AKK Gas Pipeline Project Overview

WillingElf avatar
WillingElf
·
·
Download

Start Quiz

Study Flashcards

30 Questions

What is the primary objective of the AKK gas pipeline project?

To supply 2 bcfd of gas to power developments in Abuja, Kaduna, and Kano

What is the total length of the AKK gas pipeline?

614km

What is the name of the master plan that approved the AKK gas pipeline project?

Nigeria Gas Master Plan

What is the name of the first phase of the Trans-Nigeria Gas pipeline?

AKK Project

What is the diameter of the AKK gas pipeline?

40 inches

What is the diameter of the pipeline from TNGP (Early Gas) to Obite?

36"

Through which states will the AKK gas pipeline pass?

Abuja, Niger State, Kaduna State, and Kano State

What percentage of the project is completed according to the Planned Actual chart?

72.72%

What was initialized in 2017?

Project approval by FEC

What is the length of the pipeline from Cawthorne Channel to NGC Facility?

26 Km

What is the diameter of thepipeline from Trans Nigerian Gas Pipeline to Okpolo?

36"

What has the Nigerian Content Certificate of Compliance been issued by?

NCDMB

What percentage of the project's funding is being provided by the Bank of China?

85%

What is the role of Standard Chartered Bank in the project?

Financial Adviser

When was the Presidential Groundbreaking Ceremony held?

30th June 2020

What is the purpose of the Sovereign Guarantee provided by the FMoF?

To provide a guarantee for the project's loan

What is the current status of the 15km construction activities?

ROW clearing, grading, and stringing have been completed

Who is awaiting approval from SINOSURE and other government agencies?

Bank of China

What is the initial point of transportation for Line Pipes from China?

Warri Port

What is the primary purpose of the Project Quality Team during the transportation of Line Pipes?

To track and repair damages to coatings, pipe bevel, or body

What is the name of the system used to ensure pipeline technical integrity and assurance management?

Pipe Tracking and Pipeline Construction Management System (PTS)

How many main welding methods are used in the Project?

3

What is the primary objective of the NNPC HSEQ Policy Statement?

To promote the Health and Safety of employees and the public

What type of examination is used to inspect welds?

Non-Destructive Testing (NDT)

What is the purpose of the pre-mob inspection for project vehicles?

To ensure vehicles are in good working condition before deployment

What is the role of Project Leadership in relation to HSE concerns?

To ensure all identified HSE concerns are adequately closed out

What is the purpose of remotely monitoring drivers' speed and travel routes?

To ensure compliance with approved journey management plans

Why are toolbox talks, JHA, and WMS necessary?

To enable workers to safely execute tasks

What was the outcome of the engagement with RoW communities?

Disbursement of compensation to affected communities

What was the role of the 23 consultants engaged for the RoW acquisition?

To engage with RoW communities and other stakeholders

This quiz covers the AKK Gas Pipeline Project, including its objectives, background, existing and planned infrastructure, project approvals, completion status, finance, quality assurance, and community affairs. Learn about the project's journey so far and the lessons learned.