Where are the hot and cold pipes for the utility sink being brought from?

  • From the living room
  • From the kitchen (correct)
  • From the bathroom
  • From the attic
  • What has been done to the floors in the video?

  • They have been cleaned
  • They have been installed (correct)
  • They have been removed
  • They have been painted
  • What is the next room they will be working on after the utility sink?

  • Bedroom
  • Bathroom (correct)
  • Living room
  • Attic
  • Which material is being used to connect the underfloor heating system to the boiler?

    <p>Copper</p> Signup and view all the answers

    What type of lagging is being used to protect the plumbing from the wall and coldness of the blocks?

    <p>Hair fat lagging</p> Signup and view all the answers

    Where are the hot and cold pipes for the kitchen sink being placed?

    <p>Behind the wall</p> Signup and view all the answers

    Study Notes

    Installation of Underfloor Heating and Plumbing for House Extension

    • The underfloor heating system is being installed in the house extension.
    • The pipe work for the underfloor heating manifold is being set up and will be dabbed off the wall.
    • The electrician box is positioned 25mm off the wall, which will be plasterboarded before fitting the manifold.
    • Copper flowing returns are being used to connect to the boiler as copper could not be used due to the joist's layout.
    • Radiator and kitchen plumbing are being installed in Copper.
    • Hair fat lagging is used to protect the plumbing from the wall and coldness of the blocks.
    • The hot and cold pipes for the kitchen sink are being brought out and will be placed behind the wall.
    • The pipes are labeled and connected with an elbow, and copper is being used to run the pipes.
    • The pipes are lagged and clipped to the wall to hold them in position.
    • The utility sink plumbing will be brought down in the stud work, and copper pipes will be used to feed them.
    • The pipes are being brought out in Copper, and hot and cold feeds are being set up in the stud work.
    • The ceiling is up, and the plumbing is being done for the bathroom in the next video.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    Test your knowledge on the installation of underfloor heating and plumbing for a house extension with this informative quiz. From the setup of the underfloor heating manifold to the installation of copper flowing returns, this quiz covers all the important aspects of the process. Challenge yourself by identifying the correct materials used for different plumbing connections and learn about the best practices for protecting plumbing from the wall and coldness of the blocks. Take this quiz and become an expert in underfloor heating and plumbing installation for house extensions.

    More Like This

    Use Quizgecko on...
    Browser
    Browser