Architectural Floor and Foundation Plans
12 Questions
1 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the role of layer filters in drafting floor plans?

  • To include all layers in the list view pane
  • To screen out unwanted layers and simplify the list view pane (correct)
  • To distort the floor plan
  • To add complexity to the layer properties manager

What is the purpose of symbols on floor plans?

  • To describe items associated with living in the home and construction details (correct)
  • To add clutter and complexity to the floor plan
  • To show only construction-related items like electrical circuits and material sizes
  • To represent only living items like doors and windows

What is the function of wall footings in drafting the floor plan?

  • To serve as external references
  • To indicate door and window locations
  • To distribute the load into the ground (correct)
  • To create electrical circuits

What does a library path refer to in AutoCAD drafting?

<p>The default search path for finding an xref file (D)</p> Signup and view all the answers

What should be done with dimensions that were not placed on previous plan views?

<p>Place them as needed on the foundation plan (D)</p> Signup and view all the answers

What should be included in the foundation plan according to the text?

<p>Foundation walls, bearing footings, and support beams (C)</p> Signup and view all the answers

Why is it suggested to store the foundation plan separately from the floor plan?

<p>To make plotting easier (A)</p> Signup and view all the answers

Why do drafters store general notes as a WBLOCK for reuse on future foundation plans?

<p>To save disk space (A)</p> Signup and view all the answers

What is the first step in drawing a foundation plan using CAD?

<p>Plan where the drawing will be created and stored, the needed layers, line types, and what loads will need to be supported (C)</p> Signup and view all the answers

Which command is used to lay out the thickness of the stem walls and footings?

<p>OFFSET command (B)</p> Signup and view all the answers

What should be done after drawing the outer side of the stem walls using the OSNAP command?

<p>Freeze all floor-related information (A)</p> Signup and view all the answers

What is the purpose of using the FILLET or TRIM command when laying out the thickness of the stem walls and footings?

<p>To adjust corners while laying out the thickness of the stem walls and footings (C)</p> Signup and view all the answers

More Like This

Use Quizgecko on...
Browser
Browser