When should the pre-bid conference be held?

  • Thirty (30) calendar days before the deadline for the submission and receipt of bids (correct)
  • At least 5 calendar days after the deadline for the submission and receipt of bids
  • Forty (40) calendar days after the bid submission deadline
  • At least 10 calendar days before the bid submission deadline

What is one of the main purposes of the pre-bid conference according to the text?

  • To discuss, clarify, and explain the eligibility requirements and components of the contract (correct)
  • To announce the winner of the bidding process
  • To finalize the contract immediately
  • To collect bids from prospective bidders

How can a pre-bid conference be conducted according to the text?

  • Face-to-face through videoconferencing, webcasting, or similar technology, or a combination thereof (correct)
  • Via postal mail
  • Through email correspondence only
  • Only in person

In what circumstances can a longer period for bid preparation be necessary?

<p>By reason of the method, nature, or complexity of the contract to be bid (A)</p> Signup and view all the answers

What technology can be used for conducting pre-bid conferences electronically?

<p>Videoconferencing capabilities, webcasting, or similar technology (C)</p> Signup and view all the answers

What does the Procuring Entity consider when determining the need for a longer bid preparation period?

<p>The method, nature, or complexity of the contract to be bid (A)</p> Signup and view all the answers

What should the pre-bid conference explain to prospective bidders?

<p>The eligibility requirements and components of the contract to be bid (B)</p> Signup and view all the answers

What can make international participation more advantageous to the GoP?

<p>When international participation will be more advantageous due to the method, nature, or complexity of the contract to be bid (B)</p> Signup and view all the answers