Concrete Curing Temperature Procedures

FlatteringCalcium avatar
FlatteringCalcium
·
·
Download

Start Quiz

Study Flashcards

10 Questions

What should be used to tap molds that are prone to denting or permanent distortion?

An open hand

What is the maximum size of depressions or projections allowed on the finished surface?

3.3 mm

How should the top surfaces of cylinders be finished?

By striking them off with a tamping rod or handheld float or trowel

What is the purpose of capping the top surface of freshly made cylinders?

To permit hardening and curing with the specimen

How should beams be finished after consolidation of the concrete?

By using a handheld float or trowel

Why should the specimens be marked to identify them?

To identify the concrete they represent

What should be avoided when marking the specimens?

Using a method that alters the top surface

What is the purpose of section 9.6 of the standard?

To explain the identification method

What type of material is permitted to be used to cap the top surface of freshly made cylinders?

Stiff portland cement paste

What is the primary goal of the finishing process?

To produce a flat, even surface

This quiz assesses your knowledge of the procedures for creating a satisfactory temperature environment during the initial curing of concrete specimens. Learn about the various methods to control temperature, including ventilation, cooling, and heating devices. Understand the importance of meeting temperature requirements for early-age strength testing.

Make Your Own Quizzes and Flashcards

Convert your notes into interactive study material.

Get started for free

More Quizzes Like This

Concrete Curing and Strength Gain
10 questions
Curing and Finishing Concrete
42 questions
Concrete Finishing and Curing
45 questions
Use Quizgecko on...
Browser
Browser