minimum 80%.
  • Testing should be conducted at a rate of one test every 300 m of base or sub-base.

Gypsum Board Width and Masonry Wall Curing

  • Gypsum board width should be 1220 mm to 1370 mm with a tolerance of -2 mm under the specified width.
  • A masonry wall should be cured for 7 days prior to grout pouring for high-lift grouted construction.

Lightweight Aggregate and Reinforcement

  • Lightweight aggregate should have a dry loose weight of 1600 kg/m3 or less.
  • Reinforcement bars are used to resist shear and torsion stresses in a structural member.
  • The minimum clear spacing between parallel bars in a layer should be the diameter of the larger bar + 25 mm.
  • The minimum bend diameter for No. 16 bar commonly used for stirrups and ties should be 100 mm.

Moisture Content by Plastic Sheet Method

  • The minimum time that a plastic sheet should be in place on a concrete surface to determine its moisture content by the plastic sheet method, ASTM D4263, is 16 hours.

Fill Material Compaction and Sand Cushion

  • Fill material should be compacted to 95% of the maximum laboratory density.
  • Dune sand or clean sand used as fill material requires a cap layer of cohesive material, 150 mm to 300 mm thick.
  • The sand cushion used for underground cable shall be a minimum of 150 mm deep.

ACI and Sieve Requirements

  • The American Concrete Institute (ACI) is a professional organization for concrete professionals.
  • The amount of selected fill material passing #200 sieve should be 100%.

Compaction

  • Compaction should begin only after the fill or backfill has been properly placed and the material to be compacted is at the proper moisture content, 95% to 105% of the optimum moisture content per ASTM D1557 or ASTM D698, whichever is applicable.
  • Fill or backfill placed beneath footings, grade beams, mats, buildings, and process areas should be compacted to at least 95% of the maximum Modified Proctor density as determined by ASTM D1557.

Damaged Coating and Reinforcing

  • When the extent of damaged coating exceeds 2% of the surface area of the coated steel reinforcing bar in any 0.3 m (1 ft) length, the coated bar should be rejected.

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

Related Documents

CBT Notes all Q - Copy PDF

More Like This

Design of Concrete Members For Torsion
10 questions
Concrete Mixture Classes and Requirements
11 questions
Concrete Safety Protocols and Practices
6 questions