Chapter 7: Solutions for Procurement and Transportation Bottlenecks PDF

Summary

This document discusses solutions for procurement and transportation bottlenecks in supply chains, examining different types of bottlenecks and their corresponding signs and questions for businesses. It provides insights into how to prevent these bottlenecks.

Full Transcript

CHAPTER 7: SOLUTIONS FOR PROCUREMENT AND TRANSPORTATION BOTTLENECKS =================================================================== Bottlenecks hurt supply chains. Consider them as slowdowns in a series of processes that depend on each other. System backups cause everything to slow down or stop...

CHAPTER 7: SOLUTIONS FOR PROCUREMENT AND TRANSPORTATION BOTTLENECKS =================================================================== Bottlenecks hurt supply chains. Consider them as slowdowns in a series of processes that depend on each other. System backups cause everything to slow down or stop working altogether. Bottlenecks reduce output by nature, and they often ruin the best-laid plans of even the most careful supply chain pros. The greatest hassle about bottlenecks is that you have to fix the root cause and work through the backup in lightning-fast time to get back on track. This is why it seems like some supply chains are always stuck and must work hard to compensate for lost time. **Did You Know?** Strong supply networks allow 79% of businesses to expand their revenues at a rate far faster than the average. By contrast, only 8% of companies with troubled supply systems saw revenue growth above average, underscoring the need of efficient supply chain management ([Deloitte, 2024](https://www2.deloitte.com/us/en/pages/operations/articles/supply-chain-leadership.html)). Ein Bild, das Text, Screenshot, Kreis, Design enthält. Automatisch generierte Beschreibung Source: [Faster Capital, 2024](https://fastercapital.com/topics/identifying-supply-chain-bottlenecks.html) **TYPES OF BOTTLENECKS** +-----------------+-----------------+-----------------+-----------------+ | **Category** | **Description** | **Signs** | **Questions for | | | | | Businesses** | +=================+=================+=================+=================+ | **1. | Inaccurate | \- Frequent | \- How often do | | Forecasting | demand | stockouts or | we experience | | Errors & Demand | forecasts and | overstock | stockouts or | | Volatility** | unexpected | situations | excess | | | demand spikes | | inventory?\ | | | or drops can | \- Sudden | - Are our | | | strain | changes in | forecasting | | | production. | inventory | tools | | | | levels | incorporating | | | | | the latest data | | | | | and trends? | +-----------------+-----------------+-----------------+-----------------+ | **2. Supplier | Reliability on | \- Frequent | \- How | | Performance and | suppliers is | delays in raw | frequently do | | Availability** | crucial; | material | we experience | | | disruptions can | deliveries | delays or | | | cause a domino | | quality issues | | | effect | \- Variability | from our | | | throughout the | in the quality | suppliers?\ | | | supply chain. | of supplied | - Do we have | | | | materials | alternative | | | | | suppliers for | | | | | critical | | | | | materials? | +-----------------+-----------------+-----------------+-----------------+ | **3. Production | Physical and | \- Delays in | \- Where are | | and Capacity | time | production | the bottlenecks | | Constraints** | limitations | schedules | in our | | | within | | production | | | production | \- Increasing | process?\ | | | processes can | overtime hours | - How often do | | | create | | we rely on | | | bottlenecks. | | overtime to | | | | | meet production | | | | | targets? | +-----------------+-----------------+-----------------+-----------------+ | **4. Quality | Poor quality | \- Increased | \- How | | Issues** | control can | product returns | frequently do | | | lead to | and customer | we experience | | | production | complaints | product returns | | | slowdowns and | | or defects?\ | | | increased | \- Higher | - Are our | | | returns. | defect rates | quality checks | | | | during | thorough and at | | | | production | multiple stages | | | | | of production? | +-----------------+-----------------+-----------------+-----------------+ | **5. | Issues such as | \- Delays in | \- How often do | | Transportation | weather events, | shipments | we face | | and Logistics | port | | shipping delays | | Challenges** | congestion, and | \- Increased | or increased | | | customs delays | costs due to | costs?\ | | | can create | expedited | - Are we using | | | bottlenecks. | shipping | multiple | | | | | transportation | | | | | routes and | | | | | methods? | +-----------------+-----------------+-----------------+-----------------+ | **6. Inventory | Balancing | \- Overstocked | \- How well do | | Management | inventory | warehouses or | our inventory | | Issues** | levels with | frequent | levels match | | | demand and | stockouts | actual demand?\ | | | storage costs | | - Are we | | | is challenging. | \- High | overburdening | | | | inventory | our storage | | | | carrying costs | facilities with | | | | | excess | | | | | inventory? | +-----------------+-----------------+-----------------+-----------------+ 1. **FORECASTING ERRORS AND DEMAND VOLATILITY** - - - - **How to prevent it?** 2. **SUPPLIER PERFORMANCE AND AVAILABILITY** - **Signs**: - - - **How to prevent It?** 3. **PRODUCTION & CAPACITY CONSTRAINTS** - **Signs**: - - Overtime hours increasing significantly. - **How to Prevent It?** 4. **QUALITY ISSUES** - **Signs**: - - - **How to Prevent It?** 5. **TRANSPORTATION, LOGISTICS CHALLENGES & INVENTORY MANAGEMENT ISSUES** - **Signs**: - - - **How to Prevent It?** 6. **INVENTORY MANAGEMENT ISSUES** - **Signs:** - Overstocked warehouses or frequent stockouts. - High inventory carrying costs. - **How to Prevent It?** ![A diagram of supply chain Description automatically generated](media/image2.png) Source: [Fitsmallbusiness.co.uk, 2024](https://fitsmallbusiness.com/supply-chain-statistics/) **HOW TO PREVENT PROCUREMENT BOTTLENECKS** Preventing and correcting procurement bottlenecks begins with identifying the areas where they most commonly appear. Both public sector organizations and private companies, despite their different goals and needs, often need help with similar challenges in their procurement departments. Four critical areas where bottlenecks are most prevalent include: Businesses that want to succeed in procurement must adopt cutting edge data analytics, build solid supplier relationships, and expedite their approval processes. Implementing current technologies may maximise expenditure analysis, increase transparency, and greatly improve demand forecasts. A strong, visible trend towards more automation and digitization in the future may help remove obstacles and increase productivity. 1. **STEP 1 -- ESTABLISH THE APPROVAL PROCESS AND WORKFLOW** - - - - Are our approval processes clearly defined and documented? - - **Solutions** - 2. **STEP 2 -- NURTURE SUPPLIER RELATIONSHIPS** - - **Inconsistent Supplier Performance:** Variability in supplier reliability and quality can disrupt the supply chain. - - - Do we have performance metrics in place to evaluate our suppliers regularly? - - 3. **STEP 3 -- CONDUCT SPEND ANALYSIS** - - - - - - - 4. **STEP 4 -- TACKLE LEAD MANAGEMENT** - - - - - - - **KEY TAKEAWAYS** - **Bottlenecks Hurt Supply Chains**: Think of bottlenecks as slowdowns in a chain of processes that rely on each other. When one part gets backed up, it slows everything down, reducing output and derailing even the most meticulous plans. - **Fixing Bottlenecks Quickly**: The biggest hassle with bottlenecks is that you need to address the root cause and clear the backup super fast to get back on track. This is why some supply chains always seem to be playing catch-up. - **Forecasting Errors Are Costly**: When demand forecasts are off, it messes with your inventory---leading to either too much stock or not enough. Keeping your forecasting tools updated with the latest data and trends is crucial. - **Supplier Performance**: Relying on suppliers means their issues become your issues. Frequent delays or poor-quality materials from suppliers can disrupt your entire supply chain. Have backup suppliers and regularly evaluate your primary ones. - **Production Limits Can Choke Output**: Physical or time constraints in production can create bottlenecks, causing delays and forcing overtime. Identify these bottlenecks and streamline your processes to maintain smooth production. - **Quality Control Matters**: Poor quality control leads to production slowdowns and increased returns. Regular quality checks at multiple stages of production help keep defect rates low and customer satisfaction high.

Use Quizgecko on...
Browser
Browser