Concrete Cube Management Quiz
5 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What does IS 1199:1959 cover?

  • Sampling and Analysis of concrete (correct)
  • Strength of Cube relative to strength of Concrete
  • Curing of cube samples
  • Determination of Air content of fresh concrete

Which part of IS 1199:2018 deals with the determination of consistency of fresh concrete?

  • Part 3
  • Part 4
  • Part 2 (correct)
  • Part 1

What does 'PARAKH' stand for in the context of concrete cubes management?

  • Preparation and casting of cubes
  • Pacing to Acquire, Refresh And Knowledge Harvesting (correct)
  • Acceptance criteria of concrete strength results
  • Part 6: Tests

What does IS 1199:2018 Part 5 cover?

<p>Making and curing of test specimens (B)</p> Signup and view all the answers

Which document has been revised to IS 1199:2018?

<p>IS 1199:1959 (C)</p> Signup and view all the answers

More Like This

Design of Concrete Members For Torsion
10 questions
Concrete Masonry Construction
10 questions
Concrete Hollow Blocks Classification
11 questions
Concrete Mixture Classes and Requirements
11 questions
Use Quizgecko on...
Browser
Browser