CS605 Software Engineering II - Solved MCQs - July 2013 PDF
Document Details
VUI
2013
VUI
Moaaz Siddiq
Tags
Related
Summary
This document is a past paper for the CS605 Software Engineering II course, from July 2013. It consists of multiple-choice questions (MCQs) on various software engineering topics, designed for an undergraduate course at VUI. The paper contains solved MCQs with links to relevant page numbers for context.
Full Transcript
CS605- Software Engineering II Solved MCQS July 10,2013 From Final term Papers MC100401285 [email protected] Mc100401285@gm...
CS605- Software Engineering II Solved MCQS July 10,2013 From Final term Papers MC100401285 [email protected] [email protected] PSMD01 FINALTERM EXAMINATION Spring 2011 CS605- Software Engineering II (Session - 1) Question No: 1 ( Marks: 1 ) - Please choose one A law affirming that to continue after a certain level of performance has been reached will result in a decline in effectiveness. This law is know as __________________ ► Law of Diminishing returns click here for detail ► Law of effectiveness ► Law of Saturation ► Law of Marketing returns Question No: 2 ( Marks: 1 ) - Please choose one __________ is not the construction part of software development activities. ► Requirement gathering ► Testing ► Configuration Management (Page 8) ► Coding Question No: 3 ( Marks: 1 ) - Please choose one Basic project management process are established at _________ level of CMM ► Chaotic ► Initial ► Level 1 ► Repeatable (Page 12) 1 Question No: 4 ( Marks: 1 ) - Please choose one The projects usually don’t fail due to ► ambiguous/incomplete requirements ► changing customer requirements ► the fact that company was not CMM certified (Page 28 - 29) ► failure in project management Question No: 5 ( Marks: 1 ) - Please choose one ___________________is a team organization where there is no permanent leader and task coordinators are appointed for short duration. Decisions on problems and approach are made by group consensus and communication among team is horizontal. ► Democratic decentralized (DD) (Page 32) ► Controlled decentralized (CD) ► Synchronous paradigm (SP) ► Controlled centralized (CC) Question No: 6 ( Marks: 1 ) - Please choose one Which of these is not a valid reason for measuring software processes, products, and resources? ► to price them Click here for detail ► to improve them ► to characterize them ► to evaluate them Question No: 7 ( Marks: 1 ) - Please choose one Integrity can be measured by the following formula ► integrity= (1-threat) x (1-security) ► integrity= ∑ (1+threat) + (1-security) ► integrity= ∑[(1-threat) x (1-security)] (Page 69) ► integrity= ∑ (1-threat) - (1-security) Question No: 8 ( Marks: 1 ) - Please choose one The rapid application development model is ► Another name for component-based development. ► A useful approach when a customer cannot define requirements clearly ► A high speed adaptation of the linear sequential model. (Page 19) ► All of the given 2 Question No: 9 ( Marks: 1 ) - Please choose one An _______________is a user identifiable group of logically related data or control information maintained within the boundary of the application ► Internal logical file (ILF) (Page 42) ► External Interface file (EIF) ► External input ► External Query Question No: 10 ( Marks: 1 ) - Please choose one When more than one user interpret the same requirement in different ways then we can say that the requirements are None of the given Incomplete Ambiguous Click here for detail Incorrect Question No: 11 ( Marks: 1 ) - Please choose one Testing and Software Quality Assurance activities are exactly similar activities with different names True False (Page 69) Question No: 12 ( Marks: 1 ) - Please choose one If an error related to requirements is identified in testing phase, so this error will be considered as an error in ___________ phase. ► Design ► Code ► Requirement ► Testing Question No: 13 ( Marks: 1 ) - Please choose one Usually the performance of the organization change over-night. ► True ► False Click here for detail 3 Question No: 14 ( Marks: 1 ) - Please choose one Following are the implicit requirement(s) of software? ► Efficiency ► Ease of use ► Maintainability ► All of the given (Page 106) Question No: 15 ( Marks: 1 ) - Please choose one If an error related to requirements is identified in Coding, so this error will be considered as an error in ___________ phase. ► Design ► Code ► Requirement ► Testing Question No: 16 ( Marks: 1 ) - Please choose one While developing the software if the bug is caught then it is termed as ► Error ► Defect (not sure) ► Fault ► Mistake Question No: 17 ( Marks: 1 ) - Please choose one Following are the types of Formal Technical Reviews except ► Inspection ► JAD (Page 110) ► Walkthrough Question No: 18 ( Marks: 1 ) - Please choose one The Review participants should not focus on ► Work product ► Weaknesses of the developer (Page 113) ► Time lines ► Review agenda 4 Question No: 19 ( Marks: 1 ) - Please choose one Review meeting is attended by the following except ► Review leader ► All reviewers ► CEO (Page 112) ► Product Producer Question No: 20 ( Marks: 1 ) - Please choose one Which statement is true in the light of Pareto principle? ► 80% of defects are caused by 20 % of mistakes (Page 114) ► 20% of defects are caused by 80 % of mistakes Question No: 21 ( Marks: 1 ) - Please choose one Reliability and Safety are same concepts with respect to software quality ► True (Page 117) ► False Question No: 22 ( Marks: 1 ) - Please choose one The prevention of defects being injected into the software can help in decreasing the cost of software. True False Question No: 23 ( Marks: 1 ) - Please choose one Poka Yoke is the name of a ► Japanese dish ► QA technique (Page 118) ► Idiom ► None of the given Question No: 24 ( Marks: 1 ) - Please choose one If a new version of a product is released by fixing the bugs in the previous release then it is termed as ___ ► Product Update (Page 122) ► Product Upgrade ► Defect Removal ► Product Performance 5 Question No: 25 ( Marks: 1 ) - Please choose one The Evolution Graph signifies the ► version relationship (SE-PRESSMAN, page 260) ► baseline of a particular release ► change control activity ► all of the given Question No: 26 ( Marks: 1 ) - Please choose one In the software development life cycle, soon the defect is detected will results in increase in cost of software decrease in software cost both a and b are correct Question No: 27 ( Marks: 1 ) - Please choose one __________ testing verifies the correct implementation of internal units, structures and relationship among them. Black box White box click here for details Gray box Question No: 28 ( Marks: 1 ) - Please choose one The template for organizing SRS given by American Department of Defense and NASA should be used for ► none of the given ► large and complex projects ► small project ► medium size projects Question No: 29 ( Marks: 1 ) - Please choose one If you know the relationship between the use cases, classes, GUIs, Test cases and other artifacts then we can say thatrequirements are traceable in that project. ► True ► False (Page 133) 6 Question No: 30 ( Marks: 1 ) - Please choose one There may be one or more GUIs that are part of any good software but may not satisfy any requirement ► True ► False Question No: 31 ( Marks: 1 ) - Please choose one Following are the components of a Legacy system except: ► business processes ► system hardware ► marketing (Page 134) ► application software Question No: 32 ( Marks: 1 ) - Please choose one There are many reasons for which the legacy system become difficult to maintain EXCEPT ► Language in which system was developed become obsolete ► lack of consistency as different parts of the system have been developed by different teams ► None of these ► No documentation is available (Page 134) Question No: 33 ( Marks: 1 ) - Please choose one In ______________, new user and technology requirement can also be integrated into the re-engineering effort. ► Backward re-engineering ► Forward re-engineering (Page 140) ► Business Engineering ► Business Process Engineering Question No: 34 ( Marks: 1 ) - Please choose one Large classes reduces ► Cohesion (Page 143) ► Coupling ► Consistency ► Chains Question No: 35 ( Marks: 1 ) - Please choose one Level _________ is the lowest capability level of CMMI in Continuous representation ►1 ► 0 (Page 169) ►5 ►6 7 Question No: 36 ( Marks: 1 ) - Please choose one In ___________ representation of CMMI model, consideration is given to improve selected processes areas. ► Staged (Page 169) ► Continuous Question No: 37 ( Marks: 1 ) - Please choose one Empirical models are statistical models and are based upon historic data True (Page 81) False Question No: 38 ( Marks: 1 ) - Please choose one Error tracking provides a quantitative means of assessing the quality of the individuals implementing a software product. ► True ► False Question No: 39 ( Marks: 1 ) - Please choose one There are tools available in the market for project tracking. These tools can automatically track and manage the project replacing the need of any human being as a Project Manager. ► True ► False Question No: 40 ( Marks: 1 ) - Please choose one Two tools for computing critical path and project completion times from activity networks are ► CPM and PERT (Page 100) ► DRE and SQA ► FP and LOC ► ASD and BSD 8 FINALTERM EXAMINATION Spring 2010 CS605- Software Engineering II (Session - 1) Question No: 1 ( Marks: 1 ) - Please choose one In order to measure the design quality, if the frequency of ripple defects is too large, then it means that there is tight coupling and hence the ► design is maintainable ► design is not maintainable (Page 79) ► design has completed ► none of the given Question No: 2 ( Marks: 1 ) - Please choose one In _________________, there is both vertical and horizontal communication. Controlled decentralized (CD) Page 32 Democratic decentralized (DD) Controlled centralized (CC) Synchronous paradigm (SP) Question No: 3 ( Marks: 1 ) - Please choose one The only reason for an estimate to be unreliable is lack of experience related to the application on the part of the estimator. ► true ► false click here for detail Question No: 4 ( Marks: 1 ) - Please choose one A consideration of software scope must include an evaluation of all external interfaces. ► true (Page 80) ► false Question No: 5 ( Marks: 1 ) - Please choose one Software quality is conformance to _____________ Explicitly stated functional and non functionasl requirements (Page 106) Explicitly documented developement standrads Implicit characteristics that all the professional software are expectd to have All of the given options 9 Question No: 6 ( Marks: 1 ) - Please choose one The boundary time defines the following parameter(s) for a project the latest time for task initastion before the minimum project completion time is delayed The earliest finish The latest finish All of the given options (Page 100) Question No: 7 ( Marks: 1 ) - Please choose one Quality is the compliance of software to implicit and explicit quality factors. Identify the explicit requirement from the following: ► Maintainability ► Compliance with CMMI (Page 106) ► Ease of use ► Efficiency Question No: 8 ( Marks: 1 ) - Please choose one Following are the benefits of conducting review except ► Help in finding the size of the project ► Helps in verifying the quality of product ► Help in identifying where improvement is required. ► Helps in identifying the bugs in the work product Question No: 9 ( Marks: 1 ) - Please choose one Mean Time To Repair (MTTR) is the ► Time when system remained unable for usage ► Time taken to fix the error ► Time taken to repair the software (Page 116) ► All of the given options are correct. Question No: 10 ( Marks: 1 ) - Please choose one In order to use the Pert and CPM, which one of the following is not required? Decomposition of tasks - also known as the work breakdown structure (WBS) Teams communication mode detail (Page 100) Estimation of effort inter dependencies 10 Question No: 11 ( Marks: 1 ) - Please choose one SCM is the requirement of the ________ level(s) of CMM ► First ► Second and later ► Third and later ► Only Second (Page 119) Question No: 12 ( Marks: 1 ) - Please choose one We can include following items during configuration item identification: ► User Manuals and Documentations ► Source Code ► Software Requirement Specifications ► All of the given choices are correct (Page 120) Question No: 13 ( Marks: 1 ) - Please choose one CPM stands for critical project Measure Critical Path Method (page 100) Common Project Measure Critical Planning Model Question No: 14 ( Marks: 1 ) - Please choose one Software re-factoring is a process in which External behavior of the system does not change Internal behavior of the system does not change Design of the software changes Architecture of the software changes Click here for detail Question No: 15 ( Marks: 1 ) - Please choose one The Change Control Authority does not have the rights to permit to bring the change in the software ► True ► False (Page 124) Question No: 16 ( Marks: 1 ) - Please choose one Check in and check out is actually one and the same process with two different names ► True ► False (Page 124) 11 Question No: 17 ( Marks: 1 ) - Please choose one There could be multiple GUIs to satisfy one requirement ► True (Page 37) ► False Question No: 18 ( Marks: 1 ) - Please choose one _____________ is the process of Design recovery. At this stage the documentation of the overall functionality is created. ► Database Engineering ► Reverse Engineering (Page 139) ► Refactoring ► Forward Engineering Question No: 19 ( Marks: 1 ) - Please choose one In code restructuring, we do not change the functionality of the code ► True (Page 139) ► False Question No: 20 ( Marks: 1 ) - Please choose one Earned Value Analysis (EVA) is a ______ technique for assessing the progress of a project. Select correct option: Qualitative Quantitative (page 102) Subjective None of the given options Question No: 21 ( Marks: 1 ) - Please choose one A _____________process is ―a set of logically related tasks performed to achieve a defined business outcome‖. ► Business (Page 141) ► Software ► CMM ► ISO Question No: 22 ( Marks: 1 ) - Please choose one Software Refactoring is a process in which ► External behavior of the system does not change (Page 142) ► Internal behavior of the system does not change ► Design of the software changes ► Architecture of the software changes 12 Question No: 23 ( Marks: 1 ) - Please choose one The formal methods model of software development makes use of mathematical methods to ► define the specification for computer-based systems ► all of the given click here for detail ► develop defect free computer-based systems ► verify the correctness of computer-based systems Question No: 24 ( Marks: 1 ) - Please choose one Which one of the following describes the data and control to be processed, function, performance, constraints, interfaces, and reliability? ► Product Quality ► Software scope estimation (Page 80) ► Resources requirements ► Time requirements Question No: 25 ( Marks: 1 ) - Please choose one A significant SQA plan, among others, should include: Select correct option: Resources required for project (Page 177) Error tracking procedures Phases required in application development process None of the given options Question No: 26 ( Marks: 1 ) - Please choose one The software plan is not a static document, it is frequently adjusted to make the project appear on track to meet all deadlines and quality targets. ► True Click here for detail ► False Question No: 27 ( Marks: 1 ) - Please choose one The projects are classified into following categories except ► New application development ► Reengineering projects ► Concept development projects ► Marketing Development Projects (Page 96) Question No: 28 ( Marks: 1 ) - Please choose one The processes at ———– is focus on continually improving process performance through both incremental and innovative technological changes/improvements. 13 ► Level 5 Click here for detail ► Level 1 ► Level 4 ► Level 3 Question No: 29 ( Marks: 1 ) - Please choose one Quantitative process-improvement objectives for the organization are established, continually revised to reflect changing business objectives at ————-. ► Level 3 ► Level 2 ► Level 5 Click here for detail ► Level 1 Question No: 30 ( Marks: 1 ) - Please choose one Reliability of a software is a ► functional requirement ► non-functional requirement Click here for detail ► Design Requirement ► None of the given FINALTERM EXAMINATION Spring 2010 CS605- Software Engineering II (Session - 1) Question No: 1 ( Marks: 1 ) - Please choose one Which of the following is NOT one of the degrees of rigor? Casual Structured Strict TSS (Page 66) 14 Question No: 2 ( Marks: 1 ) - Please choose one Build and Fix model is a ___________ type of software development activity. ► Mathematical ► Perfect ► Haphazard Click here for detail ► Planned Question No: 3 ( Marks: 1 ) - Please choose one Three categories of risks are Business risks, personnel risks, budget risks Project risks, technical risks, business risks (Page 86) Planning risks, technical risks, personnel risks Management risks, technical risks, design risks Question No: 4 ( Marks: 1 ) - Please choose one MTTC is the abbreviation of ► measured time to change ► mean time to collaborate ► mean time to change (Page 68) ► measure time to cope Question No: 5 ( Marks: 1 ) - Please choose one While creating matrix for a set of projects, data should be collected that belongs to a similar domain ► true (Page 72) ► false Question No: 6 ( Marks: 1 ) - Please choose one _________ is one of the techniques to prepare project schedule once we have defined "task network" Program evaluation and review techniques (PERT) (Page 100) Critical Communication path method (CCPM) System resource negotiation method (SRNM) Strategic Schedule Development technique (SSDT) Question No: 7 ( Marks: 1 ) - Please choose one While managing the historical data, we should consider the following except ► Data should be collected only from scientific projects and applications (Page 72) ► Data should be collected from many projects ► Data should be consistent ► Correct data should be taken 15 Question No: 8 ( Marks: 1 ) - Please choose one Quality costs may be divided into costs associated with ► prevention, appraisal, and failure click here for detail ► people, process, and product ► customers, developers, and maintenance ► all of the given Question No: 9 ( Marks: 1 ) - Please choose one When a software is delivered to a client and then client reports the bug in it then that bug is termed as ► Error ► Defect click here for detail ► Mistake ► Fault Question No: 10 ( Marks: 1 ) - Please choose one FTR stands for: Feasibility of technical requirement Fetched Technical Requirement Formal Technical Review (Page 109) None of the given options Question No: 11 ( Marks: 1 ) - Please choose one SQA is an umbrella activity in which following activities are performed EXCEPT Review Testing Project Planning Inspection (Page 177) Question No: 12 ( Marks: 1 ) - Please choose one Software configuration management is used to ► Manage change in the software (Page 119) ► Mange the financials accounts in an organization ► Manage the administration of company ► All of the given 16 Question No: 13 ( Marks: 1 ) - Please choose one Which of the following is not TRUE about "Error Tracking" ? Error tracking can be used to estimate the progress of the project. We track errors in work products to assess the status of a project. Durint "Error Tracking", we may also need the historical data from similar projects. (Page 104) All of the given options. Question No: 14 ( Marks: 1 ) - Please choose one SQA is an activity in which testing is performed only True False (Page 177) Question No: 15 ( Marks: 1 ) - Please choose one Schedule Performance Index (SPI) is equal to BCWP / BCWS (Page 102) BCWP * BCWS BCWP + BCWS BCWP - BCWS Question No: 16 ( Marks: 1 ) - Please choose one BCWS for a task i will be equal to: Risks appeared in task i Effort (person-days etc) for task I (Page 102) Resource deficiency for task i None of the given options Question No: 17 ( Marks: 1 ) - Please choose one if: E = Errors found before shipment D = Errors found during operation Then Defect Removal Efficiency (DRE) is equal to: DRE = E + (E+D) DRE = E - (E+D) DRE = E * (E+D) DRE = E / (E+D) (Page 104) Question No: 18 ( Marks: 1 ) - Please choose one Quality assurance helps management in providing the necessary data about: Product quality (Page 106) Errors/bugs left Errors/bugs highlighted Defect reports 17 Question No: 19 ( Marks: 1 ) - Please choose one The progress on a project at any given point in time can be calculated by: Adding all the BCWS till that point for all tasks (Page 102) Multiplying all the BCWS till that point for all tasks Adding BCWS and EVA for all tasks till that point None of given options Question No: 20 ( Marks: 1 ) - Please choose one The process of rediscovering the software design is called ► Reverse Engineering (Page 139) ► Business Engineering ► Business Process Engineering ► Forward Engineering Question No: 21 ( Marks: 1 ) - Please choose one OCI stands for: Output, Control and Input Click here for detail Overflow of Certain Inputs Overflow of Certain Indexes None of given options Question No: 22 ( Marks: 1 ) - Please choose one A redesigned business process must be prototyped before it is fully integrated into the business. ► False ► True (Page 141) Question No: 23 ( Marks: 1 ) - Please choose one Critical path defines: The list of the resources that may be needed for future activities. The chain of tasks that determines the duration of the project. (Page 100) The list of the deficient resources, project is suffering from. None of the given options. Question No: 24 ( Marks: 1 ) - Please choose one BAC stands for: Budgeted Analysis Cost Budget And Cost Budget at compilation Budget at Completion (Page 102) 18 Question No: 25 ( Marks: 1 ) - Please choose one The first task in concept development project is to: Determine the cost of the concept Determine the resources required for the concept Determine the scope of the concept (Page 99) Determine the test cases for concept Question No: 26 ( Marks: 1 ) - Please choose one Milestone represents: A predictable risk that may hit the project An unpredictable risk that may hit the project The Loss that organization may suffer due to risk The defined target which you need to achieve Click here for detail Question No: 27 ( Marks: 1 ) - Please choose one Timeline chart is also known as the _____________ chart ► Gantt (Page 100) ► PERT ► FREE LANCE ► None of the given Question No: 28 ( Marks: 1 ) - Please choose one The more you refine the tasks, the more you can: Estimate task with accuracy Conclude about scope with accuracy Schedule the project with accuracy All of the given options Question No: 29 ( Marks: 1 ) - Please choose one In a complex system that will lead to much ………..code to write and maintain. ► More (Page 159) ► None of the given ► Less ► Meaningless 19 Question No: 30 ( Marks: 1 ) - Please choose one Which of the following is NOT one of the tasks in concept scoping: Identify needs and benefits Define desired output/control/input Define the function/behavior Identify the ambiguous requirements (Page 100) FINALTERM EXAMINATION Fall 2009 CS605- Software EngineeringII (Session - 1) Question No: 1 ( Marks: 1 ) - Please choose one Defining a |Task Network| helps in defining The resources required for project Third party tool required for project Sequence in which activities will be performed (Page 99) None of these Question No: 2 ( Marks: 1 ) - Please choose one The first step in project planning is to Determine the budget. Select a team organizational model. Determine the project constraints. Establish the objectives and scope. (Page 80) Question No: 3 ( Marks: 1 ) - Please choose one Function Point analysis is helpful in calculating the size of the software for ____________ ► Both client and software organization ► Software organization ► Client ► User (Page 38) 20 Question No: 4 ( Marks: 1 ) - Please choose one The extent to which a program satisfies its specification and fulfills the customer’s mission objectives is said to be achieving the ► Usability ► Efficiency ► Reliability Correctness click here for detail Question No: 5 ( Marks: 1 ) - Please choose one What activity/activities , we can perform to identify the needs and benefits of a task? Establish project statement Identify needs and project constraints All of these Question No: 6 ( Marks: 1 ) - Please choose one BCWS stands for: Budgeted cost of whole System Budgeted cost of work schedule (Page 102) None of the given options Question No: 7 ( Marks: 1 ) - Please choose one BCWP refers to: Normalized value of budgeted cost Overall expected cost of the project (anticipated cost) Budgeted cost of work performed so far (Page 102) Overall cost of the project (calculated after completion of project) Question No: 8 ( Marks: 1 ) - Please choose one Which statement is correct? ► The greater the dependency between the components the greater is coupling Click here for detail ► The lesser the dependency between the components the greater is coupling ► The greater the dependency between the components the lesser is coupling ► None of the given 21 Question No: 9 ( Marks: 1 ) - Please choose one In context of moving range and individual control charts, UNPL stands for: Universal Natural Process Line Universal Natural Process Limit Upper Natural Process Limit (Page 77) Upper Natural Process Line Question No: 10 ( Marks: 1 ) - Please choose one Effort required to test a program to ensure that it performs its intended function __________ Testability page (Page 68) Bug fixing Debugging Security Question No: 11 ( Marks: 1 ) - Please choose one The extent to which a program can be expected to perform its intended function with required precision is called ______ Usability Reliability (Page 67) Portability Maintainability Question No: 12 ( Marks: 1 ) - Please choose one Review is a type of _________ that helps preventing the bugs to move in the next stage of software development ► Bug seeding tool ► Filter (Page 109) ► Alarm Question No: 13 ( Marks: 1 ) - Please choose one ___________ help in finding the matrix to be stable or unstable Control chart (Page 75) Directed Graph Cyclic chart Base line graph 22 Question No: 14 ( Marks: 1 ) - Please choose one Defect Removal Efficiency can be increased by ► By increasing the team member in a team ► Identifying the defect in early stages of development so that it may not be amplified ► Identifying the detect in the later stages of project ► By performing the testing activity only Question No: 15 ( Marks: 1 ) - Please choose one _________give you a better insight into the state of the process or product Metrics (Page 66) Efficiency Reliability Usability Question No: 16 ( Marks: 1 ) - Please choose one Determination of the....................is a pre-requisite of all sorts of estimates, including, resources, time, and budget. software scope (Page 80) software Risk software Quality software Management Question No: 17 ( Marks: 1 ) - Please choose one Following are effective guidelines for Review except ► We need to review the product not the producer ► Be sensitive to personal egos ► Errors should be pointed out gently ► Tone should be high and strict (Page 113) Question No: 18 ( Marks: 1 ) - Please choose one Function/Test matrix is a type of Interim Test report Final test report Project status report click here for detail Management report 23 Question No: 19 ( Marks: 1 ) - Please choose one Poka Yoke is Japanese term and it means ► Mistake Proofing (Page 118) ► Mistake Handling ► Mistake identification ► Mistake assurance Question No: 20 ( Marks: 1 ) - Please choose one we need to employ some statistical techniques and plot the result ---------------. This is known as statistical control techniques. Graphically (Page 74) automatically manually personally Question No: 21 ( Marks: 1 ) - Please choose one The extent to which a program satisfies its specifications and fulfills the customer’s mission objectives is ___ Integrity Reliability Correctness (Page 67) none of given Question No: 22 ( Marks: 1 ) - Please choose one Which is not correct in the context of Poka-Yoke technique? ► Simple and cheap ► Sophisticated and expensive (Page 118) ► Part of Process ► Indication point should be near to the place where the problem occurred Question No: 23 ( Marks: 1 ) - Please choose one Metrics to assess the quality of the analysis models and the corresponding software specification were proposed________ in 1993- 1999. Ricado in 1993 Davis in 1990 Davis in 1993 (Page 71) 24 Question No: 24 ( Marks: 1 ) - Please choose one If Configuration item identification is not identified, it is possible to control changes and establish records. ► False (Page 121) ► True Question No: 25 ( Marks: 1 ) - Please choose one Incomplete Configuration identification documents may result in: Defective Product Higher Maintenance Costs Schedule Product Meet Software Quality A,B,C Click here for detail B,C,D A,B,D A,B,C,D Question No: 26 ( Marks: 1 ) - Please choose one When an Item is baselined, it becomes frozen, here frozen means, that the item can be changed only by creating an old version ► True (Page 72) ► False Question No: 27 ( Marks: 1 ) - Please choose one The most important objective of any engineering activity is to produce high quality product with limited resources and----------------------- Time (Page 66) Persons Cost Metrics Question No: 28 ( Marks: 1 ) - Please choose one Extent to which access to software or data by unauthorized persons can be controlled and called __________ None of given Efficiency Reliability Integrity (Page 67) 25 Question No: 29 ( Marks: 1 ) - Please choose one Object un-lock is done by ► check in (Page 125) ► check out ► both check-in and check-out ► none of the given Question No: 30 ( Marks: 1 ) - Please choose one Requirements engineering is the basis of the contract between the developer and the client. ► True ► False Written as a contract between client and contractor Question No: 31 ( Marks: 1 ) - Please choose one The amount of computing resources required by a program to perform its function is __________ Efficiency (Page 67) Integrity Reliability None of given Question No: 32 ( Marks: 1 ) - Please choose one Legacy system migration is usually hard. One important reason is that no proper documentation of the system is available ► True ► False (Page 134) Question No: 33 ( Marks: 1 ) - Please choose one While assessing a legacy system for further decision, one should decide the following about the supplier ► Is supplier still in existence? ► Is supplier still in business? ► Is supplier can provide support? ► All of the given (Page 137) Question No: 34 ( Marks: 1 ) - Please choose one The application software is assessed on the basis of following factors except ► Documentation ► Understandability ► Code Refactoring (Page 137) ► Test data 26 Question No: 35 ( Marks: 1 ) - Please choose one We modify the internal ______________in code re-structuring ► interface ► design (Page 139) ► data structure ► functionality Question No: 36 ( Marks: 1 ) - Please choose one ______ technique was initially developed for manufacturing processes in the 1920’s by Walter Shewart. Upper Control Line Control chart (Page 75) CMP Quality Question No: 37 ( Marks: 1 ) - Please choose one ―A method requires lot of information from some other class‖ is a symptom of _____________ bad smell ► Data clumps ► Lazy class ► Feature envy (Page 143) ► Long Method Question No: 38 ( Marks: 1 ) - Please choose one _____________ integrates system and software disciplines into single process improvement framework for introducing new disciplines as needs arise. ► SEI ► CMMI Click here for detail ► CMM ► ISO Question No: 39 ( Marks: 1 ) - Please choose one FAST is the abbreviation of Facilitated Application Specification Technology Facilitated Application Specification Technique (Page 80) Facilitated Application Specialization Technique None of the above option 27 Question No: 40 ( Marks: 1 ) - Please choose one In measuring Software Process Quality by using control charts, if the gap between the defects reported and defects fixed is increasing, then it means The product is in unstable condition. (Page 78) the product is ready for shipment the product is in stable condition. None of the above Question No: 41 ( Marks: 1 ) - Please choose one Although there are many different models developed by different researchers for estimation, all of them share which one of the following basic structure ► E = 3.2 (KLOC)1.05 ► E = A + B * (ev)C (Page 81) ► E = [LOC x B0.333/P]3 x (1/t4) ► none of the given Question No: 42 ( Marks: 1 ) - Please choose one A _____________is a user recognizable subgroup of data elements within an ILF or EIF ► Record element type (RET) (Page 46) ► Data Element Type ► External Input ► External Query Question No: 43 ( Marks: 1 ) - Please choose one This chart is then used to develop the individual control chart is called statistical control techniques. Yes (Page 77) No Question No: 44 ( Marks: 1 ) - Please choose one Any delay in _____ path makes the whole project delayed. ► Logical ► Neural ► Physical ► Critical Click here for detail 28 Question No: 45 ( Marks: 1 ) - Please choose one The responsibilities of a Project Manager does not include ► Make a schedule of project ► Allocate tasks to the resources ► Monitoring the tasks ► All these options (Page 28) Question No: 46 ( Marks: 1 ) - Please choose one _________ Subgroups are those that the user has the option of using one or none of the subgroups during an elementary process. ► Optional (Page 46) ► Mandatory ► None of the Given ► RET Question No: 47 ( Marks: 1 ) - Please choose one Process discipline is unlikely to be rigorous, but where it exists it may help to ensure that existing processes are maintained during times of stress and this is done at CMM level ---------. ►1 ►4 ►3 ►2 (Page 172) Question No: 48 ( Marks: 1 ) - Please choose one Which one of the following activities does not belong to Risk Mitigation, Monitoring, and Management Plan? Risk Projection (Page 89) Risk Mitigation Risk avoidance Risk Management and Contingency Planning Question No: 49 ( Marks: 1 ) - Please choose one Which one of the following principles/techniques is NOT software projects scheduling? Interdependency identification Time allocation Effort validation Function point analysis (Page 93) Milestone definition 29 Question No: 50 ( Marks: 1 ) - Please choose one With a complex class you have to move data and methods around in small pieces to avoid errors, it seems slow but it is the __________because you avoid debugging ► Quickest (Page 163) ► Problem ► None of the given ► Slowest FINALTERM EXAMINATION Fall 2008 CS605- Software EngineeringII (Session - 1) Question No: 1 ( Marks: 1 ) - Please choose one The purpose of earned value analysis is to ► determine how to compensate developers based on their productivity ► provide a quantitative means of assessing software project progress (Page 102) ► provide a qualitative means of assessing software project progress ► set the price point for a software product based on development effort Question No: 2 ( Marks: 1 ) - Please choose one The RMMM plan assists the project team in developing strategy for dealing with risk. In this context, an effective strategy must consider: ► Risk avoidance ► Risk monitoring ► Risk management and contingency plan ► All of the given choices (Page 89) Question No: 3 ( Marks: 1 ) - Please choose one The component-based development model is ► only appropriate for computer hardware design. ► not able to support the development of reusable components. ► dependent on object technologies for support. (SE-PRESSMAN, 70) ► not cost effective by known quantifiable software metrics. 30 Question No: 4 ( Marks: 1 ) - Please choose one Which is used to determine the most viable option for cost estimation when the information in the ―Decision tree‖ is complete. E = 3.2 (KLOC) 1.05 Expected cost = (path probability)I x (estimated path cost) (Page 83) Expected cost = (path probability)I x (estimated path cost) Question No: 5 ( Marks: 1 ) - Please choose one After building the Decision Tree, following formula is used to find the expected cost for an option. Choose the correct formula: Expected Cost= (path probability)i * (estimated path cost) (Page 83) Expected Cost= (path probability)i / (estimated path cost) Expected Cost= (path probability)i + (estimated path cost) Expected Cost= (path probability)i - (estimated path cost) Question No: 6 ( Marks: 1 ) - Please choose one Degree of uncertainty that the product will meet its requirements and be fit for its intended use is the Cost risks Schedule risks Performance risks (Page 87) None of the given choices Question No: 7 ( Marks: 1 ) - Please choose one Every task or group of tasks should be associated with a project ------------. Schedule Member Manager Milestone (Page 93) Question No: 8 ( Marks: 1 ) - Please choose one Every task should be assigned to a specific team -------------. ► Member (Page 93) ► Manager ► Organizer ► None of the given 31 Question No: 9 ( Marks: 1 ) - Please choose one Which one is not the Software project planning activity carried out by the project manager for estimation? ► Software scope estimation ► Resources requirements ► Time requirements ► Product Quality (Page 80) Question No: 10 ( Marks: 1 ) - Please choose one Configuration Item identification involves: ►Identifying the structure of the s/w system ►Uniquely identify individual components ►Uniquely identifying various revisions ►All of the given Question No: 11 ( Marks: 1 ) - Please choose one Incomplete Configuration identification documents may result in: ►Schedule Product ►all of the given choices are correct Click here for detail ►Defective Product ►Higher Maintenance Costs Question No: 12 ( Marks: 1 ) - Please choose one Degree of uncertainty that the product will meet its requirements and be fit for its intended use is the ► Cost risks ► Schedule risks ► Performance risks (Page 87) ► None of the given choices Question No: 13 ( Marks: 1 ) - Please choose one Proactive risk management philosophy is also some times termed as Indiana Jones school of risk management ► true ► false (Page 84) Question No: 14 ( Marks: 1 ) - Please choose one Software Availability can be calculated by the following equation: ► Availability = (MTTR/MTTF) x 100 ► Availability = (MTBF/MTTR) x 100 ► Availability = (MTTF/MTBF) x 100 (Page 116) ► Availability = (MTBF/MTTF) x 100 32 Question No: 15 ( Marks: 1 ) - Please choose one Phase Index can be calculated by the help of the following formula, where Ei – the total number of errors uncovered during the ith step in the SE process Si – number of serious errors Mi – number of moderate errors Ti – number of minor errors PSi – product size at the ith step ws, wm, wt – weighting factors for serious, moderate, and minor errors ► PIi = ws(Si/Ei) + wm(Mi/Ei) + wt(Ti/Ei) (Page 115) ► PIi = ws(Si/Ei) + wm(Mi/Mi) + wt(Ti/T) ► PIi = ws(Si/Ei) + wm(Mi/Mi) + wt(Ti/Ei) ► PIi = ws(Si/S) + wm(Mi/M) + wt(Ti/E) Question No: 16 ( Marks: 1 ) - Please choose one The higher the Error Index, the higher will be the Defect Removal Efficiency ► True (Page 115) ► False Question No: 17 ( Marks: 1 ) - Please choose one The goal of quality assurance is to provide management with the data needed to determine which software engineers are producing the most defects. ► true ► False Click here for detail Question No: 18 ( Marks: 1 ) - Please choose one From the following listed software development Model, which one is an object oriented model ► Classical life cycle model ► Fountain model (Page 23) ► Spiral model ► Waterfall model Question No: 19 ( Marks: 1 ) - Please choose one The prototyping model of software development is ► a reasonable approach when requirements are well defined. ► A useful approach when a customer cannot define requirements clearly. Click here for detail ► the best approach to use for projects with large development teams. ► a risky model that rarely produces a meaningful product. 33 Question No: 20 ( Marks: 1 ) - Please choose one Which one of the following does not belong to a strategy for dealing with risk? Risk avoidance Security risk assessment (Page 89) Risk monitoring Risk management and Contingency planning 34 CS605 – Solved Quizzes & MCQs Question No: 1 of 10 ( Marks: 1 ) - Please choose one A _______ entity is the one which have any ----------- in the problem domain without some other entity. Strong, Role* All of the given Weak, Function None of the Given (Page 47) Ref: - A weak entity is the one which does not have any role in the problem domain without some other entity Question No: 2 of 10 ( Marks: 1 ) - Please choose one ILF is a --------------- identifiable group of logically control informations ------------- the boundary of the application. user, within (Page 42) user, without All of the given user, along Question No: 3 of 10 ( Marks: 1 ) - Please choose one Several entities are always created -------------- and deleted together then this is a strong indication that they should be grouped into ---------- logical file/files. Together, Single (Page 48) Together, Multiple Together, Double All of the given Question No: 4 of 10 ( Marks: 1 ) - Please choose one Which of these software characteristics are used to determine the scope of a software project? ► context, lines of code, function ► context, function, communication requirements ► information objectives, function, performance (Page 34) ► communications requirements, performance, information objectives Question No: 5 of 10 ( Marks: 1 ) - Please choose one In _________________ a team is structured along a traditional hierarchy of authority ► closed paradigm (Page 32) ► synchronous paradigm ► random paradigm ► open paradigm 35 Question No: 6 of 10 ( Marks: 1 ) - Please choose one Integrity means that the software should help the users to enjoy usability none of the given Withstand the attack from a hacker (Page 69) help the hacker to hack the system Question No: 7 of 10 ( Marks: 1 ) - Please choose one Ambiguous requirements can be measured quantitatively False True (Page 71) Question No: 8 of 10 ( Marks: 1 ) - Please choose one The Spiral model of software development is of Iterative nature True Click here for detaail false Question No: 9 of 10 ( Marks: 1 ) - Please choose one While performing risk analysis, the impact of risk can not be measured quantitatively ► True ► False Click here for detail Question No: 10 of 10 ( Marks: 1 ) - Please choose one _______ is the measure of how many defects are removed by the quality assurance processes before the product is shipped for operation Defect removal efficiency (Page 69) defect density None of These Question No: 1 of 10 ( Marks: 1 ) - Please choose one For software the total numbers of requirements are equal to _______. Functional requirements non-functional requirements Functional requirements and non-functional requirements (Page 71) None of these 36 Question No: 2 of 10 ( Marks: 1 ) - Please choose one The _____________ model is used to overcome issues related to understanding and capturing of user requirements. Rapid Prototyping (Page 17) Water fall Build and Fix None of the above Question No: 3 of 10 ( Marks: 1 ) - Please choose one ___________ is not the part of software development loop. Status Quo Problem definition Technical development Task set (Page 10) Question No: 4 of 10 ( Marks: 1 ) - Please choose one The level 1 of CMM is known as Managed Defined Initial (Page 12) Repeatable Question No: 5 of 10 ( Marks: 1 ) - Please choose one According to DeMarco a good Project Manger should be very nervous should be very strict in official matters should not ignore any mistake from his team members. should have a big heart and should ignore small mistakes (Page 31) Question No: 6 of 10 ( Marks: 1 ) - Please choose one The best project team organizational model to use when tackling extremely difficult problems is the chief programmer team model democratic decentralized model (Page 32) controlled decentralized model controlled centralized model 37 Question No: 7 of 10 ( Marks: 1 ) - Please choose one Which factor is the least important when choosing the organizational structure for a software team? degree of communication desired predicted size of the resulting program rigidity of the delivery date size of the project budget (Page 32) Question No: 8 of 10 ( Marks: 1 ) - Please choose one Product and process decomposition occurs simultaneously as the project plan evolves True click here for detail False Question No: 9 of 10 ( Marks: 1 ) - Please choose one Measuring the quality and performance of a software through any mean is much better than just making a guess about it. True false Question No: 10 of 10 ( Marks: 1 ) - Please choose one __________________is data that influences an elementary process of the application being counted. Elementary Process External Query External Output Control Information (Page 43) Question No: 1 of 10 ( Marks: 1 ) - Please choose one An entity which defines many-to-many relationship between two or more entities is called Associative Entity Type (Page 47) Attributive Entity Type Entity Subtype None of these Question No: 2 of 10 ( Marks: 1 ) - Please choose one Software risk impact assessment should focus on consequences affecting performance, support, cost, schedule click here for detail planning, resources, cost, schedule marketability, cost, personnel business, technology, process 38 Question No: 3 of 10 ( Marks: 1 ) - Please choose one The number of people required for a software project is determined ► after an estimate of the development effort is made. Click here for detail ► from an assessment of the technical complexity of the system. ► by the size of the project ► all of the given Question No: 4 of 10 ( Marks: 1 ) - Please choose one Defect Removal Efficiency (DRE) can be measured by where E is Errors found delivery and D is error found after delivery (typically within the first year of operation) ► DRE= E/(E+D) (Page 69) ► DRE= E - (E+D) ► DRE= E * (E+D) ► None of the given Question No: 5 of 10 ( Marks: 1 ) - Please choose one In function point analysis technique EO stands for ► Export operation ► Export output ► External output (Page 49) ► None of these Question No: 6 of 10 ( Marks: 1 ) - Please choose one In ____________a team is structured loosely and depends on individual initiative of the team members ► Random paradigm (Page 32) ► closed paradigm ► synchronous paradigm ► open paradigm Question No: 7 of 10 ( Marks: 1 ) - Please choose one ______________ is the first stage of waterfall lifecycle model ► Requirement definition (Page 15) ► Operation ► Unit testing ► Implementation 39 Question No: 8 of 10 ( Marks: 1 ) - Please choose one __________ is not the management part of software development activities. ► Coding p7 ► Configuration Management ► Quality Assurance ► Project planning (Page 7) not sure Question No: 9 of 10 ( Marks: 1 ) - Please choose one Software process and product quality are controlled at ________. level 1 initial level level-4 (Page 12) level-3 Question No: 10 of 10 ( Marks: 1 ) - Please choose one QA is an activity performed ___________ of the software development. at the initial stage at the final stage throughout (Page 25) at the middle Question No: 1 of 10 ( Marks: 1 ) - Please choose one _____________ the ability to encourage people to create and feel creative. Organization Motivation Innovation (Page 30) Managerial Identity Question No: 2 of 10 ( Marks: 1 ) - Please choose one Caper Jones divided software related activities into _____________ different categories. 35 40 20 25 (Page 7) 40 Question No: 3 of 10 ( Marks: 1 ) - Please choose one By default every organization is working at _______________ level 1 (Page 12) level 0 level 3 level 4 Question No: 4 of 10 ( Marks: 1 ) - Please choose one Software Engineering is the set of __________and ___________to develop software. languages , processes classes ,objects processes, tools (Page 4) tools, objects Question No: 5 of 10 ( Marks: 1 ) - Please choose one Software has very close relationship with ___________ Biology Physics chemistry Economics (Page 5) Question No: 6 of 10 ( Marks: 1 ) - Please choose one COCOMO is the classic LOC cost-estimation formula and used thousand delivered source instructions (KDSI) as his _________ of size. LOC milestone unit Click here for detail none of given Question No: 7 of 10 ( Marks: 1 ) - Please choose one _______________ deadline is one of the reasons of project failure. achievable feasible unrealistic (Page 29) realistic 41 Question No: 8 of 10 ( Marks: 1 ) - Please choose one ___________ model is very sensitive to the risk. Spiral (Page 21) waterfall incremental RAD Question No: 9 of 10 ( Marks: 1 ) - Please choose one __________is the ability to encourage technical people to produce to their best. improvement motivation (Page 30) innovation creation Question No: 10 of 10 ( Marks: 1 ) - Please choose one Caper Jones is famous researcher in the field of ___________ who made a company named Software Productivity Research Biology Chemistry Mathematics Software Engineering (Page 7) Question No: 1 of 10 ( Marks: 1 ) - Please choose one Reel has defined _________ steps process to improve the chances of success. 3 4 5 (Page 35) 8 Question No: 2 of 10 ( Marks: 1 ) - Please choose one In ________ model user feedback is received very quickly because product is delivered in small versions. waterfall spiral incremental (Page 18) object oriented 42 Question No:3 of 10 ( Marks: 1 ) - Please choose one _____________ approach is better for the team spirits point of view. Controlled Decentralized Informal, interpersonal procedures Controlled Centralized Democratic Decentralized (Page 32) Question No: 4 of 10 ( Marks: 1 ) - Please choose one Construction activities are directly related to the _____________ of the software. Installation risk analysis development (Page 8) debugging Question No: 5 of 10 ( Marks: 1 ) - Please choose one Continuous process improvement is enabled by __________ feedback from the __________ analytical , user mathematical, user logical, process qualitative , process (Page 12) Question No: 6 of 10 ( Marks: 1 ) - Please choose one The major activities related to software construction are requirement gathering, design development, coding and testing (Page 8) installation and training quality assurance, configuration and planning implementation and management Question No: 7 of 10 ( Marks: 1 ) - Please choose one If requirements are uncertain, ______ will be a suitable. Incremental RAD Waterfall (Page 34) Prototype 43 Question No: 8 of 10 ( Marks: 1 ) - Please choose one Capability maturity model (CMM) is used to judge the __________ model of an organization. Efficiency Performance Productivity Maturity (Page 12) Question No: 9 of 10 ( Marks: 1 ) - Please choose one After passing though all the stages of the software development when we deploy the new system at the user side that stage is called ______ Integration Development Installation Status quo (Page 11) Question No: 10 of 10 ( Marks: 1 ) - Please choose one Defects per function points are a ___ metric. One (Page 65) Two Three Four Question No: 1 of 10 ( Marks: 1 ) - Please choose one In Capability Maturity Model (CMM), ___________ performs optimization. level1 level 2 level3 level5 (Page 12) Question No: 2 of 10 ( Marks: 1 ) - Please choose one If a software developer is going to develop software for a nuclear reactor which factor(s) will be more important? cost effective perfomance reliability both b and c (Page 6) 44 Question No: 3 of 10 ( Marks: 1 ) - Please choose one Capability Maturity Model (CMM) has __________ levels. 4 5 (Page 12) 3 2 Question No: 4 of 10 ( Marks: 1 ) - Please choose one Fred Brook is a famous software engineer who wrote a great book related to software engineering named _______________. A Mythical Man Month (Page 7) A Mathematical Man Software Methodologies None of the above Question No: 5 of 10 ( Marks: 1 ) - Please choose one W5HH Principle consists of seven ___________. Answers Questions (Page 35) points steps Question No: 6 of 10 ( Marks: 1 ) - Please choose one In Rational Unified Process (RUP) horizontal dimension represents the ___________ aspect of the process. Dynamic (Page 24) Static Both Question No: 7 of 10 ( Marks: 1 ) - Please choose one There are two very different approaches to cost estimation. The older approach is called LOC estimation, since it is ………….. on initially estimating the number of lines of code that will need to be developed for the project. Based Click here for detail Good None of given Bad 45 Question No: 8 of 10 ( Marks: 1 ) - Please choose one Task coordinators are appointed for short period of time in ______________ organization team structure. controlled centralized democratic decentralized (Page 32) controlled decentralized formal impersonal approach Question No: 9 of 10 ( Marks: 1 ) - Please choose one _________ model is opposite to waterfall model. Spiral Prototype Click here for detail Synchronize and Stabilize Incremental Question No: 10 of 10 ( Marks: 1 ) - Please choose one MOI model of leadership was developed by ______ Weinberg (Page 30) Newton Don Carlos Question No: 1 of 10 ( Marks: 1 ) - Please choose one Each process define certian deliverables known as the _________. work products (Page 12) softwares final products items Question No: 2 of 10 ( Marks: 1 ) - Please choose one _____________ procedures include QA activities, design and code review, and status meetings. Formal, interpersonal (Page 33) Informal, interpersonal Controlled centralized Formal, impersonal Question No: 3 of 10 ( Marks: 1 ) - Please choose one Miscommunication among project staff is one of the reasons of the failure of the software project True (Page 28) False 46 Question No: 4 of 10 ( Marks: 1 ) - Please choose one According to DeMarco a good team leader should have only _________ characteristics. Four (Page 31) five three seven Question No: 5 of 10 ( Marks: 1 ) - Please choose one Synchronize and Stabilize model is adopted by __________________. Apple Macintosh Microsoft (Page 19) Sun Java System Netsol Technologies Question No: 6 of 10 ( Marks: 1 ) - Please choose one Extreme programming model is very effective when requirement are very ________ and the project scope is very ___________. Changing, limited (Page 23) Changing, unlimited None of these Question No: 7 of 10 ( Marks: 1 ) - Please choose one _______________model is a haphazard type of software development activity. Water fall Incremental Prototyping Build and Fix Click here for detail Question No: 8 of 10 ( Marks: 1 ) - Please choose one Water fall model is a document driven model. True (Page 16) False Question No: 9 of 10 ( Marks: 1 ) - Please choose one ___________paradigm, structures a team loosely and depends on individual initiative of the team members Closed Random (Page 32) Open Synchronous 47 Question No: 10 of 10 ( Marks: 1 ) - Please choose one Spiral model has _____________ dimensions. 2 (Page 20) 3 4 None of the above Question No: 1 of 10 ( Marks: 1 ) - Please choose one The ___________ model of software development is a good approach when core product is required quickly. Incremental click here for detail Linear Sequential Prototyping None of the above Question No: 2 of 10 ( Marks: 1 ) - Please choose one In ____________________ team organization, there is no permanent leader rather there are task coordinators. Controlled Decentralized Democratic Decentralized (Page 32) Controlled Centralized Synchronous paradigm Question No: 3 of 10 ( Marks: 1 ) - Please choose one ___________________ is an Object Oriented model. Spiral Water fall Incremental Fountain (Page 23) Question No: 4 of 10 ( Marks: 1 ) - Please choose one _______________ model is developed keeping in mind the element of risk in the development of software Spiral (Page 20) RAD Incremental Synchronize and Stabilize 48 Question No: 5 of 10 ( Marks: 1 ) - Please choose one Vision phase in a software process focuses on __________. What Why (Page 14) How Change Question No: 6 of 10 ( Marks: 1 ) - Please choose one Rapid application development is another form of _________________. Incremental model (Page 19) Prototyping model Linear Sequential model None of the above Question No: 7 of 10 ( Marks: 1 ) - Please choose one _____________________ phase in a software process focuses on change. Vision Maintenance (Page 14) Definition Development Question No: 8 of 10 ( Marks: 1 ) - Please choose one ________________ model is adopted by Microsoft RAD Build and Fix Spiral Synchronize and Stabilize (Page 19) Question No: 9 of 10 ( Marks: 1 ) - Please choose one ____________________ teams generate more and better solutions than individuals and are most useful for complex problems Decentralized (Page 32) Centralized Question No: 10 of 10 ( Marks: 1 ) - Please choose one The ___________ model of software development is a good approach when core product is required quickly. Incremental click here for detail Linear Sequential Prototyping None of the above 49 Question No: 1 of 10 ( Marks: 1 ) - Please choose one The______________ model of software development is a useful approach when a customer cannot define requirements clearly. Prototyping click here for detail Water fall RAD Build and Fix Question No: 2 of 10 ( Marks: 1 ) - Please choose one ______________ model has a major drawback in that the delivered product may not fulfill the customer's requirements. Water fall (Page 17) Build and Fix Prototyping Integrated water fall and prototyping Question No: 3 of 10 ( Marks: 1 ) - Please choose one MOI model of leadership stands for Motivation , Operationalize ,Integration Misunderstanding , Object, Ideas Motivation , Organization , Innovation (Page 30) Miscommunication , Organization, Invention Question No: 4 of 10 ( Marks: 1 ) - Please choose one ____________activity is performed throughout software production Maintenance Development Analysis Quality Assurance (Page 25) Question No: 5 of 10 ( Marks: 1 ) - Please choose one In ________________ model the product is developed without any proper design and specifications. Water fall Build and Fix (Page 15) Prototyping None of the abov 50 Question No: 6 of 10 ( Marks: 1 ) - Please choose one software project management focuses on the four P’s: These are People , Product , Process , Problem People , Product , Process , Project (Page 29) People , Passion , Process , Project People , Passion , Planning , Project Question No: 7 of 10 ( Marks: 1 ) - Please choose one The _______________ dimension in rational unified process model represents the dynamic aspect of the process. Horizontal (Page 24) Angular Vertical Regular Question No: 8 of 10 ( Marks: 1 ) - Please choose one _____________dimension of Spiral model represents the cumulative cost to date Radial (Page 20) Angular Horizontal circular Question No: 9 of 10 ( Marks: 1 ) - Please choose one The important feature of extreme programming is the concept of __________________. Feedback Risk assessment Pair programming (Page 23) Requirement elicitation Question No: 10 of 10 ( Marks: 1 ) - Please choose one In software development ____________________ is performed at the end of each phase. Verification (Page 26) Validation Question No: 1 of 10 ( Marks: 1 ) - Please choose one Unrealistic deadline is NOT one of the reasons of project failure. True False (Page 29) 51 Question No: 2 of 10 ( Marks: 1 ) - Please choose one Software _____ relates individual software measures to provide a normalized view. Measure Metric (Page 65) Plan Attribute Question No: 3 of 10 ( Marks: 1 ) - Please choose one Quality can be measured if we measure the _____ of the product. correctness maintainability integrety and usability All of the given options (Page 68) Queston No: 4 of 10 ( Marks: 1 ) - Please choose one In case some software, it is extremely easy to operate with intuitive interface conforming to most excellent GUI practices of the industry. It needs very little training ----------------- Less than one hour click here for detail Less than two hour Less than five hour Less than ten hour Question No: 5 of 10 ( Marks: 1 ) - Please choose one Which one of the following is NOT a useful indicator of software quality? Correctness Code size (Page 67) Maintainability Integrity Usability Question No: 6 of 10 ( Marks: 1 ) - Please choose one The software reengineering process model includes restructuring activities for which of the following work items? Code Documentation Data All of the given options click here for detail 52 Question No: 7 of 10 ( Marks: 1 ) - Please choose one One graphical technique for determining whether a process exhibits out-of-control change behavior is a. Control chart (Page 75) Fishbone diagram Pareto diagram Process diagram Question No: 8 of 10 ( Marks: 1 ) - Please choose one Defect per unit function point is a Measure Metric (Page 65) Measurement None of the above Question No: 9 of 10 ( Marks: 1 ) - Please choose one Chart that is used to develop the individual control chart is called statistical control techniques. Yes (Page 75) No Question No: 10 of 10 ( Marks: 1 ) - Please choose one ____________ Is the set of tools and techniques used to develop software? Engineering Software Engineering (Page 4) Question No: 1 of 10 ( Marks: 1 ) - Please choose one The characteristics of well developed software are__________ Reliability User friendliness Cost effective All of the above (Page 5) Question No: 2 of 10 ( Marks: 1 ) - Please choose one SE is a Balancing act Yes (Page 5) No 53 Question No: 3 of 10 ( Marks: 1 ) - Please choose one ________ Is the process of balancing among different characteristics of software? Software Testing Software Development (Page 6) Software Management Software Risk Analysis Question No: 4 of 10 ( Marks: 1 ) - Please choose one ______Is directly related to development of the software Management Construction (Page 8) Coding None of the above Question No: 5 of 10 ( Marks: 1 ) - Please choose one ___________ Basic project management processes established to track cost, schedule and functionality. Has the necessary process discipline in place to repeat earlier successes Related to projects Level 1 Level 2 (Page 12) Level 3 Level 4 Question No: 6 of 10 ( Marks: 1 ) - Please choose one Change control is not necessary if a development group is making use of an automated project database tool. True False Click here for detail Question No: 7 of 10 ( Marks: 1 ) - Please choose one Which one of the following is the 4th level of the SEI Capability Maturity Model? Initial or ad hoc Optimizing Managed (Page 12) Defined Repeatable Question No: 8 of 10 ( Marks: 1 ) - Please choose one Doubling the size of your software project team is guaranteed to cut project completion time in half. True False Click here for detail 54 Question No: 9 of 10 ( Marks: 1 ) - Please choose one Which maturity level is characterised by: "Basic project management processes established to track cost, schedule and functionality. Has the necessary process discipline in place to repeat earlier successes on projects with similar applications". Level 1 Level 2 (Page 12) Level 3 Level 4 Question No: 10 of 10 ( Marks: 1 ) - Please choose one Defect prevention is defined as: Avoiding defect insertion Avoiding defect insertion, but fixing errors when reported Finding and fixing errors after insertion click here for detail Finding and fixing errors after release Not reporting errors Question No: 1 of 10 ( Marks: 1 ) - Please choose one What activity does a software project manager need to perform to minimize the risk of software failure? double the project team size request a large budget allow absolutely no schedule slippage define milestones and track progress Click here for detail Request 50% more time than estimated Question No: 2 of 10 ( Marks: 1 ) - Please choose one The linear sequential model of software development is also known as the Classical life cycle model click here for detail Fountain model Spiral model Chaos model Question No: 3 of 10 ( Marks: 1 ) - Please choose one Which of these benefits can be achieved when software is restructured? higher quality programs reduced maintenance effort software easier to test all of the given options Click here for detail 55 Question No: 4 of 10 ( Marks: 1 ) - Please choose one __________ QA technique involves typically execution of software and the observation of program behavior or outcome. Inspection Walkthroughs Testing Click here for detail Reviews Question No: 5 of 10 ( Marks: 1 ) - Please choose one ___________testing verifies the correct handling of the external functions provided by the software Black box Click here for detail White box Gray box Question No: 6 of 10 ( Marks: 1 ) - Please choose one The quality expectations of a user are that a software system performs useful functions that fit user needs perform correctly over repeated period of time both a and b Click here for detail Question No: 7 of 10 ( Marks: 1 ) - Please choose one Incomplete requirements gathering can result in the ___________ of the project failure (Page 12) reusability success easy maintenance Question No: 8 of 10 ( Marks: 1 ) - Please choose one The root causes of project failure are lack of user input incomplete requirement and specification creep requirement Click here for detail all of the given options 56 Question No: 9 of 10 ( Marks: 1 ) - Please choose one ____________ is a bad smell when a change requires lots of little changes in a lot of different classes. Short gun surgery Click here for detail Duplicated code Large class Lazy class Question No: 10 of 10 ( Marks: 1 ) - Please choose one If you find the code such that one type of change requires changing one subset of method, another type of change requires changing another subset then it is a symptom of_____________ Divergent change Click here for detail Duplicated code Large class Lazy class Question No: 1 of 10 ( Marks: 1 ) - Please choose one Following are the reasons for project failure except Requirements are not clear The name of the software (Page 28) Processes have not been established in the organization Un-realistic deadline Question No: 2 of 10 ( Marks: 1 ) - Please choose one Main characteristic of _______________ model is risk analysis and management Waterfall RAD Spiral Click here for detail Incremental 57