B5 Product Identification & Labeling Quiz
8 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What color label is used to designate PE products?

  • White (correct)
  • Blue
  • Orange
  • Yellow
  • Which of the following items is NOT part of the anatomy of the production tag?

  • Color Code (correct)
  • QA Signoff Box
  • Bottom Tear-Off
  • Part Number
  • What is required after a pallet is filled and tagged?

  • An inspection by the Quality Auditor (correct)
  • Transfer to a different facility
  • Manual recording of part number
  • Immediate shipment
  • How long must a pallet set and cool before further processing?

    <p>2 hours</p> Signup and view all the answers

    What automatically populates the Machine, Shift, & Pallet # on the production tag?

    <p>Printing application based on login</p> Signup and view all the answers

    What is the purpose of the QA Signoff Box on the production tag?

    <p>To indicate that quality inspection has occurred</p> Signup and view all the answers

    Which type of product does an orange label designate?

    <p>IMTANK</p> Signup and view all the answers

    What form must be completed after the pallet has been finished?

    <p>Form 806.3a</p> Signup and view all the answers

    Study Notes

    B5 Product Identification Labeling for Packaging

    • Each pallet of parts will be tagged with a production label.
    • White labels designate PE product, Yellow labels designate PP product, Orange are for IMTANK, & Blue for CM tank.
    • Tag colors need to be referenced in QA plans as not all parts follow the above color scheme.

    Anatomy of Production Tag

    • Production Tag includes Part Number, Machine, Shift, & Pallet Number, Part Qty, Date, Utility ID, QA Signoff Box, Tag Number, and Bottom Tear-off
    • Shift, Pallet#, Machine, & Utility ID are automatically populated by printing app based on sign-in and part selection.

    IM & CM TANK

    • Uncontrolled Document When Printed

    STORMTECH/CHAMBERS/ENDCAPS/EZ SNAP LIDS/RISERS & EZ SET LIDS

    • Completed pallet is brought to the staging area.
    • Quality Auditor inspects after pallet has been completed.
    • Pallet needs to set and cool for at least 2 hours.
    • Completed form 806.3a is filled out.
    • If pallet does not need to set and cool, lids can start to be made.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    Test your knowledge on product identification labeling for packaging. This quiz covers the color coding system for tags, the anatomy of production tags, and the QA processes involved. Learn how to navigate through various component tags and their implications in production.

    More Like This

    Labeling Procedure Quiz
    3 questions

    Labeling Procedure Quiz

    SpeedyAquamarine avatar
    SpeedyAquamarine
    Labeling Procedure Quiz
    10 questions
    Product Packaging and Labeling Quiz
    8 questions
    Use Quizgecko on...
    Browser
    Browser