65-100

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

During any 7 consecutive day period, how many consecutive hours should LTP relieve a maintenance person from all duties?

  • 48
  • 24 (correct)
  • 36
  • 12

For EWIS Initial Training, which personnel group performs wiring system inspections?

  • Group 1
  • Group 3
  • Group 2 (correct)
  • Group 4

What term describes parts for which the cost of repair or overhaul exceeds the replacement cost?

  • Minor repair
  • Beyond economical repair (correct)
  • Economically viable repair
  • Standard repair

What type of check is performed to quantitatively verify if an item operates within specific parameters?

<p>Functional check (B)</p> Signup and view all the answers

What type of check qualitatively verifies that a system or component is operating as intended?

<p>Operational check (D)</p> Signup and view all the answers

What method is used to submit proposals for improving maintenance manuals?

<p>Manual change request (C)</p> Signup and view all the answers

What is the main purpose of a Work Turn Over Report Form?

<p>Record incomplete maintenance tasks (C)</p> Signup and view all the answers

Where should you record work turn over details for line maintenance?

<p>F24-008L (C)</p> Signup and view all the answers

According to regulations, when must an Airworthiness Directive (AD) be complied with?

<p>As specified in the AD (C)</p> Signup and view all the answers

What consideration must be taken into account when planning maintenance tasks and organizing shifts?

<p>Human performance limitations (A)</p> Signup and view all the answers

What is the location where LTP is approved to perform Base Maintenance on aircraft?

<p>Manila (B)</p> Signup and view all the answers

If an authorized individual needs to correct an entry on aircraft documents, what action must they take regarding their signature or stamp impression?

<p>Void the original signature or stamp (D)</p> Signup and view all the answers

How often does the JCAB approval to LTP need to be renewed?

<p>Every 3 years (A)</p> Signup and view all the answers

How often does the JCAB Approved Maintenance Certificate need to be renewed?

<p>Every two years (A)</p> Signup and view all the answers

Under JCAB regulations, which classification of work doesn't require an operational test?

<p>Slight Repair (C)</p> Signup and view all the answers

What type of activities are covered under the JCAB approval granted to LTP?

<p>Maintenance and alteration of aircraft (B)</p> Signup and view all the answers

Is LTP part of the LHT group approval for CAAP?

<p>False (B)</p> Signup and view all the answers

Where is the designated location for Base Maintenance activities in LTP?

<p>Manila (C)</p> Signup and view all the answers

In a stamp like '87744A', what does the letter signify?

<p>The number of issued stamp (D)</p> Signup and view all the answers

What documentation should be attached to rejected parts during receiving inspection?

<p>Unserviceable Tag and Receiving Rejection Report (C)</p> Signup and view all the answers

What term is used to describe parts for which the repair cost exceeds the allowable budget?

<p>Beyond Economical Repair (B)</p> Signup and view all the answers

Which manual must be approved for maintenance on aircraft for Korea MOLIT?

<p>AMO Procedure and Quality Control Manual for Korea MOLIT (A)</p> Signup and view all the answers

When should work-done turnover be completed?

<p>Before the end of the shift (B)</p> Signup and view all the answers

Where can the approval number be found on a Germany EASA Certificate?

<p>LBA DE.145.0001 (A)</p> Signup and view all the answers

What type of test is conducted to verify the functionality of a component?

<p>Functional Test (A)</p> Signup and view all the answers

What type of test is conducted to check the operation of a component?

<p>Operational Test (B)</p> Signup and view all the answers

Which manual provides a general overview of the LHT group and its various locations?

<p>IMM (A)</p> Signup and view all the answers

What type of manuals are used for maintaining customer aircraft?

<p>Controlled manuals (B)</p> Signup and view all the answers

What documents are attached to raw and consumable materials?

<p>Certificate of Conformance &amp; Label / Marking of Specification (B)</p> Signup and view all the answers

What type of certificate confirms the compliance of standard parts with specifications?

<p>Certificate of Conformance (C)</p> Signup and view all the answers

What airworthiness certificate is acceptable for used components and repairable parts?

<p>CAAP Form 1 or as required by the Aircraft Carrier (A)</p> Signup and view all the answers

Recurrent training for Human Factors is referenced under what?

<p>SLEX (B), SFAR (C)</p> Signup and view all the answers

What logbook form should be used for base maintenance work turnover?

<p>F39-014L (A)</p> Signup and view all the answers

What should be included in voiding a maintenance document? (Select all that apply)

<p>Initials (A), ID number (B), Date (C)</p> Signup and view all the answers

Flashcards

LTP Rest Requirements

Relieves maintenance personnel from duties for 24 consecutive hours in a 7-day period.

EWIS Group 2

Personnel who perform wiring system inspections.

Beyond Economical Repair (BER)

Parts that cost more to repair/overhaul than to replace.

Functional Check

A check to see if an item is working within its limits.

Signup and view all the flashcards

Operational Check

A check to confirm a system is operating as intended.

Signup and view all the flashcards

Manual Change Request

Used to submit suggestions for improving manuals.

Signup and view all the flashcards

Work Turn Over Report Form

To ensure incomplete tasks are recorded across shift changes.

Signup and view all the flashcards

AD Compliance Time

As specified in the Airworthiness Directive (AD).

Signup and view all the flashcards

Human Performance Limitations

Planning should consider the limitations of human ability.

Signup and view all the flashcards

Recurrent Human Factors Training

An SFAR or SLEX.

Signup and view all the flashcards

LTP Base Maintenance Location

Manila.

Signup and view all the flashcards

Voiding Party

Individual who voids signature or stamp to correct an entry.

Signup and view all the flashcards

JCAB Approval Validity to LTP

3 years

Signup and view all the flashcards

JCAB Work Classification

General preservation, slight repair, minor repair, major repair, minor alteration

Signup and view all the flashcards

JCAB Approval Scope to LTP

Maintenance and alteration of aircraft.

Signup and view all the flashcards

LTP Part of LHT CAAP Approval

False.

Signup and view all the flashcards

Meaning of letter in the stamp

Number of issued stamp.

Signup and view all the flashcards

Parts Reject Attachment

Unserviceable Tag and Receiving Rejection Report.

Signup and view all the flashcards

Out of Budget Repair

Beyond Economical Repair.

Signup and view all the flashcards

Manual for Korea MOLIT approval

AMO Procedure and Quality Control Manual for Korea MOLIT.

Signup and view all the flashcards

Work Done Turn Over

Must be done before the end of the shift / record all the details that cannot complete on the task.

Signup and view all the flashcards

Germany EASA Certificate Approval Number

LBA DE.145.0001

Signup and view all the flashcards

Functionality of Component

Functional Test.

Signup and view all the flashcards

Operation of Component

Operational Test.

Signup and view all the flashcards

LHT Group Overview Manual

IMM.

Signup and view all the flashcards

Manual to Maintain Customer Aircraft

Controlled manuals.

Signup and view all the flashcards

Raw and Consumable Materials

Certificate of Conformance & Label / Marking of Specification.

Signup and view all the flashcards

Standard Parts Specifications

Certificate of Conformance.

Signup and view all the flashcards

Component certificate of airworthiness

CAAP Form 1 or as required by the Aircraft Carrier.

Signup and view all the flashcards

Study Notes

  • LTP must relieve maintenance personnel from all duties for 24 consecutive hours during any 7 consecutive day period.
  • Personnel performing wiring system inspections are classified as Group 2 for EWIS Initial Training.
  • Parts that would exceed the company's acquisition cost limits if repaired/overhauled are considered beyond economical repair.
  • A functional check is a quantitative empirical check to determine if an item's functions perform within specified limits.
  • An operational check is a qualitative check to determine if a system or component operates in its normal and intended manner.
  • Personnel are encouraged to submit proposals to improve manuals using a manual change request.
  • The Work Turn Over Report Form ensures that incomplete maintenance/inspection tasks are recorded and completed before return to service.
  • Use Line Maintenance Work Turn Over Logbook F24-008L for line maintenance, and Base Maintenance Work Turnover Logbook Form F39-014L for base maintenance.
  • An Airworthiness Directive must be complied with as specified in the AD after it becomes effective.
  • The planning of maintenance tasks and organizing of shifts must consider human performance limitations.
  • Recurrent training for Human Factors includes SFAR and SLEX.
  • LTP can perform Base Maintenance in Manila.
  • Any authorized individual can void a signature or stamp impression on aircraft documents to correct or modify an entry.
  • JCAB approval to LTP is valid for 3 years and the JCAB Approved Maintenance Certificate needs to be renewed every two (2) years.
  • Under JCAB, classifications of work that do not require operational tests are: General preservation, slight repair, minor repair, major repair and minor alteration.
  • JCAB approval to LTP covers maintenance and alteration of aircraft.
  • LTP isn't directly part of LHT group approval for CAAP.

Base Maintenance Location

  • Base Maintenance for LTP is located in Manila.

Stamp Meaning

  • The letter in a stamp (e.g., 87744A) indicates the number of the issued stamp.

Rejected Parts

  • Attach an Unserviceable Tag and Receiving Rejection Report to rejected parts in receiving inspection.

Beyond Economical Repair

  • Parts that are too expensive to repair, exceeding budget limits, are classified as Beyond Economical Repair.

Manual Usage

  • The AMO Procedure and Quality Control Manual for Korea MOLIT should be used for Korea MOLIT approval.

Work Turnover

  • Work turnovers must be done before the end of the shift to record all incomplete task details.

Approval Number

  • The approval number on the Germany EASA Certificate is LBA DE.145.0001.

Component Testing

  • A Functional Test is to check the functionality of a component.
  • An Operational Test is to check the operation of a component.

LHT Group Overview

  • The IMM manual provides a general overview of the LHT group and its locations.

Aircraft Maintenance

  • Controlled manuals are used for maintaining customer aircraft.

Material Documentation

  • Raw and consumable materials documents include a Certificate of Conformance & Label / Marking of Specification.

Standard Parts

  • A Certificate of Conformance is used for standard parts specification.

Acceptable Certificates

  • A CAAP Form 1 or as required by the Aircraft Carrier serves as an acceptable certificate of airworthiness for used and repairable parts.

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team
Use Quizgecko on...
Browser
Browser