🎧 New: AI-Generated Podcasts Turn your study notes into engaging audio conversations. Learn more

Building Regulations 2018: Certificates of Consent
10 Questions
0 Views

Building Regulations 2018: Certificates of Consent

Created by
@SpeedyHealing

Podcast Beta

Play an AI-generated podcast conversation about this lesson

Questions and Answers

According to the regulations, what is the purpose of a protection work notice?

  • To report to the municipal building surveyor on the completion of protection work.
  • To determine if protection work is required in accordance with the Act.
  • To provide notice to the adjoining property owner of the intention to carry out protection work. (correct)
  • To obtain consent from the relevant building surveyor to commence building work.
  • What is the purpose of a certificate of compliance?

  • To certify that the building work has been completed in accordance with the Act.
  • To certify that the building work has been inspected and approved by the municipal building surveyor.
  • To certify that the building work complies with the Building Code of Australia. (correct)
  • To certify that the building work has been completed in accordance with the building permit.
  • What is the purpose of a fire performance requirements report?

  • To report on the fire safety measures required to be installed in the building.
  • To report on the fire performance of the building materials used in the construction of the building. (correct)
  • To report on the fire resistance of the building elements.
  • To report on the fire evacuation procedures for the building.
  • What is the purpose of a building notice?

    <p>To notify the relevant building surveyor of a contravention of the Act.</p> Signup and view all the answers

    What is the purpose of a certificate of final inspection?

    <p>To certify that the building is safe for occupation.</p> Signup and view all the answers

    What is the purpose of a report and consent required for building over easements?

    <p>To report on the location of the easements and obtain consent to build over them.</p> Signup and view all the answers

    What is the purpose of a certificate of pool and spa barrier compliance?

    <p>To certify that the pool or spa barrier complies with the applicable barrier standard.</p> Signup and view all the answers

    What is the purpose of a termite risk area?

    <p>To identify areas prone to termite infestation.</p> Signup and view all the answers

    What is the purpose of a private bushfire shelter construction requirement?

    <p>To provide a safe refuge for occupants in the event of a bushfire.</p> Signup and view all the answers

    What is the purpose of an emergency order?

    <p>To direct the owner of a building to take immediate action to rectify a contravention of the Act.</p> Signup and view all the answers

    Study Notes

    • A certificate of consent must contain the following information:
      • Date of issue
      • Description of the proposed domestic building work
      • Address of the land where the work will be carried out
      • Details of the cost of the proposed domestic building work
      • Identification number of the certificate
      • Owner's details: name, address, telephone number, and ABN, ACN, or ARBN (if applicable)
      • If the applicant is not an owner, their details: name, address, telephone number, and ABN, ACN, or ARBN (if applicable)
      • If the owner is a body corporate, names of all directors
      • If the land is subject to a trust, name of the trust and names of all trustees
    • The register kept by the Registrar of the Authority must contain:
      • Date of issue of the certificate
      • Identification number of the certificate
      • Address of the land to which the certificate relatesHere are the study notes for the Building Regulations 2018:
    • Part 1—Preliminary*
    • Objectives of the regulations:
      • Remake with amendments the regulations controlling building design, construction, and use
      • Prescribe standards for building construction and demolition
      • Prescribe standards for safety in places of public entertainment
      • Regulate matters related to building use and maintenance
      • Prescribe requirements for single dwellings and associated buildings
      • Prescribe requirements for fire safety and safety measures
      • Prescribe requirements for swimming pools and spas
    • Part 6—Projections beyond Street Alignment*
    • Projections beyond street alignment
    • Architectural features (narrow, medium, wide streets)
    • Windows and balconies
    • Verandahs
    • Service pipes, rainwater heads, and service installations
    • Window shutters
    • Signs
    • Service cabinet doors
    • Report and consent required
    • Footings adjoining boundaries are permissible
    • Part 7—Protection of Adjoining Property and the Public*
    • Protection of adjoining property by means of protection work
    • Matters relevant to building surveyor determining if protection work is required
    • Protection work notice
    • Protection work response notice
    • Notice of relevant building surveyor's determination
    • Protection of the public
    • Demolition
    • Excavations and retaining walls
    • Part 8—Building Work*
    • Methods of assessment of compliance
    • Testing of materials
    • Fire performance requirements
    • Certificates of compliance
    • Registered building practitioner or endorsed building engineer documentation
    • Evidence of suitability
    • Forms of certificates of compliance
    • Special provisions
    • Record of pile-driving
    • Branding of timber
    • Requirements for permits involving fire safety matters
    • Report and consent for building over easements
    • Report concerning need for electricity substations
    • Report and consent for septic tank systems
    • Stormwater drainage
    • Buildings above or below certain public facilities
    • Part 9—Fire Safety Requirements*
    • Definition of owner
    • Automatic smoke detection and alarm systems
    • Residential care buildings—automatic fire suppression systems
    • Shared accommodation buildings—automatic fire suppression systems
    • Modification to the BCA Volume One in relation to fire sprinkler system requirements
    • Part 9A—Safety Requirements for Swimming Pools and Spas*
    • Application of this Part
    • Requirements for barriers for swimming pools and spas
    • Maintenance and operation of barriers for swimming pools and spas
    • Registration of swimming pools and spas
    • Certain swimming pools and spas exempted from registration
    • Prescribed information for swimming pool and spa registers
    • A register must be maintained in a specific form and manner
    • Application for registration of swimming pools and spas
    • Form and fee for registration application
    • Relevant council to register swimming pool or spa on receipt of application
    • Relevant council to give a notice to the applicant of registration
    • Removal of swimming pool or spa from a register
    • Inspection and certification of compliance of barriers
    • Part 10—Designation of Special Areas for Building Work*
    • Mapping of designated special areas
    • Alteration to and creation of designated special areas
    • Termite risk areas
    • Construction in termite risk areas
    • Significant snowfall areas
    • Report and consent for building in areas liable to flooding
    • Report and consent for construction on designated land or designated works
    • Part 11—Bushfire Safety*
    • Construction in designated bushfire prone areas
    • Relevant building surveyor to accept bushfire attack level in planning scheme or site assessment
    • Requirements for buildings replacing buildings destroyed in the 2009 bushfires
    • Static water supply for fire fighting purposes
    • Access for emergency vehicles
    • Report and consent required for non-complying static water supply and access
    • Private bushfire shelters
    • Part 11A—Emergency Provisions*
    • Definition of emergency
    • Emergency accommodation buildings
    • Intended occupier to notify the relevant council of intended occupation
    • Occupation of emergency accommodation building prohibited before notified commencement date
    • Municipal building surveyor may inspect emergency accommodation building
    • Requirements for emergency accommodation buildings
    • Exemption from certain requirements for emergency accommodation buildings
    • Part 12—Inspections, Notices, and Orders, and Register of Powers of Entry*
    • Inspections and directions
    • Prescribed mandatory notification stages for construction or alteration of building
    • Omission of irrelevant mandatory notification stage
    • Building permit must specify mandatory notification stages
    • Relevant building surveyor to keep and make available directions to fix building work
    • Persons carrying out inspections
    • Relevant building surveyor to give documents to the person to whom the order was given
    • Emergency orders
    • Form of emergency orders
    • Building notices
    • Form of building notice
    • Building orders
    • Form of building orders
    • Additional information in order or notice served in accordance with section 236(4A) of the Act
    • Register of exercise of powers of entry
    • Part 13—Occupancy Permits and Certificates of Final Inspection*
    • Application of this Part
    • Exemptions from occupancy permit
    • Application for occupancy permit
    • Reporting authorities for occupancy permit
    • Time limits for application to be given to reporting authority
    • Time limits relating to the report or consent of reporting authorities
    • Time within which relevant building surveyor must decide application for occupancy permit
    • Form of occupancy permit
    • Relevant building surveyor to provide copy of permit
    • Occupancy permit must specify essential safety measures and related requirements
    • Conditions on occupancy permit
    • Compliance with AS 1851—2012 taken to be compliance with earlier standards
    • Display and inspection requirements for occupancy permits
    • Owner to make permit available for inspection
    • Part 14—Places of Public Entertainment*
    • Prescribed classes of buildings or places
    • Prescribed temporary structures
    • Exemption from permit for temporary structures
    • Prescribed place of public entertainment
    • Conditions on occupancy permits
    • Safety officer qualifications
    • Structural design of prescribed temporary structures
    • Part 15—Maintenance of Buildings and Places of Public Entertainment*
    • Maintenance of essential safety measures
    • Maintenance determinations
    • Owner to comply with maintenance determination
    • Compliance with AS 1851—2012 taken to be compliance with earlier standards
    • Maintenance schedules
    • Reporting and records
    • Owner to prepare annual essential safety measures report
    • Contents and form of annual essential safety measures report
    • Records relating to essential safety measures must be made available
    • Part 16—Existing Buildings*
    • Change of use of existing buildings
    • Subdivision of existing buildings
    • Alterations
    • Alterations affecting exits and paths to exits
    • Extension of non-complying external wall
    • Application of requirements in the BCA Volume One relating to access to buildings for persons with disabilities
    • Small live music venue classification
    • Part 17—Building Product Accreditation*
    • Definitions
    • Accreditation persons and bodies
    • Application for accreditation
    • Application for renewal of accreditation
    • Application for variation of accreditation
    • Refusal to accredit, renew, or vary an accreditation
    • Information in application to remain confidential
    • Accreditation fees
    • Notice of accreditation, renewal of, imposition of a condition on, or variation of, an accreditation
    • Issue or re-issue of a certificate of accreditation
    • Revocation of accreditation
    • Holder may request revocation of accreditation
    • Notice of revocation of accreditation
    • Accreditation ceases to have effect on revocation
    • Offence to falsely claim product accredited
    • Register and records
    • Register of accredited products
    • Records
    • Part 18—Building Practitioners*
    • Registration
    • Information to accompany application for registration
    • Certificate of registration
    • Condition of registration
    • Authority to be advised of nominee director changes
    • Register of Building Practitioners
    • Publication of information on Register of Building Practitioners
    • Prescribed qualifications and classes of building practitioner and prescribed work
    • Prescribed classes of building practitioner
    • Prescribed qualifications
    • Building surveyor work
    • Building inspector work
    • Domestic builder work
    • Advertisements or written statements by registered building practitioners
    • Advertisements or written statements by partnerships
    • Probity and discipline
    • Authority must be notified of probity matters
    • Grounds for disciplinary action
    • Grounds for immediate suspension
    • Notice of suspension or cancellation of registration
    • Professional standards
    • Duplicate certificate fee
    • Period for which private building surveyor may not act
    • Part 19—Appeals and Reviews*
    • Appeal periods
    • Appeal, referral, and application fees
    • Fees for fast track appeals
    • Refund of fees by Authority
    • Review period
    • Part 20—Infringement Notices*
    • Authorised officers
    • Prescribed offences
    • Prescribed penalties
    • Part 21—Exemptions*
    • Exemptions from building regulations
    • Exemption for Class 10 buildings on farm land
    • Exemptions relating to building surveyors for certain buildings
    • Exemption from certain fees
    • Exemption from building permit levy for building work relating to social housing
    • Refund of certain building permit levy
    • Authority is exempted from calculation and notification requirements
    • Part 22—Transitional and Savings Provisions*
    • Registration of building practitioners not affected by revocation of Building Interim Regulations 2017
    • Domestic builder (manager)
    • Appointment of private building surveyor

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Related Documents

    building regs 2018 - 2024v.pdf

    Description

    This quiz covers the information required in a certificate of consent under the Building Regulations 2018. It includes the date of issue and description of proposed domestic building work.

    More Quizzes Like This

    Building Services Regulations
    47 questions
    New Zealand Construction Regulations
    39 questions
    Use Quizgecko on...
    Browser
    Browser