Questions and Answers
Which act outlines the fixation of monuments of permanent nature in the Philippine Geodetic Engineering?
Which act outlines the fixation of monuments of permanent nature in the Philippine Geodetic Engineering?
According to DAO No. 2007-29, control surveys are defined and classified into which types?
According to DAO No. 2007-29, control surveys are defined and classified into which types?
Who is responsible for issuing the Survey Order as defined in DAO No. 2007-29?
Who is responsible for issuing the Survey Order as defined in DAO No. 2007-29?
What is the primary purpose of conducting control surveys as per DAO No. 2007-29?
What is the primary purpose of conducting control surveys as per DAO No. 2007-29?
Signup and view all the answers
Which of the following is NOT a type of control survey as classified in DAO No. 2007-29?
Which of the following is NOT a type of control survey as classified in DAO No. 2007-29?
Signup and view all the answers
As stated in DAO No. 2007-29, control surveys are important for which of the following reasons?
As stated in DAO No. 2007-29, control surveys are important for which of the following reasons?
Signup and view all the answers
In the context of Philippine Geodetic Engineering, which of the following acts is amended by RA 8570?
In the context of Philippine Geodetic Engineering, which of the following acts is amended by RA 8570?
Signup and view all the answers
What document is required to be transmitted to the Administrator as per DAO No. 2007-29?
What document is required to be transmitted to the Administrator as per DAO No. 2007-29?
Signup and view all the answers
What activity should be proposed if NAMRIA has no available data for the area?
What activity should be proposed if NAMRIA has no available data for the area?
Signup and view all the answers
Which office is notified about the survey through the Provincial Engineer's Office?
Which office is notified about the survey through the Provincial Engineer's Office?
Signup and view all the answers
The individual status of reference points is a part of which inventory?
The individual status of reference points is a part of which inventory?
Signup and view all the answers
What coordinate systems must the Geographic Position and Plane Coordinates be determined in?
What coordinate systems must the Geographic Position and Plane Coordinates be determined in?
Signup and view all the answers
Which of the following is NOT a type of measurement activity proposed?
Which of the following is NOT a type of measurement activity proposed?
Signup and view all the answers
Which office is responsible for notifying about survey concerns according to the description?
Which office is responsible for notifying about survey concerns according to the description?
Signup and view all the answers
In the context of surveying, stable reference points must be researched and evaluated within what type of network?
In the context of surveying, stable reference points must be researched and evaluated within what type of network?
Signup and view all the answers
What are the Plane Coordinates referred to in the project area research?
What are the Plane Coordinates referred to in the project area research?
Signup and view all the answers
Which aspect should be avoided in the network design?
Which aspect should be avoided in the network design?
Signup and view all the answers
Which of the following features pertaining to the project area is most relevant in network design?
Which of the following features pertaining to the project area is most relevant in network design?
Signup and view all the answers
Where should the survey in network design begin and end?
Where should the survey in network design begin and end?
Signup and view all the answers
What is a critical element to consider for ensuring correctness in survey results?
What is a critical element to consider for ensuring correctness in survey results?
Signup and view all the answers
What type of controls are evaluated for their availability in the network design?
What type of controls are evaluated for their availability in the network design?
Signup and view all the answers
In the context of Network Design, which line is imperative for checking purposes?
In the context of Network Design, which line is imperative for checking purposes?
Signup and view all the answers
What serves as guidance in the conduct of actual ground surveys?
What serves as guidance in the conduct of actual ground surveys?
Signup and view all the answers
Which of the following is NOT considered in the Network Design?
Which of the following is NOT considered in the Network Design?
Signup and view all the answers
Study Notes
Philippine Geodetic Engineering Act
- Control surveys fixed on the earth’s surface are governed by the Philippine Geodetic Engineering Act of 1998.
- Relevant Republic Acts include RA 8570, RA 8590, RA 8560, and RA 8550, addressing different survey types such as Topographic, Control, Consolidation, and Subdivision Surveys.
Survey Orders and Classifications
- Control surveys are classified into Geodetic and Cadastral, Geodetic and Public Land, Geodetic and Project, and Geodetic and Geographic as per DAO No. 2007-29.
- The survey orders are issued by NAMRIA (National Mapping and Resource Information Authority).
Network Design Considerations
- Network design for a project site must include a plot of controls and be compliant with Section 5.b of DMC 2010-13.
- It should encompass recovered and new control points to guide ground surveys.
Terrain and Features
- In network design, consider terrain and physiographic features which influence survey execution.
- Specific features such as physical geography and existing geodetic controls must be examined.
Established Control Points
- Surveys begin and end at established PRS 92 control points to ensure accuracy, focusing on baseline, tie line, and known lines for geometrical checks.
Technical Planning and Notification
- Technical plans for geodetic measurement activities are essential if NAMRIA lacks data for the area.
- Notifications regarding surveys should be sent to relevant provincial offices including the Provincial Engineer and District Engineer’s Office.
Inventory of Reference Points
- Conduct thorough research on the status of existing geodetic control and project control networks within the project area.
- Geographic Position and Plane Coordinates for these points should be verified using Local and Philippine Plane Coordinate Systems.
Importance of Data Verification
- Only reestablished and stable control points should be utilized, ensuring accurate measurements and data reliability.
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.
Related Documents
Description
This quiz features 200 practice problems designed for the DMC course between 2010 and 2013, specifically tailored for BS Geodetic Engineering students at Bicol University. It's a great resource for exam preparation and self-assessment in geodetic engineering principles.