Podcast
Questions and Answers
The AEC industry contains various sectors, such as residential, commercial building, and heavy civil & ______.
The AEC industry contains various sectors, such as residential, commercial building, and heavy civil & ______.
highway
Construction related to individual homes, apartments, and condominiums falls under the ______ construction sector.
Construction related to individual homes, apartments, and condominiums falls under the ______ construction sector.
residential
The construction sector that involves bridges and roads is known as heavy civil & ______.
The construction sector that involves bridges and roads is known as heavy civil & ______.
highway
In the residential construction sector, building materials are typically wood products such as ______ and plywood.
In the residential construction sector, building materials are typically wood products such as ______ and plywood.
The Construction Project Management course includes topics like project documentation and ______.
The Construction Project Management course includes topics like project documentation and ______.
One of the objectives of the course is to create a ______ account and get oriented using its features.
One of the objectives of the course is to create a ______ account and get oriented using its features.
The most volatile sector of the construction industry is ______ construction.
The most volatile sector of the construction industry is ______ construction.
The primary tools used in residential construction often include hammers, nails, drills, and ______.
The primary tools used in residential construction often include hammers, nails, drills, and ______.
Commercial construction addresses the needs of ______, trade, and government.
Commercial construction addresses the needs of ______, trade, and government.
The primary building materials associated with commercial construction include steel, concrete, and ______.
The primary building materials associated with commercial construction include steel, concrete, and ______.
Heavy civil construction often includes projects such as roadways, bridges, tunnels, and ______.
Heavy civil construction often includes projects such as roadways, bridges, tunnels, and ______.
Industrial construction requires firms with vast resources and engineering ______.
Industrial construction requires firms with vast resources and engineering ______.
Primary components of industrial construction include steel, concrete, and ______ concrete masonry.
Primary components of industrial construction include steel, concrete, and ______ concrete masonry.
Environmental construction projects aim to improve the environment and maintain public ______.
Environmental construction projects aim to improve the environment and maintain public ______.
Site work in environmental construction often involves trenching, pipe laying, and ______.
Site work in environmental construction often involves trenching, pipe laying, and ______.
In industrial construction, the installation of ______ makes up a big piece of the construction process.
In industrial construction, the installation of ______ makes up a big piece of the construction process.
The ______ determines when a project is needed.
The ______ determines when a project is needed.
The ______ creates a design for the project according to the owner's objectives.
The ______ creates a design for the project according to the owner's objectives.
A ______ builds the project according to the contract documents.
A ______ builds the project according to the contract documents.
Types of ______ include private and public.
Types of ______ include private and public.
The designer ensures that the design meets industry ______ and governing regulations.
The designer ensures that the design meets industry ______ and governing regulations.
Flashcards are hidden until you start studying
Study Notes
Course Outline
- Course titled CEE 472/ARCH 432 focuses on Construction Project Management.
- Week-by-week topics include Industry Overview, Bidding and Procurement, Project Delivery Methods, Cost Estimating, and more.
- Two midterm exams are scheduled: Midterm Exam-1 on 10/1 and Midterm Exam-2 on 11/26.
- Final Project due between 12/3 and 12/17, with a review session before.
Objectives
- Understand the diversity within the Architecture, Engineering, and Construction (AEC) industry.
- Identify key industry participants and their roles in construction projects.
- Create a Procore account and gain familiarity with its functionalities.
AEC Industry Sectors
- Different construction sectors include Residential, Commercial, Heavy Civil & Highway, and Industrial.
- Funding can be public or private, and projects may be horizontal or vertical.
Residential Construction
- Focuses on various housing types: individual homes, apartments, condominiums, townhouses, and prefabricated units.
- Most volatile sector; often designed by architects but can involve simpler tools.
- Primarily uses wood products for construction like lumber and plywood.
Commercial Construction
- Serves commerce, trade, and government; constitutes about one-third of construction market.
- Requires architects and specialty contractors (e.g., ironworkers, pipefitters).
- Common materials include steel, concrete, and glass.
Heavy Civil Construction
- Known as horizontal construction, involves infrastructure: roadways, bridges, tunnels, etc.
- Projects are designed by engineers and typically receive public funding.
- Utilizes equipment extensively, with materials like asphalt, gravel, and concrete.
Industrial Construction
- Involves specialized firms with engineering expertise for constructing industrial buildings.
- Basic exteriors with a focus on installing specialized equipment.
- Primary materials include steel, concrete, and off-site modularization is common.
Environmental Construction
- Aims to improve the environment and public health, involving significant earth moving and site work.
- Requires specialized materials alongside traditional ones, with tasks like trenching and tunneling.
Project Participants
- Owner's Role: Defines project need, objectives, funding, and timelines. Can be private or public entities.
- Designer’s Role: Responsible for project design, compliance with standards, and construction support. Includes architects and engineers.
- Constructor’s Role: Executes the construction according to approved designs and contracts. Types include general contractors and subcontractors.
In-Class Activity
- Students are encouraged to reflect on the differences between the AEC industry and manufacturing processes.
Next Steps
- Students must sign up for a Procore account before the next class.
- Prepare for upcoming discussions on Bidding and Procurement and complete relevant readings.
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.