Podcast
Questions and Answers
Which of the following components is NOT involved in checking the APU fire detection and extinguishing system?
Which of the following components is NOT involved in checking the APU fire detection and extinguishing system?
The APU MASTER SW pb-sw should be set to ON before the APU START pb-sw for optimal APU performance.
The APU MASTER SW pb-sw should be set to ON before the APU START pb-sw for optimal APU performance.
True
What should the flight crew do if batteries are the only power source?
What should the flight crew do if batteries are the only power source?
They should turn on the APU pb on the ECAM control panel.
In cold weather conditions, the flight crew may observe a bleed pressure up to _____ PSI on the APU SD page.
In cold weather conditions, the flight crew may observe a bleed pressure up to _____ PSI on the APU SD page.
Signup and view all the answers
Match the following APU components with their functions:
Match the following APU components with their functions:
Signup and view all the answers
What is the responsibility of the Pilot in Command regarding gear pins?
What is the responsibility of the Pilot in Command regarding gear pins?
Signup and view all the answers
To ensure battery voltage is above 50%, BAT 1 and BAT 2 should both show a voltage of above 25.5 V.
To ensure battery voltage is above 50%, BAT 1 and BAT 2 should both show a voltage of above 25.5 V.
Signup and view all the answers
What should the selection be set to after checking the battery voltages?
What should the selection be set to after checking the battery voltages?
Signup and view all the answers
The Pilot in Command (PIC) must ensure the correct number of _______ are stowed onboard.
The Pilot in Command (PIC) must ensure the correct number of _______ are stowed onboard.
Signup and view all the answers
Match the components with their respective actions:
Match the components with their respective actions:
Signup and view all the answers
What should be done if the battery voltage is at or below 25.5 V?
What should be done if the battery voltage is at or below 25.5 V?
Signup and view all the answers
If the battery voltage is above 25.5 V, no checks are needed on BAT 1 and BAT 2.
If the battery voltage is above 25.5 V, no checks are needed on BAT 1 and BAT 2.
Signup and view all the answers
What should be done if the AVAIL light is on?
What should be done if the AVAIL light is on?
Signup and view all the answers
If the aircraft has been electrically supplied during the last 6 hours, the battery voltages should be above ______ V.
If the aircraft has been electrically supplied during the last 6 hours, the battery voltages should be above ______ V.
Signup and view all the answers
Match the battery voltage conditions with their required actions:
Match the battery voltage conditions with their required actions:
Signup and view all the answers
What happens if the aircraft is supplied only by batteries for 5 minutes?
What happens if the aircraft is supplied only by batteries for 5 minutes?
Signup and view all the answers
The simultaneous use of EXT PWR B and APU GEN is possible.
The simultaneous use of EXT PWR B and APU GEN is possible.
Signup and view all the answers
What is the action required if the EXT PWR does not come on during operation?
What is the action required if the EXT PWR does not come on during operation?
Signup and view all the answers
Study Notes
Battery Voltage Procedures
- If the battery voltage is at or below 25.5 V, a charging cycle of about 20 min is required.
- Check BAT 1 pb-sw, BAT 2 pb-sw and APU BAT pb-sw.
- Check on ELEC DC SD page, battery contactors closed and batteries charging.
- After 20 min: Check BAT 1 pb-sw, BAT 2 pb-sw and APU BAT pb-sw.
- After the check, the selector should remain on the APU position.
Battery Voltage Above 25.5 V
- If the battery voltage is above 25.5 V:
- Check BAT 1 pb-sw, BAT 2 pb-sw and APU BAT pb-sw
- After the check, the selector should remain on the APU position.
Aircraft Supplied by Batteries Only
- If the aircraft has been electrically supplied by batteries only during the last 6 hrs:
- In case of APU start on battery only, perform the following check:
- Check BAT 1 pb-sw, BAT 2 pb-sw and APU BAT.
Avail Light is On
- If the Avail light is on:
- If only one electrical power is available, ground personnel should connect EXT PWR A since EXT PWR B does not permit to supply directly GND/FLT buses without energizing the total network.
- The simultaneous use of EXT PWR B and APU GEN is not possible.
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.
Description
This quiz covers essential procedures for monitoring and managing aircraft battery voltage levels. It includes steps for charging, checking battery switches, and handling situations involving aircraft operated solely on battery power. Familiarize yourself with these procedures to ensure aircraft safety and operational efficiency.