Podcast
Questions and Answers
Which of the following components is NOT involved in checking the APU fire detection and extinguishing system?
Which of the following components is NOT involved in checking the APU fire detection and extinguishing system?
- APU FIRE pb-sw
- MASTER WARN light
- ECAM
- APU START pb-sw (correct)
The APU MASTER SW pb-sw should be set to ON before the APU START pb-sw for optimal APU performance.
The APU MASTER SW pb-sw should be set to ON before the APU START pb-sw for optimal APU performance.
True (A)
What should the flight crew do if batteries are the only power source?
What should the flight crew do if batteries are the only power source?
They should turn on the APU pb on the ECAM control panel.
In cold weather conditions, the flight crew may observe a bleed pressure up to _____ PSI on the APU SD page.
In cold weather conditions, the flight crew may observe a bleed pressure up to _____ PSI on the APU SD page.
Match the following APU components with their functions:
Match the following APU components with their functions:
What is the responsibility of the Pilot in Command regarding gear pins?
What is the responsibility of the Pilot in Command regarding gear pins?
To ensure battery voltage is above 50%, BAT 1 and BAT 2 should both show a voltage of above 25.5 V.
To ensure battery voltage is above 50%, BAT 1 and BAT 2 should both show a voltage of above 25.5 V.
What should the selection be set to after checking the battery voltages?
What should the selection be set to after checking the battery voltages?
The Pilot in Command (PIC) must ensure the correct number of _______ are stowed onboard.
The Pilot in Command (PIC) must ensure the correct number of _______ are stowed onboard.
Match the components with their respective actions:
Match the components with their respective actions:
What should be done if the battery voltage is at or below 25.5 V?
What should be done if the battery voltage is at or below 25.5 V?
If the battery voltage is above 25.5 V, no checks are needed on BAT 1 and BAT 2.
If the battery voltage is above 25.5 V, no checks are needed on BAT 1 and BAT 2.
What should be done if the AVAIL light is on?
What should be done if the AVAIL light is on?
If the aircraft has been electrically supplied during the last 6 hours, the battery voltages should be above ______ V.
If the aircraft has been electrically supplied during the last 6 hours, the battery voltages should be above ______ V.
Match the battery voltage conditions with their required actions:
Match the battery voltage conditions with their required actions:
What happens if the aircraft is supplied only by batteries for 5 minutes?
What happens if the aircraft is supplied only by batteries for 5 minutes?
The simultaneous use of EXT PWR B and APU GEN is possible.
The simultaneous use of EXT PWR B and APU GEN is possible.
What is the action required if the EXT PWR does not come on during operation?
What is the action required if the EXT PWR does not come on during operation?
Flashcards
APU Fire Test
APU Fire Test
A procedure to verify the APU fire detection and extinguishing system's functionality.
APU Fire Warning
APU Fire Warning
Indication of detected APU fire, appearing on ECAM, CRC, MASTER WARN, and APU FIRE pushbutton switch(pb-sw).
APU Start pb-sw
APU Start pb-sw
Pushbutton switch to initiate APU start-up.
APU Master SW pb-sw
APU Master SW pb-sw
Signup and view all the flashcards
APU Fuel Feed Line Pressurization
APU Fuel Feed Line Pressurization
Signup and view all the flashcards
APU Start Performance
APU Start Performance
Signup and view all the flashcards
Cold Weather APU Operation
Cold Weather APU Operation
Signup and view all the flashcards
APU Start Limitations
APU Start Limitations
Signup and view all the flashcards
APU Controls and Indicators
APU Controls and Indicators
Signup and view all the flashcards
Low Battery Voltage (<25.5V)
Low Battery Voltage (<25.5V)
Signup and view all the flashcards
Gear Pins Check
Gear Pins Check
Signup and view all the flashcards
Engine Masters Lever Check
Engine Masters Lever Check
Signup and view all the flashcards
Charging Cycle
Charging Cycle
Signup and view all the flashcards
Voltage Check Points
Voltage Check Points
Signup and view all the flashcards
Engine Start Selector Check
Engine Start Selector Check
Signup and view all the flashcards
Weather Radar Checks
Weather Radar Checks
Signup and view all the flashcards
High Battery Voltage (>25.5V)
High Battery Voltage (>25.5V)
Signup and view all the flashcards
Aircraft Supplied by Batteries
Aircraft Supplied by Batteries
Signup and view all the flashcards
Landing Gear Lever Check
Landing Gear Lever Check
Signup and view all the flashcards
Wiper Selector Check
Wiper Selector Check
Signup and view all the flashcards
6 Hours Electrical Power
6 Hours Electrical Power
Signup and view all the flashcards
Battery Check (6+ hours)
Battery Check (6+ hours)
Signup and view all the flashcards
Voltage Threshold Check
Voltage Threshold Check
Signup and view all the flashcards
AVAIL Light On
AVAIL Light On
Signup and view all the flashcards
EXT PWR Connection
EXT PWR Connection
Signup and view all the flashcards
EXT PWR A
EXT PWR A
Signup and view all the flashcards
EXT PWR B
EXT PWR B
Signup and view all the flashcards
Simultaneous EXT PWR and APU GEN
Simultaneous EXT PWR and APU GEN
Signup and view all the flashcards
GPCU Protection Trip
GPCU Protection Trip
Signup and view all the flashcards
Study Notes
Battery Voltage Procedures
- If the battery voltage is at or below 25.5 V, a charging cycle of about 20 min is required.
- Check BAT 1 pb-sw, BAT 2 pb-sw and APU BAT pb-sw.
- Check on ELEC DC SD page, battery contactors closed and batteries charging.
- After 20 min: Check BAT 1 pb-sw, BAT 2 pb-sw and APU BAT pb-sw.
- After the check, the selector should remain on the APU position.
Battery Voltage Above 25.5 V
- If the battery voltage is above 25.5 V:
- Check BAT 1 pb-sw, BAT 2 pb-sw and APU BAT pb-sw
- After the check, the selector should remain on the APU position.
Aircraft Supplied by Batteries Only
- If the aircraft has been electrically supplied by batteries only during the last 6 hrs:
- In case of APU start on battery only, perform the following check:
- Check BAT 1 pb-sw, BAT 2 pb-sw and APU BAT.
Avail Light is On
- If the Avail light is on:
- If only one electrical power is available, ground personnel should connect EXT PWR A since EXT PWR B does not permit to supply directly GND/FLT buses without energizing the total network.
- The simultaneous use of EXT PWR B and APU GEN is not possible.
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.