Podcast
Questions and Answers
On roofs greater than 6 feet above a lower level, the use of guardrails, safety nets or personal fall arrest systems are required.
On roofs greater than 6 feet above a lower level, the use of guardrails, safety nets or personal fall arrest systems are required.
True
What should the proper nail length be when installing shingles?
What should the proper nail length be when installing shingles?
Long enough to penetrate the roofing and then go 3/4" into the decking or through the thickness of the decking, whichever is less.
The term 'storm nailing' refers to the use of six nails per shingle and CertainTeed does not require storm nailing for upgraded wind warranty coverage.
The term 'storm nailing' refers to the use of six nails per shingle and CertainTeed does not require storm nailing for upgraded wind warranty coverage.
True
CertainTeed High-Performance starter shingles can be used when installing Highland Slate.
CertainTeed High-Performance starter shingles can be used when installing Highland Slate.
Signup and view all the answers
For a Six Up, Six Off application, you should cut 6" off the left end of a full shingle to start the second course.
For a Six Up, Six Off application, you should cut 6" off the left end of a full shingle to start the second course.
Signup and view all the answers
The starting row of the base sheet should be cut into ____ for a 2-ply SA roof membrane system and ____ for a 3-ply roof membrane system.
The starting row of the base sheet should be cut into ____ for a 2-ply SA roof membrane system and ____ for a 3-ply roof membrane system.
Signup and view all the answers
CertainTeed does not require that all date-codes match on all bundles applied to the same plane.
CertainTeed does not require that all date-codes match on all bundles applied to the same plane.
Signup and view all the answers
Joint overlaps for DiamondDeck and RoofRunner are different than felt and vary by roof slope.
Joint overlaps for DiamondDeck and RoofRunner are different than felt and vary by roof slope.
Signup and view all the answers
Open valleys are recommended when installing certain roofing products.
Open valleys are recommended when installing certain roofing products.
Signup and view all the answers
Ladders should extend above the eaves by 3 to 3 ½ feet.
Ladders should extend above the eaves by 3 to 3 ½ feet.
Signup and view all the answers
Underwriters Laboratories certifies CertainTeed fiberglass shingles to meet ASTM D3462.
Underwriters Laboratories certifies CertainTeed fiberglass shingles to meet ASTM D3462.
Signup and view all the answers
The 4 1/2" Vertical Racking Method is the only approved method for Belmont shingles.
The 4 1/2" Vertical Racking Method is the only approved method for Belmont shingles.
Signup and view all the answers
The 4 1/2" Vertical Racking Method is the only approved method for Grand Manor and Carriage House shingles.
The 4 1/2" Vertical Racking Method is the only approved method for Grand Manor and Carriage House shingles.
Signup and view all the answers
CertainTeed allows the application of a nailable deck over an unacceptable deck.
CertainTeed allows the application of a nailable deck over an unacceptable deck.
Signup and view all the answers
Cap flashing, continuous counter flashing, and surface-mounted counter flashing are three flashing methods used on chimneys.
Cap flashing, continuous counter flashing, and surface-mounted counter flashing are three flashing methods used on chimneys.
Signup and view all the answers
When eave vents are installed, ensure at least 1" space between the insulation and the roof sheathing.
When eave vents are installed, ensure at least 1" space between the insulation and the roof sheathing.
Signup and view all the answers
What must the base flashing used against a vertical front wall do? (Select all that apply)
What must the base flashing used against a vertical front wall do? (Select all that apply)
Signup and view all the answers
Never mix two types of exhaust vents.
Never mix two types of exhaust vents.
Signup and view all the answers
At the eaves, if there's a chance of snow or ice build-up in the gutters, it is advisable to install WinterGuard under the drip edge.
At the eaves, if there's a chance of snow or ice build-up in the gutters, it is advisable to install WinterGuard under the drip edge.
Signup and view all the answers
Failure to follow steep slope fastening instructions can void the warranty in the event of a shingle delamination.
Failure to follow steep slope fastening instructions can void the warranty in the event of a shingle delamination.
Signup and view all the answers
High-performance starter is used with both Grand Manor and Carriage House.
High-performance starter is used with both Grand Manor and Carriage House.
Signup and view all the answers
The minimum net free ventilation area shall be 1/300 of the vented space provided certain conditions are met.
The minimum net free ventilation area shall be 1/300 of the vented space provided certain conditions are met.
Signup and view all the answers
The 2018 IRC specifies that step flashing should be at least 4" high by 4" wide.
The 2018 IRC specifies that step flashing should be at least 4" high by 4" wide.
Signup and view all the answers
The 2018 IRC specifies that drip edge must be installed at the roof eaves and rake edges.
The 2018 IRC specifies that drip edge must be installed at the roof eaves and rake edges.
Signup and view all the answers
Proper T-Seam corner cuts should be _____ from the end of the roll with a _____ width into the sidelap.
Proper T-Seam corner cuts should be _____ from the end of the roll with a _____ width into the sidelap.
Signup and view all the answers
Two layers of felt is not an alternative to WinterGuard when installing Landmark TL on a low slope.
Two layers of felt is not an alternative to WinterGuard when installing Landmark TL on a low slope.
Signup and view all the answers
When applying waterproofing underlayment on a hip roof, apply it along the eaves first, then cover the hips.
When applying waterproofing underlayment on a hip roof, apply it along the eaves first, then cover the hips.
Signup and view all the answers
NorthGate Climate Flex meets UL2218 Class 4 impact resistance ratings because it is SBS modified.
NorthGate Climate Flex meets UL2218 Class 4 impact resistance ratings because it is SBS modified.
Signup and view all the answers
Study Notes
Safety Requirements
- Guardrails, safety nets, or personal fall arrest systems required on roofs over 6 feet high.
Roofing Nailing
- Nail length varies by shingle type; must penetrate roofing and extend 3/4" into decking or through it, whichever is less.
- "Storm nailing" involves using six nails per shingle; not required by CertainTeed for upgraded wind warranty coverage.
Starter Shingles and Installation
- CertainTeed High-Performance starter shingles are compatible with Highland Slate.
- For a Six Up, Six Off application, cut 6" from the left end of a full shingle to start the second course.
Base Sheet and Decking
- A 2-ply SA roof membrane system requires a 1/2 roll cut; a 3-ply system requires a 2/3 roll cut.
- CertainTeed does not mandate matching date-codes on bundles applied to the same plane.
Joint Overlaps and Valley Installation
- The joint overlaps for DiamondDeck and RoofRunner differ from felt and are dependent on roof slope.
- Open valleys are recommended for specific products.
Ladder Safety
- Ladders should extend 3 to 3 ½ feet above the eaves for safety.
Certification and Methodology
- CertainTeed fiberglass shingles certified by Underwriters Laboratories per ASTM D3462.
- The 4 1/2" Vertical Racking Method is the sole approved method for Belmont, Grand Manor, and Carriage House shingles.
Decking and Flashing
- Application of a nailable deck over an unacceptable deck is permissible by CertainTeed.
- Cap flashing, continuous counter flashing, and surface mounted counter flashing are standard methods for chimneys.
Ventilation and Insulation
- Ensure a 1" gap between insulation and roof sheathing when installing eave vents.
- Minimum net free ventilation area must be 1/300 of vented space under specified conditions.
Installation Standards
- The 2018 IRC mandates that step flashing must be at least 4" in height and width.
- Drip edge installation is required at roof eaves and rake edges.
Waterproofing and Underlayment
- Proper T-Seam corner cuts should be made at 5 ½" from the roll end with a 3" width into the sidelap.
- Two layers of felt cannot substitute for WinterGuard on low slope installations.
Product Features
- NorthGate Climate Flex achieves UL2218 Class 4 impact resistance due to being SBS modified.
- "Six-nailing" on Landmark Shingles requires nails to be evenly spaced.
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.
Description
Test your knowledge with these flashcards about CertainTeed Shingle Master guidelines. Each card covers essential safety measures, nail lengths, and installation terms that are crucial for roofing professionals. Perfect for mastering roofing best practices and preparation for certification.