What is the primary responsibility of designated Software Support Activities (SSA) regarding software TDs?

  • Verifying software TDs at the Navy user level (correct)
  • Coordinating with NSWC Corona and NAVAIR METCAL
  • Performing incorporation level verification of software TDs
  • Verifying proper installation and operation of software at user level installations
  • When is incorporation level verification of software TDs required?

  • When the standard loading process is not used for every software change (correct)
  • When the standard loading process is used for every software change
  • During user level installation
  • During SSA verification
  • What is the purpose of coordination with NSWC Corona and NAVAIR METCAL during software TD verification?

  • To coordinate with TYCOMs/Controlling Custodians
  • To perform incorporation level verification
  • To ensure compliance with TDs
  • To verify software TDs for calibratable Support Equipment (correct)
  • What determines the requirement for separate verifications on each block of aircraft?

    <p>Variation in configuration among blocks of aircraft</p> Signup and view all the answers

    What is the purpose of verifying TDs on multiple kits on each affected T/M/S?

    <p>To ensure compliance with TDs</p> Signup and view all the answers

    Who can waive the requirement for verification on each affected aircraft/equipment T/M/S?

    <p>NAVAIR SUSTAINMENT GROUP, TECHNICAL DIRECTIVES/BULLETINS BRANCH</p> Signup and view all the answers

    What is the purpose of coordinating Organic (I-) Level and (D-) Level verification plans with SUSTAINMENT GROUP/FRC?

    <p>To ensure proper coordination of verification plans</p> Signup and view all the answers

    Who is responsible for coordinating verifications performed by (O-) Level maintenance activities?

    <p>TYCOMs/Controlling Custodians</p> Signup and view all the answers

    What is the purpose of verifying TDs applicable to more than one aircraft/equipment T/M/S on each affected T/M/S?

    <p>To ensure compliance with TDs</p> Signup and view all the answers

    What determines the requirement for verification of TDs at multiple maintenance levels?

    <p>The requirement for compliance action at more than one maintenance level</p> Signup and view all the answers

    How are Exploration Bulletins subdivided?

    <p>By type of equipment and then sequentially numbered within each type</p> Signup and view all the answers

    What is the title of TDs that affect training equipment under the management control of NAVAIR PMA 205?

    <p>Training Equipment</p> Signup and view all the answers

    Who manages TECs and TEBs?

    <p>PMA 205</p> Signup and view all the answers

    How are TEB numbers assigned?

    <p>By the submission of a NAVAIR approved CCB package through ECM tool to NATEC</p> Signup and view all the answers

    What is the purpose of Service Life Bulletins (SLBs)?

    <p>To issue immediate or urgent changes to defined life limits of systems or equipment</p> Signup and view all the answers

    How are SLBs subdivided?

    <p>By type of equipment or model and then sequentially numbered within each type</p> Signup and view all the answers

    What is the recommended method for PMAs to process SLBs for review within the PMA prior to release?

    <p>Using the IDR within ECM</p> Signup and view all the answers

    What is the purpose of the bulletin number assignment section of NATEC?

    <p>To assign TEB numbers</p> Signup and view all the answers

    What is the purpose of Technical Directives (TDs)?

    <p>To issue technical directives</p> Signup and view all the answers

    During which stages do TDs pass through during preparation, validation, verification, approval, and publication?

    <p>Several developmental stages</p> Signup and view all the answers

    Study Notes

    Installation and Removal of Missionized Equipment

    • Installation and removal of missionized equipment on an aircraft does not require a Technical Directive (TD).
    • However, if a configuration change is required for an item of missionized equipment, it will be treated as any other configuration item and will follow the policy and procedures for a configuration change.

    Data Files

    • "Data files" refers to static, uncompiled data that does not alter the software footprint.
    • Examples of data files include:
      • Threat data
      • Navigation data
      • Digital terrain data
      • Miscellaneous parametric data
      • Other data files that provide static input to the mission critical computer software

    Software

    • "Software" refers to executable machine code that is produced by an assembler or compiler.
    • Software does not include the data (or data files) that are processed by an application program or system software.

    Technical Directives (TDs)

    • TDs shall be titled based on the type of equipment or system affected, such as:
      • Airborne Weapon (AWC/75, AWB/76)
      • Meteorological Equipment (MEC/73, MEB/79)
      • Photographic (PHC/68, PHB/69)
      • Target Control System (TCC/77, TCB/78)

    TD Categories

    • Immediate Action: assigned when factors of combat necessity present hazardous conditions that could result in personal injury or damage to valuable property.
    • Urgent Action: assigned when factors of combat necessity present hazardous conditions that could result in personal injury or damage to valuable property, but are less serious than those for which the Immediate Action category would be assigned.
    • Routine Action: assigned whenever the urgency of the situation does not warrant assignment of the Immediate or Urgent Action categories.

    Verification of TDs

    • Verification of software TDs will normally be performed by designated Software Support Activities (SSA).
    • Verification of a software TD, via SSAs, for an item of calibratable Support Equipment, shall ensure coordination with NSWC Corona and NAVAIR METCAL.
    • TDs applicable to more than one aircraft/equipment Type Model Series (T/M/S) shall be verified on each affected aircraft/equipment T/M/S.

    Technical Directives (TDs)

    • TDs must be routed for review using the Enterprise Change Management (ECM) tool and the TD Object workflow.
    • The Assistant Program Manager for Logistics (APML)/Configuration Manager (CM) is responsible for establishing and maintaining distribution/approvals for each TD.

    TD Review and Approval

    • After TD review is complete, routing TD for approval signature shall be done in the same ECM tool as the review.
    • Other reference documents, such as TD Verification Certification Form (5215/12), TD Logistics Support Checklist (5215/9), and supporting documentation, must be loaded in the routing folder.

    TD Issuance

    • All TDs shall be issued by the Commander, Naval Air Systems Command (NAVAIR).
    • TDs will be issued following the format and business rules dictated in the applicable appendices of this SOP.

    Technical Directive Types

    • Interim Change TD: issued when a formal ECP is not available, and a draft ITD is submitted along with a completed Change Request Directive package.
    • Formal Change TD: issued to supersede the Interim Change TD after a formal ECP is obtained and reviewed.

    Urgent Action Category

    • Assigned when factors of combat necessity present hazardous conditions that could result in personal injury or damage to valuable property.
    • Requires compliance within specified time limits, typically within 10 flight hours to 36 months.

    Routine Action Category

    • Assigned when the urgency of the situation does not warrant assignment of the Immediate or Urgent Action categories.
    • Used for TDs applicable to a foreign country under an FMS program.

    Technical Directive Code Numbers

    • Table 2-1 lists the TD code numbers and titles, including Power Plant Bulletin, Aircrew System Change, and more.

    Technical Directive Developmental Stages

    • TDs pass through several developmental stages, including preparation, validation, verification, approval, and publication.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Related Documents

    Description

    Learn about the installation and removal process of missionized equipment on an aircraft, including configuration changes and TD requirements. Understand the policies and procedures involved.

    More Like This

    Use Quizgecko on...
    Browser
    Browser