What is required for ensuring safety when working near overhead electrical equipment?
What is required for ensuring safety when working near overhead electrical equipment?
What role does the RE organization play in the 22 kV power supply arrangement?
What role does the RE organization play in the 22 kV power supply arrangement?
What type of transformer is used for the 22 kV energization?
What type of transformer is used for the 22 kV energization?
What must be included in the schematic diagram for the 22 kV power supply arrangement?
What must be included in the schematic diagram for the 22 kV power supply arrangement?
Signup and view all the answers
How should the organization respond to breakdowns in the 22 kV supply arrangement?
How should the organization respond to breakdowns in the 22 kV supply arrangement?
Signup and view all the answers
What is the purpose of the First-Aid Boxes in the specified locations?
What is the purpose of the First-Aid Boxes in the specified locations?
Signup and view all the answers
Which procedure is necessary before work can commence near overhead electrical equipment?
Which procedure is necessary before work can commence near overhead electrical equipment?
Signup and view all the answers
What is required to be published at least a month in advance of energization?
What is required to be published at least a month in advance of energization?
Signup and view all the answers
What is the significance of the audible and visual indication arrangement in the power supply arrangement?
What is the significance of the audible and visual indication arrangement in the power supply arrangement?
Signup and view all the answers
Which notification is NOT included in the public notifications for energization?
Which notification is NOT included in the public notifications for energization?
Signup and view all the answers
What is one of the responsibilities of maintenance staff in relation to insulated tools?
What is one of the responsibilities of maintenance staff in relation to insulated tools?
Signup and view all the answers
What should be done with the OHE during night hours?
What should be done with the OHE during night hours?
Signup and view all the answers
What should be displayed prominently at each station to ensure safety?
What should be displayed prominently at each station to ensure safety?
Signup and view all the answers
Which certificate is necessary regarding the removal of L.T and H.T infringements?
Which certificate is necessary regarding the removal of L.T and H.T infringements?
Signup and view all the answers
Who issues the joint safety certificate regarding safety to traffic?
Who issues the joint safety certificate regarding safety to traffic?
Signup and view all the answers
What kind of certificate is required for the Department of Telecommunications?
What kind of certificate is required for the Department of Telecommunications?
Signup and view all the answers
Which safety measure should be communicated to loco drivers?
Which safety measure should be communicated to loco drivers?
Signup and view all the answers
An application to EIG is required for what purpose?
An application to EIG is required for what purpose?
Signup and view all the answers
What kind of warnings should be stenciled on diesel and steam locos?
What kind of warnings should be stenciled on diesel and steam locos?
Signup and view all the answers
What is the primary purpose of energizing OHE at 2.2kV?
What is the primary purpose of energizing OHE at 2.2kV?
Signup and view all the answers
Which stakeholders are involved in ensuring knowledge about safety among staff?
Which stakeholders are involved in ensuring knowledge about safety among staff?
Signup and view all the answers
During which hours is the anti-theft energization of OHE allowed?
During which hours is the anti-theft energization of OHE allowed?
Signup and view all the answers
Which of the following works must be completed before 2.2kV energization of OHE?
Which of the following works must be completed before 2.2kV energization of OHE?
Signup and view all the answers
What requirement must all HT crossings meet for the anti-theft energization?
What requirement must all HT crossings meet for the anti-theft energization?
Signup and view all the answers
What must replace existing DC track relays to accommodate 2.2kV energization?
What must replace existing DC track relays to accommodate 2.2kV energization?
Signup and view all the answers
What should be implemented on existing semaphore signals if the electrical clearance is insufficient?
What should be implemented on existing semaphore signals if the electrical clearance is insufficient?
Signup and view all the answers
Which precaution must be taken regarding overhead structures like ROBs and FOBs?
Which precaution must be taken regarding overhead structures like ROBs and FOBs?
Signup and view all the answers
What is the alternative to providing bonding and earthing work in station areas if it has not been completed?
What is the alternative to providing bonding and earthing work in station areas if it has not been completed?
Signup and view all the answers
Before anti-theft energization, what must be set up at all level crossings?
Before anti-theft energization, what must be set up at all level crossings?
Signup and view all the answers
Which of the following does NOT need to be completed prior to the 2.2kV anti-theft energization?
Which of the following does NOT need to be completed prior to the 2.2kV anti-theft energization?
Signup and view all the answers
What must be obtained prior to the energisation of a section at 2.2 kV?
What must be obtained prior to the energisation of a section at 2.2 kV?
Signup and view all the answers
Who may conduct the joint checks and tests prior to commissioning?
Who may conduct the joint checks and tests prior to commissioning?
Signup and view all the answers
Which of the following checks is NOT typically performed prior to energisation?
Which of the following checks is NOT typically performed prior to energisation?
Signup and view all the answers
What test is specifically mentioned for continuity and insulation of the OHE?
What test is specifically mentioned for continuity and insulation of the OHE?
Signup and view all the answers
What is the purpose of creating an earth fault during testing?
What is the purpose of creating an earth fault during testing?
Signup and view all the answers
Who certifies that the section can be energized at 2.2 kV for test purposes?
Who certifies that the section can be energized at 2.2 kV for test purposes?
Signup and view all the answers
What must be checked regarding earthing and bonding of the OHE?
What must be checked regarding earthing and bonding of the OHE?
Signup and view all the answers
What type of fault tests are required after certification to energise the section?
What type of fault tests are required after certification to energise the section?
Signup and view all the answers
What is indicated as a requirement for height at level crossings?
What is indicated as a requirement for height at level crossings?
Signup and view all the answers
What should be done with overhead equipment adjacent to the section to be energized?
What should be done with overhead equipment adjacent to the section to be energized?
Signup and view all the answers
What is required to be prominently displayed at each station regarding safety?
What is required to be prominently displayed at each station regarding safety?
Signup and view all the answers
Which certificate is specifically related to the telecommunications aspect of the energization process?
Which certificate is specifically related to the telecommunications aspect of the energization process?
Signup and view all the answers
What is the purpose of issuing notifications to users of level crossings before energization?
What is the purpose of issuing notifications to users of level crossings before energization?
Signup and view all the answers
Who is responsible for issuing the certificate regarding the removal of L.T and H.T infringements?
Who is responsible for issuing the certificate regarding the removal of L.T and H.T infringements?
Signup and view all the answers
What type of warning should be communicated to steam/diesel loco drivers regarding safety?
What type of warning should be communicated to steam/diesel loco drivers regarding safety?
Signup and view all the answers
Which of the following is NOT included as part of the safety certificates required after completion of work?
Which of the following is NOT included as part of the safety certificates required after completion of work?
Signup and view all the answers
What should be included in the public notifications regarding the energization of sections?
What should be included in the public notifications regarding the energization of sections?
Signup and view all the answers
What is the purpose of the application to EIG concerning energization?
What is the purpose of the application to EIG concerning energization?
Signup and view all the answers
Which of the following safety measures is essential before anti-theft energization?
Which of the following safety measures is essential before anti-theft energization?
Signup and view all the answers
What is the maximum allowed duration for anti-theft energization of OHE?
What is the maximum allowed duration for anti-theft energization of OHE?
Signup and view all the answers
Which of the following is NOT a requirement to be completed before 2.2kV anti-theft energization?
Which of the following is NOT a requirement to be completed before 2.2kV anti-theft energization?
Signup and view all the answers
What voltage level must HT crossings meet for the 2.2kV anti-theft energization?
What voltage level must HT crossings meet for the 2.2kV anti-theft energization?
Signup and view all the answers
Which component must be replaced to accommodate the 2.2 kV energization procedures?
Which component must be replaced to accommodate the 2.2 kV energization procedures?
Signup and view all the answers
What safety feature must be implemented if the electrical working clearance is insufficient?
What safety feature must be implemented if the electrical working clearance is insufficient?
Signup and view all the answers
What must be done regarding the return conductor (RC) in station areas if bonding and earthing work remain incomplete?
What must be done regarding the return conductor (RC) in station areas if bonding and earthing work remain incomplete?
Signup and view all the answers
To which structures should height gauges and caution boards be provisioned?
To which structures should height gauges and caution boards be provisioned?
Signup and view all the answers
What modifications to communication line track crossings are required for 2.2kV energization?
What modifications to communication line track crossings are required for 2.2kV energization?
Signup and view all the answers
What type of boards must be present on over line structures like ROBs and FOBs?
What type of boards must be present on over line structures like ROBs and FOBs?
Signup and view all the answers
Which of the following works is NOT specifically mentioned as necessary for 2.2 kV energization?
Which of the following works is NOT specifically mentioned as necessary for 2.2 kV energization?
Signup and view all the answers
What is the required distance personnel must maintain from the overhead electrical equipment unless they have a 'Permit to Work'?
What is the required distance personnel must maintain from the overhead electrical equipment unless they have a 'Permit to Work'?
Signup and view all the answers
Which of the following is NOT a part of the 22 kV energization process described?
Which of the following is NOT a part of the 22 kV energization process described?
Signup and view all the answers
What must the organization issue in the form of a circular concerning the 22 kV power supply?
What must the organization issue in the form of a circular concerning the 22 kV power supply?
Signup and view all the answers
Which precaution is advised for personnel working with overhead equipment during the night?
Which precaution is advised for personnel working with overhead equipment during the night?
Signup and view all the answers
What does the joint procedure order need to indicate?
What does the joint procedure order need to indicate?
Signup and view all the answers
What type of arrangements are necessary for the 22 kV power supply to include?
What type of arrangements are necessary for the 22 kV power supply to include?
Signup and view all the answers
Who is responsible for completing the checks and tests prior to commissioning?
Who is responsible for completing the checks and tests prior to commissioning?
Signup and view all the answers
What is one of the safety measures to be adhered to regarding the Over Head Equipment?
What is one of the safety measures to be adhered to regarding the Over Head Equipment?
Signup and view all the answers
What specific obligation does the RE organization have regarding the 22 kV supply arrangement?
What specific obligation does the RE organization have regarding the 22 kV supply arrangement?
Signup and view all the answers
What must be included in the joint safety certificate regarding safety to traffic?
What must be included in the joint safety certificate regarding safety to traffic?
Signup and view all the answers
Which individual is preferred for nomination to conduct joint checks and tests before energisation?
Which individual is preferred for nomination to conduct joint checks and tests before energisation?
Signup and view all the answers
What is the minimum requirement concerning the height of contact wire at level crossings?
What is the minimum requirement concerning the height of contact wire at level crossings?
Signup and view all the answers
What type of fault tests are to be conducted after certifying that a section can be energized at 2.2 kV?
What type of fault tests are to be conducted after certifying that a section can be energized at 2.2 kV?
Signup and view all the answers
Which of the following checks ensures the safety of overhead equipment before energisation?
Which of the following checks ensures the safety of overhead equipment before energisation?
Signup and view all the answers
Which action is NOT part of the checks carried out before energisation?
Which action is NOT part of the checks carried out before energisation?
Signup and view all the answers
Who is responsible for certifying that the section can be energized at 2.2 kV?
Who is responsible for certifying that the section can be energized at 2.2 kV?
Signup and view all the answers
What is required in terms of earthing and bonding within station areas?
What is required in terms of earthing and bonding within station areas?
Signup and view all the answers
What determines whether the Joint check and tests will be carried out with CEE oversight?
What determines whether the Joint check and tests will be carried out with CEE oversight?
Signup and view all the answers
What safety measures are stipulated for overhead equipment adjacent to the energized section?
What safety measures are stipulated for overhead equipment adjacent to the energized section?
Signup and view all the answers
Which verification involves clearance compliance with specified dimensions?
Which verification involves clearance compliance with specified dimensions?
Signup and view all the answers
Study Notes
General Guidelines for Anti-theft Charging of OHE
- Anti-theft energization of overhead contact wire (OHE) at 2.2kV is used to deter theft
- This measure is for preventing theft, not for train operation
- It is unlikely to affect signaling and telecommunication systems because of low current
- Works such as installing isolators, section insulators, switches, and adjustments must be completed (or at least checked) prior to charging at 2.2kV
- Anti-theft charging is limited to night hours (7 PM to 7 AM)
Works to be Completed Prior to 2.2kV Energization
-
Structure and Rail Bonding: Complete bonding and earthing in accordance with the bonding and earthing code. Station areas, if bonding/earthing is incomplete, use the return conductor (RC) as earth wire attached to structures/supports via jumpers.
-
Low Tension (LT) Modifications: All necessary LT modifications must be done
-
High Tension (HT) Crossing Modifications: All HT crossings must meet the 2.2kV standards
-
Semaphore Signals: Wire mesh screens on working platforms of existing semaphore signals (if working clearance of 2m isn't available)
-
Signal Post Clearances: No part of a signal post/fitting should be less than 700mm from the live conductor
-
Communication Line Conversion: Convert track crossings to cable and remove overhead wires
-
Level Crossing Provisions: Height gauges, caution boards (25kV), public warning boards, and first-aid boxes installed at level crossings
-
Staff Safety: Insulated tools and modified watering arrangements, water columns for staff
-
Other Important Preparations: all relevant rules and precautions according to Indian Electricity Rules applied to the work
22kV Power Supply Arrangement
- Local 22kV supply available at a station with a step-up transformer, fuses, audible and visual indications.
- A schematic diagram needs to be approved by the EIG (Engineering Inspectorate Group).
- 22kV supply arrangement to have round-the-clock operation by Railway employee (RE). Responsibilities and staff availability in normal and abnormal situations must be detailed and distributed.
- OHE is energized at night, but must be considered live and hazardous to all people who aren't authorized.
- A permit to work procedure is necessary for personnel working or near the energized system.
Energization Procedures
- Publication and display notices a month before energization: Public notices and notifications (English, Hindi, local) are mandatory about the section(s) that will be energized, including level crossings
- Display visual warnings: caution notices at all important locations, including signage on diesel/steam locomotives, locosheds and warning messages
- Detailed checklist given for checks and tests before charging: including clearances between live and earthed structures, earthing/bonding, proper height of contact wires, protective screens on critical equipment, appropriate earthing/isolation of overhead equipment and appropriate removal of wires.
Tests
- Megger tests for OHE continuity and insulation
- Earth fault tests at the farthest parts of the energized OHE, to ensure fuses are working properly.
- Tests to be carried out by a designated officer from the Government for Railways or the authorized representative from the Railway side
- Certificates should be obtained from the concerned authorities.
- A notification that the OHE is energized is required.
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.
Related Documents
Description
This quiz covers the guidelines for anti-theft energization of overhead contact wire (OHE) at 2.2kV. Learn about the necessary works to be completed before charging, the impact on existing systems, and the hours during which this energization should occur. Test your understanding of these crucial safety measures.