Changes in Impacted Areas Overview
16 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the sole contact person for any incidental change in Resin lot change/樹脂ロット変更?

  • P.White mark
  • P.Dryness of cylinder
  • Nissha Japan(Kameoka)
  • None of the above (correct)
  • What is the sole person responsible for investigating and approving any change related to Process Window change or adjustment?

  • Pathmanathan (Factory Manager)
  • Asri (IMD senior executive) (correct)
  • Faiskandar (QA Engineer)
  • All of the above
  • Which of the following are considered normal and expected maintenance activities?

  • Maintenance/メンテナンス (correct)
  • Idle condition never touch anything/リスタート
  • Mold correction/金型修理
  • Spare parts replacement/スペアーパーツの交換 (correct)
  • Which of the following areas are NOT inspected for visual inspection and product dimensions?

    <p>None of the above (D)</p> Signup and view all the answers

    In the event of a "Mold breakdown/金型故障", which person should be contacted?

    <p>None of the above (D)</p> Signup and view all the answers

    If there is a new employee who needs training, what category does this fall under?

    <p>Personnel transfers involving training (Newcomers etc.)/教育を伴う人員異動 (B)</p> Signup and view all the answers

    What is the sole contact for "Inproved cylinder/改版"?

    <p>Faiskandar (QA Engineer) (C)</p> Signup and view all the answers

    What is the sole contact for "Setup change/段取り替え"?

    <p>Pathmanathan (Factory Manager) (A)</p> Signup and view all the answers

    Which inspection method is used for measuring product dimensions and ensuring quality control?

    <p>Visual inspection (B)</p> Signup and view all the answers

    What specific feature is often examined during the production sampling inspection for control points?

    <p>Boss pin height (B)</p> Signup and view all the answers

    Which of the following aspects is NOT typically involved in the production sampling inspection process?

    <p>Thermal expansion testing (C)</p> Signup and view all the answers

    In what scenario would visual inspection alone be insufficient for quality control?

    <p>When process validation is needed (B)</p> Signup and view all the answers

    Which phase primarily focuses on overall measurement during the production process?

    <p>Production sampling inspection (C)</p> Signup and view all the answers

    What is the main objective of measuring control points in production sampling inspection?

    <p>To verify product quality (D)</p> Signup and view all the answers

    Which activity is essential for maintaining the integrity of the production process?

    <p>Continuous visual inspections (D)</p> Signup and view all the answers

    Which inspection could potentially include both visual inspection and measurements of the boss pin height?

    <p>Production sampling inspection (A)</p> Signup and view all the answers

    Study Notes

    Impacted Areas and Changes

    • List of areas impacted by incidental or intentional changes
    • Includes details like specific content changes, contacts, and verification steps
    • Check quantity, overall measurements, and visual inspections are required
    • Measurements of replacement parts, samples for comparison, and specific issues (e.g., white marks, dryness, uneven coloration)
    • Process changes are documented: resin/foil lot changes, mold issues (touch, maintenance, breakdown, polishing, correction, cavity replacements, grain inserts), setup change
    • Personnel transfers (with or without training). Staff training is noted
    • Measuring equipment repair and updates noted
    • Production sampling inspections, overall measurements, process window suitability validations, and overall inspections needed.
    • Construction/repair without permission is prohibited

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Related Documents

    Incident Change List 11 PDF

    Description

    This quiz focuses on the areas affected by incidental or intentional changes in processes. It covers topics such as content modifications, measurement requirements, and documentation of personnel transfers and equipment updates. Key inspection steps and the prohibition of unauthorized construction or repairs are also included.

    More Like This

    Process Changes: Analysis and Context
    5 questions
    Manufacturing Process Changes Quiz
    10 questions
    Mold Maintenance and Process Changes
    16 questions
    Manufacturing Process Changes and Inspections
    16 questions
    Use Quizgecko on...
    Browser
    Browser