Concrete Safety Protocols and Practices
6 Questions
100 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

Which of the following is an accepted method of determining when it is safe to remove concrete formwork?

  • Wait for a specific time duration
  • The concrete's compressive strength has been properly tested (correct)
  • Consult with the construction manager
  • Check the weather conditions
  • Shoring for concrete operations should be:

  • All the above (correct)
  • Installed by experienced personnel
  • Properly inspected
  • Completed within a short time frame
  • Employees should be allowed to ride in a concrete bucket.

    False

    _____ must have pipe supports designed for 100% overload.

    <p>Concrete pumping systems</p> Signup and view all the answers

    A limited access zone for masonry construction should:

    <p>All the above</p> Signup and view all the answers

    Who should be present in a building where a jacking operation is taking place?

    <p>Only employees essential to the jacking operation</p> Signup and view all the answers

    Study Notes

    Concrete Safety Protocols

    • Concrete Formwork Removal: Confirm safety by testing the concrete’s compressive strength before removal.

    Shoring Requirements

    • Shoring for Concrete: Implement all recommended methods for shoring during concrete operations to ensure structural safety.

    Concrete Bucket Safety

    • Employee Safety: Riding in a concrete bucket is strictly prohibited to prevent accidents and injuries.

    Concrete Pumping Systems

    • Support Design: Concrete pumping systems require pipe supports that are engineered for a 100% overload capacity to ensure stability and safety.

    Masonry Construction Zones

    • Limited Access Zone: Establish a limited access zone during masonry construction to restrict entry to essential personnel only.

    Jacking Operations Protocol

    • Presence During Operations: Only allow employees essential to the jacking operation to be present in the building, minimizing risk and exposure to hazards.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    This quiz covers essential safety protocols related to concrete construction, including formwork removal, shoring requirements, and the safe operation of concrete pumping systems. It also addresses the importance of restricted access zones and minimizing personnel presence during jacking operations. Test your knowledge on ensuring safety in concrete practices.