Civil engineers are typically responsible for designing the plumbing, heating, and air-conditioning systems within a building.
False
Foodservice facility design consultants are often called upon to assist in the design of foodservice facilities.
True
Electrical engineers determine the overall electrical load in the building and assign circuits.
True
Heating and air-conditioning systems remove grease, vapor, and heat from the kitchen.
False
Civil engineers are involved in foodservice projects mainly for designing utility plans.
False
Foodservice facility design consultants locate panels and receptacles in a building.
False
During the design development phase, the foodservice design consultant typically prepares detailed floor plans showing the location of each piece of equipment.
True
In the design development phase, the foodservice design consultant prepares a book of catalog sheets for each equipment item to be purchased.
False
Construction documents in the final form include drawings of the new or renovated facility, utility systems, and finishes.
True
In the construction documents phase, specifications describe only the materials, but not the standards of workmanship or methods of installation.
False
During design development, utility plans are prepared to show the location of each utility connection and the load imposed by each equipment piece.
True
In the construction documents phase, the general conditions of the contract define terms, assign responsibility, and establish payment schedules.
True
During the schematic design phase, the architect's drawings show elevations of the outside of the building and the location of parking lots.
True
The purpose of the design development phase is to prepare actual working drawings for general contractors to bid on the project.
False
Value engineering in the design development phase involves evaluating projected operational costs of major equipment systems over their expected lifetimes.
True
Utility plans are typically finalized during the schematic design phase.
False
Design Development allows the project team to explore different approaches and systems to meet the owner's functional needs.
True
The primary purpose of schematic design is to develop detailed drawings for construction purposes.
False
Test your knowledge on designing electrical load, assigning circuits, locating panels, and designing plumbing, heating, ventilation, and air-conditioning systems in a building.