Podcast
Questions and Answers
During any 7 consecutive day period, how many consecutive hours should LTP relieve a maintenance person from all duties?
During any 7 consecutive day period, how many consecutive hours should LTP relieve a maintenance person from all duties?
- 48
- 24 (correct)
- 36
- 12
For EWIS Initial Training, which personnel group performs wiring system inspections?
For EWIS Initial Training, which personnel group performs wiring system inspections?
- Group 1
- Group 3
- Group 2 (correct)
- Group 4
What term describes parts for which the cost of repair or overhaul exceeds the replacement cost?
What term describes parts for which the cost of repair or overhaul exceeds the replacement cost?
- Minor repair
- Beyond economical repair (correct)
- Economically viable repair
- Standard repair
What type of check is performed to quantitatively verify if an item operates within specific parameters?
What type of check is performed to quantitatively verify if an item operates within specific parameters?
What type of check qualitatively verifies that a system or component is operating as intended?
What type of check qualitatively verifies that a system or component is operating as intended?
What method is used to submit proposals for improving maintenance manuals?
What method is used to submit proposals for improving maintenance manuals?
What is the main purpose of a Work Turn Over Report Form?
What is the main purpose of a Work Turn Over Report Form?
Where should you record work turn over details for line maintenance?
Where should you record work turn over details for line maintenance?
According to regulations, when must an Airworthiness Directive (AD) be complied with?
According to regulations, when must an Airworthiness Directive (AD) be complied with?
What consideration must be taken into account when planning maintenance tasks and organizing shifts?
What consideration must be taken into account when planning maintenance tasks and organizing shifts?
What is the location where LTP is approved to perform Base Maintenance on aircraft?
What is the location where LTP is approved to perform Base Maintenance on aircraft?
If an authorized individual needs to correct an entry on aircraft documents, what action must they take regarding their signature or stamp impression?
If an authorized individual needs to correct an entry on aircraft documents, what action must they take regarding their signature or stamp impression?
How often does the JCAB approval to LTP need to be renewed?
How often does the JCAB approval to LTP need to be renewed?
How often does the JCAB Approved Maintenance Certificate need to be renewed?
How often does the JCAB Approved Maintenance Certificate need to be renewed?
Under JCAB regulations, which classification of work doesn't require an operational test?
Under JCAB regulations, which classification of work doesn't require an operational test?
What type of activities are covered under the JCAB approval granted to LTP?
What type of activities are covered under the JCAB approval granted to LTP?
Is LTP part of the LHT group approval for CAAP?
Is LTP part of the LHT group approval for CAAP?
Where is the designated location for Base Maintenance activities in LTP?
Where is the designated location for Base Maintenance activities in LTP?
In a stamp like '87744A', what does the letter signify?
In a stamp like '87744A', what does the letter signify?
What documentation should be attached to rejected parts during receiving inspection?
What documentation should be attached to rejected parts during receiving inspection?
What term is used to describe parts for which the repair cost exceeds the allowable budget?
What term is used to describe parts for which the repair cost exceeds the allowable budget?
Which manual must be approved for maintenance on aircraft for Korea MOLIT?
Which manual must be approved for maintenance on aircraft for Korea MOLIT?
When should work-done turnover be completed?
When should work-done turnover be completed?
Where can the approval number be found on a Germany EASA Certificate?
Where can the approval number be found on a Germany EASA Certificate?
What type of test is conducted to verify the functionality of a component?
What type of test is conducted to verify the functionality of a component?
What type of test is conducted to check the operation of a component?
What type of test is conducted to check the operation of a component?
Which manual provides a general overview of the LHT group and its various locations?
Which manual provides a general overview of the LHT group and its various locations?
What type of manuals are used for maintaining customer aircraft?
What type of manuals are used for maintaining customer aircraft?
What documents are attached to raw and consumable materials?
What documents are attached to raw and consumable materials?
What type of certificate confirms the compliance of standard parts with specifications?
What type of certificate confirms the compliance of standard parts with specifications?
What airworthiness certificate is acceptable for used components and repairable parts?
What airworthiness certificate is acceptable for used components and repairable parts?
Recurrent training for Human Factors is referenced under what?
Recurrent training for Human Factors is referenced under what?
What logbook form should be used for base maintenance work turnover?
What logbook form should be used for base maintenance work turnover?
What should be included in voiding a maintenance document? (Select all that apply)
What should be included in voiding a maintenance document? (Select all that apply)
Flashcards
LTP Rest Requirements
LTP Rest Requirements
Relieves maintenance personnel from duties for 24 consecutive hours in a 7-day period.
EWIS Group 2
EWIS Group 2
Personnel who perform wiring system inspections.
Beyond Economical Repair (BER)
Beyond Economical Repair (BER)
Parts that cost more to repair/overhaul than to replace.
Functional Check
Functional Check
Signup and view all the flashcards
Operational Check
Operational Check
Signup and view all the flashcards
Manual Change Request
Manual Change Request
Signup and view all the flashcards
Work Turn Over Report Form
Work Turn Over Report Form
Signup and view all the flashcards
AD Compliance Time
AD Compliance Time
Signup and view all the flashcards
Human Performance Limitations
Human Performance Limitations
Signup and view all the flashcards
Recurrent Human Factors Training
Recurrent Human Factors Training
Signup and view all the flashcards
LTP Base Maintenance Location
LTP Base Maintenance Location
Signup and view all the flashcards
Voiding Party
Voiding Party
Signup and view all the flashcards
JCAB Approval Validity to LTP
JCAB Approval Validity to LTP
Signup and view all the flashcards
JCAB Work Classification
JCAB Work Classification
Signup and view all the flashcards
JCAB Approval Scope to LTP
JCAB Approval Scope to LTP
Signup and view all the flashcards
LTP Part of LHT CAAP Approval
LTP Part of LHT CAAP Approval
Signup and view all the flashcards
Meaning of letter in the stamp
Meaning of letter in the stamp
Signup and view all the flashcards
Parts Reject Attachment
Parts Reject Attachment
Signup and view all the flashcards
Out of Budget Repair
Out of Budget Repair
Signup and view all the flashcards
Manual for Korea MOLIT approval
Manual for Korea MOLIT approval
Signup and view all the flashcards
Work Done Turn Over
Work Done Turn Over
Signup and view all the flashcards
Germany EASA Certificate Approval Number
Germany EASA Certificate Approval Number
Signup and view all the flashcards
Functionality of Component
Functionality of Component
Signup and view all the flashcards
Operation of Component
Operation of Component
Signup and view all the flashcards
LHT Group Overview Manual
LHT Group Overview Manual
Signup and view all the flashcards
Manual to Maintain Customer Aircraft
Manual to Maintain Customer Aircraft
Signup and view all the flashcards
Raw and Consumable Materials
Raw and Consumable Materials
Signup and view all the flashcards
Standard Parts Specifications
Standard Parts Specifications
Signup and view all the flashcards
Component certificate of airworthiness
Component certificate of airworthiness
Signup and view all the flashcards
Study Notes
- LTP must relieve maintenance personnel from all duties for 24 consecutive hours during any 7 consecutive day period.
- Personnel performing wiring system inspections are classified as Group 2 for EWIS Initial Training.
- Parts that would exceed the company's acquisition cost limits if repaired/overhauled are considered beyond economical repair.
- A functional check is a quantitative empirical check to determine if an item's functions perform within specified limits.
- An operational check is a qualitative check to determine if a system or component operates in its normal and intended manner.
- Personnel are encouraged to submit proposals to improve manuals using a manual change request.
- The Work Turn Over Report Form ensures that incomplete maintenance/inspection tasks are recorded and completed before return to service.
- Use Line Maintenance Work Turn Over Logbook F24-008L for line maintenance, and Base Maintenance Work Turnover Logbook Form F39-014L for base maintenance.
- An Airworthiness Directive must be complied with as specified in the AD after it becomes effective.
- The planning of maintenance tasks and organizing of shifts must consider human performance limitations.
- Recurrent training for Human Factors includes SFAR and SLEX.
- LTP can perform Base Maintenance in Manila.
- Any authorized individual can void a signature or stamp impression on aircraft documents to correct or modify an entry.
- JCAB approval to LTP is valid for 3 years and the JCAB Approved Maintenance Certificate needs to be renewed every two (2) years.
- Under JCAB, classifications of work that do not require operational tests are: General preservation, slight repair, minor repair, major repair and minor alteration.
- JCAB approval to LTP covers maintenance and alteration of aircraft.
- LTP isn't directly part of LHT group approval for CAAP.
Base Maintenance Location
- Base Maintenance for LTP is located in Manila.
Stamp Meaning
- The letter in a stamp (e.g., 87744A) indicates the number of the issued stamp.
Rejected Parts
- Attach an Unserviceable Tag and Receiving Rejection Report to rejected parts in receiving inspection.
Beyond Economical Repair
- Parts that are too expensive to repair, exceeding budget limits, are classified as Beyond Economical Repair.
Manual Usage
- The AMO Procedure and Quality Control Manual for Korea MOLIT should be used for Korea MOLIT approval.
Work Turnover
- Work turnovers must be done before the end of the shift to record all incomplete task details.
Approval Number
- The approval number on the Germany EASA Certificate is LBA DE.145.0001.
Component Testing
- A Functional Test is to check the functionality of a component.
- An Operational Test is to check the operation of a component.
LHT Group Overview
- The IMM manual provides a general overview of the LHT group and its locations.
Aircraft Maintenance
- Controlled manuals are used for maintaining customer aircraft.
Material Documentation
- Raw and consumable materials documents include a Certificate of Conformance & Label / Marking of Specification.
Standard Parts
- A Certificate of Conformance is used for standard parts specification.
Acceptable Certificates
- A CAAP Form 1 or as required by the Aircraft Carrier serves as an acceptable certificate of airworthiness for used and repairable parts.
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.