AHU 3 is supplied by Panelboard ? and Circuit ?.

  • EE / 2
  • EE / 1
  • EE / 4
  • EE / 3 (correct)

The control diagram for Air Handler Unit 3 (AHU 3) is located on which sheet?

M21

AHU 3 is located on which level?

Mezzanine

AHU 3 is located just south of which column?

<p>Column C</p> Signup and view all the answers

What is the motor size and voltage for AHU 3?

<p>25 HP, 3-phase 480 V</p> Signup and view all the answers

What type and how many area type lights are used on the mezzanine level?

<p>Type 'E' / 32</p> Signup and view all the answers

On Mechanical Sheet M2, what does the symbol labeled EF-5 represent?

<p>Return/exhaust grille for Exhaust Fan 5</p> Signup and view all the answers

What are the voltage requirements of EF-5?

<p>3-phase 480 V 60 Hz</p> Signup and view all the answers

What two door sizes are needed for the basement electrical room (Room 1.3)?

<p>3'0&quot; × 7'0&quot; × 1 3/4&quot;</p> Signup and view all the answers

What do the symbols 'DD' in a rectangle represent on the mezzanine power plan?

<p>Duct-mounted smoke detectors</p> Signup and view all the answers

How many 5-horsepower motors are located in the cooling tower?

<p>2</p> Signup and view all the answers

What is located in the area shown as 'Electrical Space' on Sheet M8?

<p>The Main Switchboards</p> Signup and view all the answers

Where is the remote emergency generator panel located according to Sheet E7?

<p>Room 13.9</p> Signup and view all the answers

On which drawing can the necessary pipe and wire size information for Air Handling Units 1 through 11 be found?

<p>E14</p> Signup and view all the answers

On which drawing would one find the necessary panelboard circuit information for Air Handling Units 1 through 11?

<p>E18</p> Signup and view all the answers

Between which two column lines do the 10 main mechanical piping lines run in Work Area A-D 1-3?

<p>Between C and D at 1, 2, and 3</p> Signup and view all the answers

What type of lighting is used in the catwalk area?

<p>4' bare lamp strip, pendant mounted Lithonia No.CS240</p> Signup and view all the answers

What type of conduit is used for all exposed raceways in Etch Room 4.1?

<p>PVC</p> Signup and view all the answers

What is the rating of the high pressure rinse pump supplied by Panelboard MSB2, Circuit 16?

<p>125 hp</p> Signup and view all the answers

What is the name of the room supplied by Panelboard MSB2, Circuit 15?

<p>Inspection and Packing Room</p> Signup and view all the answers

What does the outlet supplying countertops in Lab 15.1 consist of?

<p>Multi-outlet assemblies using 120-V 20-A outlets / 8&quot; above the countertop</p> Signup and view all the answers

Where is the PIV located according to Drawing E9?

<p>Outside the north building wall in line with Column 4</p> Signup and view all the answers

What are the dimensions of the HVAC ductwork from AHU 4?

<p>46&quot; X 46&quot;</p> Signup and view all the answers

How is the damper motor symbol described on the HVAC prints?

<p>Square with an upper case letter M within it</p> Signup and view all the answers

Flashcards are hidden until you start studying

Study Notes

Electrical and Mechanical Systems Overview

  • AHU 3 is powered by an unspecified panelboard and specific circuit noted as EE / 3.(E18).
  • Control diagram for AHU 3 is detailed on Sheet M21.
  • Primary reasons for consulting the control diagram include:
    • Identifying control devices that operate various motors
    • Understanding the sequence of operations
    • Pinpointing components of the system.

Location and Specifications of AHU 3

  • AHU 3 is situated on the mezzanine level (E14) and is located south of Column C (E13).
  • The unit operates with a motor rated at 25 HP, 3-phase, 480 V (E14).
  • Mezzanine uses 32 area type "E" lights, incorporating both normal and emergency luminaries (E13).

Mechanical Components and Plans

  • Exhaust Fan 5 (EF-5) is represented on Mechanical Sheet M2 by a square with a diagonal line, indicating a return/exhaust grille (M1).
  • EF-5 requires a 3-phase power supply of 480 V, 60 Hz (M17).
  • The Main Switchboards are located in an area labeled "Electrical Space" on Sheet M8.

Electrical Room and Panel Specifications

  • Two doors for the basement electrical room (Room 1.3) both need to measure 3'0" × 7'0" × 1 3/4" (A8).
  • Each air handling unit on the mezzanine is equipped with duct-mounted smoke detectors connected to the fire alarm system (E16).
  • The cooling tower contains 2 motors, each rated at 5 horsepower (E23).

Emergency Power and HVAC Coordination

  • The remote emergency generator panel is found located in Room 13.9 (A2).
  • Necessary pipe and wire size information for Air Handling Units 1 through 11 can be found on drawing E14.
  • Panelboard circuit details for AHUs 1 through 11 are outlined in drawing E18.

Mechanical Piping and Lighting

  • Main mechanical piping lines run between column lines C and D at areas 1, 2, and 3 (M5).
  • Catwalk area features a bare lamp strip, 4' long, pendant-mounted Lithonia fixture CS240, powered at 277 V (E15).

Conduit and Rinse Area Specifications

  • PVC is used exclusively for all exposed raceways in Etch Room 4.1 (E6).
  • In the high-pressure water rinses area, Panelboard MSB2, Circuit 16 powers a 125 hp rinse pump (E6).
  • Circuit 15 on the same panelboard supplies a large rinse pump control/starter/disconnect unit located in the Inspection and Packing Room (A1).

Outlet Configurations and Location Indicators

  • In Lab 15.1, countertop outlets are configured as multi-outlet assemblies with 120-V 20-A outlets positioned 8" above the countertop (E7).
  • The post indicator valve connection referenced on Drawing E9 is located outside the north building wall, aligned with Column 4 (E1).

Ductwork and Symbol Indicators

  • The ductwork from AHU 4, positioned below Column Line C, measures 46" by 46" (M2).
  • In HVAC prints, a damper motor is symbolized as a square with an upper case "M" inside it (M1).