Building Electrical and Mechanical Systems Quiz

AvidKraken avatar
AvidKraken
·
·
Download

Start Quiz

Study Flashcards

18 Questions

Civil engineers are typically responsible for designing the plumbing, heating, and air-conditioning systems within a building.

False

Foodservice facility design consultants are often called upon to assist in the design of foodservice facilities.

True

Electrical engineers determine the overall electrical load in the building and assign circuits.

True

Heating and air-conditioning systems remove grease, vapor, and heat from the kitchen.

False

Civil engineers are involved in foodservice projects mainly for designing utility plans.

False

Foodservice facility design consultants locate panels and receptacles in a building.

False

During the design development phase, the foodservice design consultant typically prepares detailed floor plans showing the location of each piece of equipment.

True

In the design development phase, the foodservice design consultant prepares a book of catalog sheets for each equipment item to be purchased.

False

Construction documents in the final form include drawings of the new or renovated facility, utility systems, and finishes.

True

In the construction documents phase, specifications describe only the materials, but not the standards of workmanship or methods of installation.

False

During design development, utility plans are prepared to show the location of each utility connection and the load imposed by each equipment piece.

True

In the construction documents phase, the general conditions of the contract define terms, assign responsibility, and establish payment schedules.

True

During the schematic design phase, the architect's drawings show elevations of the outside of the building and the location of parking lots.

True

The purpose of the design development phase is to prepare actual working drawings for general contractors to bid on the project.

False

Value engineering in the design development phase involves evaluating projected operational costs of major equipment systems over their expected lifetimes.

True

Utility plans are typically finalized during the schematic design phase.

False

Design Development allows the project team to explore different approaches and systems to meet the owner's functional needs.

True

The primary purpose of schematic design is to develop detailed drawings for construction purposes.

False

Test your knowledge on designing electrical load, assigning circuits, locating panels, and designing plumbing, heating, ventilation, and air-conditioning systems in a building.

Make Your Own Quizzes and Flashcards

Convert your notes into interactive study material.

Get started for free

More Quizzes Like This

Gr7 - Energy and Mechanical Systems Quiz
24 questions
DC Motors Principles Quiz
10 questions

DC Motors Principles Quiz

ExuberantBronze3806 avatar
ExuberantBronze3806
Electrical and Mechanical System Analogies
12 questions
Use Quizgecko on...
Browser
Browser