What is the minimum information that should be included on a milestone board?
What is the minimum information that should be included on a milestone board?
- Date Cards (by week (correct)
- Critical Milestone swim lane
- Master Schedule swim lane
- Milestone cards with standard colors
What is an example of a way to vary the design of the milestone board?
What is an example of a way to vary the design of the milestone board?
- Adding multiple critical milestone swim lanes
- Adding a swim lane for construction activities
- Making the board a valuable tool
- Varying the design to meet the unique needs of the project (correct)
What should teams NOT do when designing the milestone board?
What should teams NOT do when designing the milestone board?
- Feel free to vary the design
- Make it a valuable tool
- Use "all of the above" or "none of the above" choices (correct)
- Add multiple critical milestone swim lanes