This document outlines procedures and responsibilities for handling mould remediation issues, insurance considerations, legal regulations, and related matters concerning a construction project.
Full Transcript
GC 9.5 MOULD 9.5.1 If the Contractor or Owner observes or reasonably suspects the presence of mould at the Place of the Work, the remediation of which is not expressly part of the Work,.1 the observing party shall promptly report the circumstances to the other party in writing, and.2...
GC 9.5 MOULD 9.5.1 If the Contractor or Owner observes or reasonably suspects the presence of mould at the Place of the Work, the remediation of which is not expressly part of the Work,.1 the observing party shall promptly report the circumstances to the other party in writing, and.2 the Contractor shall promptly take all reasonable steps, including stopping the Work if necessary, to ensure that no person suffers injury, sickness or death and that no property is damaged as a result of exposure to or the presence of the mould, and.3 if the Owner and Contractor do not agree on the existence, significance or cause of the mould or as to what steps need be taken to deal with it, the Owner shall retain and pay for an independent qualified expert to investigate and determine such matters. The expert’s report shall be delivered to the Owner and Contractor. 9.5.2 If the Owner and Contractor agree, or if the expert referred to in paragraph 9.5.1.3 determines that the presence of mould was caused by the Contractor’s operations under the Contract, the Contractor shall promptly, at the Contractor’s own expense:.1 take all reasonable and necessary steps to safely remediate or dispose of the mould, and.2 make good any damage to the Work, the Owner’s property or property adjacent to the Place of the Work as provided in paragraph 9.1.3 of GC 9.1 - PROTECTION OF WORK AND PROPERTY, and.3 reimburse the Owner for reasonable costs incurred under paragraph 9.5.1.3, and.4 indemnify the Owner as required by GC 12.1 - INDEMNIFICATION. 9.5.3 If the Owner and Contractor agree, or if the expert referred to in paragraph 9.5.1.3 determines that the presence of mould was not caused by the Contractor’s operations under the Contract, the Owner shall promptly, at the Owner’s own expense:.1 take all reasonable and necessary steps to safely remediate or dispose of the mould, and.2 reimburse the Contractor for the cost of taking the steps under paragraph 9.5.1.2 and making good any damage to the Work as provided in paragraph 9.1.4 of GC 9.1 - PROTECTION OF WORK AND PROPERTY, and.3 extend the Contract Time for such reasonable time as the Consultant may recommend in consultation with the Contractor and the expert referred to in paragraph 9.5.1.3 and reimburse the Contractor for reasonable costs incurred as a result of the delay, and.4 indemnify the Contractor as required by GC 12.1 - INDEMNIFICATION. 9.5.4 If either party does not accept the expert’s finding under paragraph 9.5.1.3, the disagreement shall be settled in accordance with Part 8 of the General Conditions - DISPUTE RESOLUTION. If such desagreement is not resolved promptly, the parties shall act immediately in accordance with the expert’s determination and take the steps required by paragraphs 9.5.2 or 9.5.3, it being understood that by so doing neither party will jeopardize any claim the party may have to be reimbursed as provided by GC 9.5 - MOULD. PART 10 GOVERNING REGULATIONS GC 10.1 TAXES AND DUTIES 10.1.1 The Contract Price shall include all taxes and customs duties in effect at the time of the bid closing except for Value Added Taxes payable by the Owner to the Contractor as stipulated in Article A-4 of the Agreement - CONTRACT PRICE. 10.1.2 Any increase or decrease in costs to the Contractor due to changes in such included taxes and duties after the time of the bid closing shall increase or decrease the Contract Price accordingly. GC 10.2 LAWS, NOTICES, PERMITS, AND FEES 10.2.1 The laws of the Place of the Work shall govern the Work. 10.2.2 The Owner shall obtain and pay for development approvals, building permit, permanent easements, rights of servitude, and all other necessary approvals and permits, except for the permits and fees referred to in paragraph 10.2.3 or for which the Contract Documents specify as the responsibility of the Contractor. 10.2.3 The Contractor shall be responsible for the procurement of permits, licences, inspections, and certificates, which are necessary for the performance of the Work and customarily obtained by contractors in the jurisdiction of the Place of the Work after the issuance of the building permit. The Contract Price includes the cost of these permits, licences, inspections, and certificates, and their procurement. 10.2.4 The Contractor shall give the required notices and comply with the laws, ordinances, rules, regulations, or codes which are or become in force during the performance of the Work and which relate to the Work, to the preservation of the public health, and to construction safety. CCDC 2 – 2008 File 007213 25 Note: This contract is protected by copyright. Use of a CCDC 2 document not containing a CCDC 2 copyright seal constitutes an infringement of copyright. Only sign this contract if the document cover page bears a CCDC 2 copyright seal to demonstrate that it is intended by the parties to be an accurate and unamended version of CCDC 2 – 2008 except to the extent that any alterations, additions or modifications are set forth in supplementary conditions. 10.2.5 The Contractor shall not be responsible for verifying that the Contract Documents are in compliance with the applicable laws, ordinances, rules, regulations, or codes relating to the Work. If the Contract Documents are at variance therewith, or if, subsequent to the time of bid closing, changes are made to the applicable laws, ordinances, rules, regulations, or codes which require modification to the Contract Documents, the Contractor shall advise the Consultant in writing requesting direction immediately upon such variance or change becoming known. The Consultant will make the changes required to the Contract Documents as provided in GC 6.1 - OWNER’S RIGHT TO MAKE CHANGES, GC 6.2 - CHANGE ORDER and GC 6.3 - CHANGE DIRECTIVE. 10.2.6 If the Contractor fails to advise the Consultant in writing; and fails to obtain direction as required in paragraph 10.2.5; and performs work knowing it to be contrary to any laws, ordinances, rules, regulations, or codes; the Contractor shall be responsible for and shall correct the violations thereof; and shall bear the costs, expenses and damages attributable to the failure to comply with the provisions of such laws, ordinances, rules, regulations, or codes. 10.2.7 If, subsequent to the time of bid closing, changes are made to applicable laws, ordinances, rules, regulations, or codes of authorities having jurisdiction which affect the cost of the Work, either party may submit a claim in accordance with the requirements of GC 6.6 – CLAIMS FOR A CHANGE IN CONTRACT PRICE. GC 10.3 PATENT FEES 10.3.1 The Contractor shall pay the royalties and patent licence fees required for the performance of the Contract. The Contractor shall hold the Owner harmless from and against claims, demands, losses, costs, damages, actions, suits, or proceedings arising out of the Contractor's performance of the Contract which are attributable to an infringement or an alleged infringement of a patent of invention by the Contractor or anyone for whose acts the Contractor may be liable. 10.3.2 The Owner shall hold the Contractor harmless against claims, demands, losses, costs, damages, actions, suits, or proceedings arising out of the Contractor's performance of the Contract which are attributable to an infringement or an alleged infringement of a patent of invention in executing anything for the purpose of the Contract, the model, plan or design of which was supplied to the Contractor as part of the Contract Documents. GC 10.4 WORKERS' COMPENSATION 10.4.1 Prior to commencing the Work, again with the Contractor’s application for payment of the holdback amount following Substantial Performance of the Work and again with the Contractor’s application for final payment, the Contractor shall provide evidence of compliance with workers' compensation legislation at the Place of the Work, including payments due thereunder. 10.4.2 At any time during the term of the Contract, when requested by the Owner, the Contractor shall provide such evidence of compliance by the Contractor and Subcontractors. PART 11 INSURANCE AND CONTRACT SECURITY GC 11.1 INSURANCE 11.1.1 Without restricting the generality of GC 12.1 - INDEMNIFICATION, the Contractor shall provide, maintain and pay for the following insurance coverages, the minimum requirements of which are specified in CCDC 41 – CCDC Insurance Requirements in effect at the time of bid closing except as hereinafter provided:.1 General liability insurance in the name of the Contractor and include, or in the case of a single, blanket policy, be endorsed to name, the Owner and the Consultant as insureds but only with respect to liability, other than legal liability arising out of their sole negligence, arising out of the operations of the Contractor with regard to the Work. General liability insurance shall be maintained from the date of commencement of the Work until one year from the date of Substantial Performance of the Work. Liability coverage shall be provided for completed operations hazards from the date of Substantial Performance of the Work, as set out in the certificate of Substantial Performance of the Work, on an ongoing basis for a period of 6 years following Substantial Performance of the Work..2 Automobile Liability Insurance from the date of commencement of the Work until one year after the date of Substantial Performance of the Work..3 Aircraft or Watercraft Liability Insurance when owned or non-owned aircraft or watercraft are used directly or indirectly in the performance of the Work.4 "Broad form" property insurance in the joint names of the Contractor, the Owner and the Consultant. The policy shall include as insureds all Subcontractors. The “Broad form” property insurance shall be provided from the date of commencement of the Work until the earliest of: (1) 10 calendar days after the date of Substantial Performance of the Work; CCDC 2 – 2008 File 007213 26 Note: This contract is protected by copyright. Use of a CCDC 2 document not containing a CCDC 2 copyright seal constitutes an infringement of copyright. Only sign this contract if the document cover page bears a CCDC 2 copyright seal to demonstrate that it is intended by the parties to be an accurate and unamended version of CCDC 2 – 2008 except to the extent that any alterations, additions or modifications are set forth in supplementary conditions. (2) on the commencement of use or occupancy of any part or section of the Work unless such use or occupancy is for construction purposes, habitational, office, banking, convenience store under 465 square metres in area, or parking purposes, or for the installation, testing and commissioning of equipment forming part of the Work; (3) when left unattended for more than 30 consecutive calendar days or when construction activity has ceased for more than 30 consecutive calendar days..5 Boiler and machinery insurance in the joint names of the Contractor, the Owner and the Consultant. The policy shall include as insureds all Subcontractors. The coverage shall be maintained continuously from commencement of use or operation of the boiler and machinery objects insured by the policy and until 10 calendar days after the date of Substantial Performance of the Work..6 The “Broad form” property and boiler and machinery policies shall provide that, in the case of a loss or damage, payment shall be made to the Owner and the Contractor as their respective interests may appear. In the event of loss or damage: (1) the Contractor shall act on behalf of the Owner for the purpose of adjusting the amount of such loss or damage payment with the insurers. When the extent of the loss or damage is determined, the Contractor shall proceed to restore the Work. Loss or damage shall not affect the rights and obligations of either party under the Contract except that the Contractor shall be entitled to such reasonable extension of Contract Time relative to the extent of the loss or damage as the Consultant may recommend in consultation with the Contractor; (2) the Contractor shall be entitled to receive from the Owner, in addition to the amount due under the Contract, the amount which the Owner's interest in restoration of the Work has been appraised, such amount to be paid as the restoration of the Work proceeds in accordance with the progress payment provisions. In addition the Contractor shall be entitled to receive from the payments made by the insurer the amount of the Contractor's interest in the restoration of the Work; and (3) to the Work arising from the work of the Owner, the Owner's own forces or another contractor, the Owner shall, in accordance with the Owner's obligations under the provisions relating to construction by Owner or other contractors, pay the Contractor the cost of restoring the Work as the restoration of the Work proceeds and as in accordance with the progress payment provisions..7 Contractors' Equipment Insurance from the date of commencement of the Work until one year after the date of Substantial Performance of the Work. 11.1.2 Prior to commencement of the Work and upon the placement, renewal, amendment, or extension of all or any part of the insurance, the Contractor shall promptly provide the Owner with confirmation of coverage and, if required, a certified true copy of the policies certified by an authorized representative of the insurer together with copies of any amending endorsements applicable to the Work. 11.1.3 The parties shall pay their share of the deductible amounts in direct proportion to their responsibility in regards to any loss for which the above policies are required to pay, except where such amounts may be excluded by the terms of the Contract. 11.1.4 If the Contractor fails to provide or maintain insurance as required by the Contract Documents, then the Owner shall have the right to provide and maintain such insurance and give evidence to the Contractor and the Consultant. The Contractor shall pay the cost thereof to the Owner on demand or the Owner may deduct the cost from the amount which is due or may become due to the Contractor. 11.1.5 All required insurance policies shall be with insurers licensed to underwrite insurance in the jurisdiction of the Place of the Work. 11.1.6 If a revised version of CCDC 41 – INSURANCE REQUIREMENTS is published, which specifies reduced insurance requirements, the parties shall address such reduction, prior to the Contractor’s insurance policy becoming due for renewal, and record any agreement in a Change Order. 11.1.7 If a revised version of CCDC 41 – INSURANCE REQUIREMENTS is published, which specifies increased insurance requirements, the Owner may request the increased coverage from the Contractor by way of a Change Order. 11.1.8 A Change Directive shall not be used to direct a change in the insurance requirements in response to the revision of CCDC 41 – INSURANCE REQUIREMENTS. GC 11.2 CONTRACT SECURITY 11.2.1 The Contractor shall, prior to commencement of the Work or within the specified time, provide to the Owner any Contract security specified in the Contract Documents. CCDC 2 – 2008 File 007213 27 Note: This contract is protected by copyright. Use of a CCDC 2 document not containing a CCDC 2 copyright seal constitutes an infringement of copyright. Only sign this contract if the document cover page bears a CCDC 2 copyright seal to demonstrate that it is intended by the parties to be an accurate and unamended version of CCDC 2 – 2008 except to the extent that any alterations, additions or modifications are set forth in supplementary conditions. 11.2.2 If the Contract Documents require surety bonds to be provided, such bonds shall be issued by a duly licensed surety company authorized to transact the business of suretyship in the province or territory of the Place of the Work and shall be maintained in good standing until the fulfillment of the Contract. The form of such bonds shall be in accordance with the latest edition of the CCDC approved bond forms. PART 12 INDEMNIFICATION, WAIVER OF CLAIMS AND WARRANTY GC 12.1 INDEMNIFICATION 12.1.1 Without restricting the parties’ obligation to indemnify as described in paragraphs 12.1.4 and 12.1.5, the Owner and the Contractor shall each indemnify and hold harmless the other from and against all claims, demands, losses, costs, damages, actions, suits, or proceedings whether in respect to losses suffered by them or in respect to claims by third parties that arise out of, or are attributable in any respect to their involvement as parties to this Contract, provided such claims are:.1 caused by: (1) the negligent acts or omissions of the party from whom indemnification is sought or anyone for whose acts or omissions that party is liable, or (2) a failure of the party to the Contract from whom indemnification is sought to fulfill its terms or conditions; and.2 made by Notice in Writing within a period of 6 years from the date of Substantial Performance of the Work as set out in the certificate of Substantial Performance of the Work issued pursuant to paragraph 5.4.2.2 of GC 5.4 – SUBSTANTIAL PERFORMANCE OF THE WORK or within such shorter period as may be prescribed by any limitation statute of the province or territory of the Place of the Work. The parties expressly waive the right to indemnity for claims other than those provided for in this Contract. 12.1.2 The obligation of either party to indemnify as set forth in paragraph 12.1.1 shall be limited as follows:.1 In respect to losses suffered by the Owner and the Contractor for which insurance is to be provided by either party pursuant to GC 11.1 – INSURANCE, the general liability insurance limit for one occurrence as referred to in CCDC 41 in effect at the time of bid closing..2 In respect to losses suffered by the Owner and the Contractor for which insurance is not required to be provided by either party in accordance with GC 11.1 – INSURANCE, the greater of the Contract Price as recorded in Article A-4 – CONTRACT PRICE or $2,000,000, but in no event shall the sum be greater than $20,000,000..3 In respect to claims by third parties for direct loss resulting from bodily injury, sickness, disease or death, or to injury to or destruction of tangible property, the obligation to indemnify is without limit. In respect to all other claims for indemnity as a result of claims advanced by third parties, the limits of indemnity set forth in paragraphs 12.1.2.1 and 12.1.2.2 shall apply. 12.1.3 The obligation of either party to indemnify the other as set forth in paragraphs 12.1.1 and 12.1.2 shall be inclusive of interest and all legal costs. 12.1.4 The Owner and the Contractor shall indemnify and hold harmless the other from and against all claims, demands, losses, costs, damages, actions, suits, or proceedings arising out of their obligations described in GC 9.2 – TOXIC AND HAZARDOUS SUBSTANCES. 12.1.5 The Owner shall indemnify and hold harmless the Contractor from and against all claims, demands, losses, costs, damages, actions, suits, or proceedings:.1 as described in paragraph 10.3.2 of GC 10.3 – PATENT FEES, and.2 arising out of the Contractor's performance of the Contract which are attributable to a lack of or defect in title or an alleged lack of or defect in title to the Place of the Work. 12.1.6 In respect to any claim for indemnity or to be held harmless by the Owner or the Contractor:.1 Notice in Writing of such claim shall be given within a reasonable time after the facts upon which such claim is based became known;.2 should any party be required as a result of its obligation to indemnify another to pay or satisfy a final order, judgment or award made against the party entitled by this contract to be indemnified, then the indemnifying party upon assuming all liability for any costs that might result shall have the right to appeal in the name of the party against whom such final order or judgment has been made until such rights of appeal have been exhausted. CCDC 2 – 2008 File 007213 28 Note: This contract is protected by copyright. Use of a CCDC 2 document not containing a CCDC 2 copyright seal constitutes an infringement of copyright. Only sign this contract if the document cover page bears a CCDC 2 copyright seal to demonstrate that it is intended by the parties to be an accurate and unamended version of CCDC 2 – 2008 except to the extent that any alterations, additions or modifications are set forth in supplementary conditions. GC 12.2 WAIVER OF CLAIMS 12.2.1 Subject to any lien legislation applicable to the Place of the Work, as of the fifth calendar day before the expiry of the lien period provided by the lien legislation applicable at the Place of the Work, the Contractor waives and releases the Owner from all claims which the Contractor has or reasonably ought to have knowledge of that could be advanced by the Contractor against the Owner arising from the Contractor’s involvement in the Work, including, without limitation, those arising from negligence or breach of contract in respect to which the cause of action is based upon acts or omissions which occurred prior to or on the date of Substantial Performance of the Work, except as follows:.1 claims arising prior to or on the date of Substantial Performance of the Work for which Notice in Writing of claim has been received by the Owner from the Contractor no later than the sixth calendar day before the expiry of the lien period provided by the lien legislation applicable at the Place of the Work;.2 indemnification for claims advanced against the Contractor by third parties for which a right of indemnification may be asserted by the Contractor against the Owner pursuant to the provisions of this Contract;.3 claims for which a right of indemnity could be asserted by the Contractor pursuant to the provisions of paragraphs 12.1.4 or 12.1.5 of GC 12.1 – INDEMNIFICATION; and.4 claims resulting from acts or omissions which occur after the date of Substantial Performance of the Work. 12.2.2 The Contractor waives and releases the Owner from all claims referenced in paragraph 12.2.1.4 except for those referred in paragraphs 12.2.1.2 and 12.2.1.3 and claims for which Notice in Writing of claim has been received by the Owner from the Contractor within 395 calendar days following the date of Substantial Performance of the Work. 12.2.3 Subject to any lien legislation applicable to the Place of the Work, as of the fifth calendar day before the expiry of the lien period provided by the lien legislation applicable at the Place of the Work, the Owner waives and releases the Contractor from all claims which the Owner has or reasonably ought to have knowledge of that could be advanced by the Owner against the Contractor arising from the Owner’s involvement in the Work, including, without limitation, those arising from negligence or breach of contract in respect to which the cause of action is based upon acts or omissions which occurred prior to or on the date of Substantial Performance of the Work, except as follows:.1 claims arising prior to or on the date of Substantial Performance of the Work for which Notice in Writing of claim has been received by the Contractor from the Owner no later than the sixth calendar day before the expiry of the lien period provided by the lien legislation applicable at the Place of the Work;.2 indemnification for claims advanced against the Owner by third parties for which a right of indemnification may be asserted by the Owner against the Contractor pursuant to the provisions of this Contract;.3 claims for which a right of indemnity could be asserted by the Owner against the Contractor pursuant to the provisions of paragraph 12.1.4 of GC 12.1 - INDEMNIFICATION;.4 damages arising from the Contractor’s actions which result in substantial defects or deficiencies in the Work. “Substantial defects or deficiencies” mean those defects or deficiencies in the Work which affect the Work to such an extent or in such a manner that a significant part or the whole of the Work is unfit for the purpose intended by the Contract Documents;.5 claims arising pursuant to GC 12.3 - WARRANTY; and.6 claims arising from acts or omissions which occur after the date of Substantial Performance of the Work. 12.2.4 The Owner waives and releases the Contractor from all claims referred to in paragraph 12.2.3.4 except claims for which Notice in Writing of claim has been received by the Contractor from the Owner within a period of six years from the date of Substantial Performance of the Work should any limitation statute of the Province or Territory of the Place of the Work permit such agreement. If the applicable limitation statute does not permit such agreement, within such shorter period as may be prescribed by:.1 any limitation statute of the Province or Territory of the Place of the Work; or.2 if the Place of the Work is the Province of Quebec, then Article 2118 of the Civil Code of Quebec. 12.2.5 The Owner waives and releases the Contractor from all claims referenced in paragraph 12.2.3.6 except for those referred in paragraph 12.2.3.2, 12.2.3.3 and those arising under GC 12.3 – WARRANTY and claims for which Notice in Writing has been received by the Contractor from the Owner within 395 calendar days following the date of Substantial Performance of the Work. 12.2.6 “Notice in Writing of claim” as provided for in GC 12.2 – WAIVER OF CLAIMS to preserve a claim or right of action which would otherwise, by the provisions of GC 12.2 – WAIVER OF CLAIMS, be deemed to be waived, must include the following:.1 a clear and unequivocal statement of the intention to claim;.2 a statement as to the nature of the claim and the grounds upon which the claim is based; and.3 a statement of the estimated quantum of the claim. 12.2.7 The party giving “Notice in Writing of claim” as provided for in GC 12.2 – WAIVER OF CLAIMS shall submit within a reasonable time a detailed account of the amount claimed. CCDC 2 – 2008 File 007213 29 Note: This contract is protected by copyright. Use of a CCDC 2 document not containing a CCDC 2 copyright seal constitutes an infringement of copyright. Only sign this contract if the document cover page bears a CCDC 2 copyright seal to demonstrate that it is intended by the parties to be an accurate and unamended version of CCDC 2 – 2008 except to the extent that any alterations, additions or modifications are set forth in supplementary conditions. 12.2.8 Where the event or series of events giving rise to a claim made under paragraphs 12.2.1 or 12.2.3 has a continuing effect, the detailed account submitted under paragraph 12.2.7 shall be considered to be an interim account and the party making the claim shall submit further interim accounts, at reasonable intervals, giving the accumulated amount of the claim and any further grounds upon which it is based. The party making the claim shall submit a final account after the end of the effects resulting from the event or series of events. 12.2.9 If a Notice in Writing of claim pursuant to paragraph 12.2.1.1 is received on the seventh or sixth calendar day before the expiry of the lien period provided by the lien legislation applicable at the Place of the Work, the period within which Notice in Writing of claim shall be received pursuant to paragraph 12.2.3.1 shall be extended to two calendar days before the expiry of the lien period provided by the lien legislation applicable at the Place of the Work. 12.2.10 If a Notice in Writing of claim pursuant to paragraph 12.2.3.1 is received on the seventh or sixth calendar day before the expiry of the lien period provided by the lien legislation applicable at the Place of the Work, the period within which Notice in Writing of claim shall be received pursuant to paragraph12.2.1.1 shall be extended to two calendar days before the expiry of the lien period provided by the lien legislation applicable at the Place of the Work. GC 12.3 WARRANTY 12.3.1 Except for extended warranties as described in paragraph 12.3.6, the warranty period under the Contract is one year from the date of Substantial Performance of the Work. 12.3.2 The Contractor shall be responsible for the proper performance of the Work to the extent that the design and Contract Documents permit such performance. 12.3.3 The Owner, through the Consultant, shall promptly give the Contractor Notice in Writing of observed defects and deficiencies which occur during the one year warranty period. 12.3.4 Subject to paragraph 12.3.2, the Contractor shall correct promptly, at the Contractor's expense, defects or deficiencies in the Work which appear prior to and during the one year warranty period. 12.3.5 The Contractor shall correct or pay for damage resulting from corrections made under the requirements of paragraph 12.3.4. 12.3.6 Any extended warranties required beyond the one year warranty period as described in paragraph 12.3.1, shall be as specified in the Contract Documents. Extended warranties shall be issued by the warrantor to the benefit of the Owner. The Contractor’s responsibility with respect to extended warranties shall be limited to obtaining any such extended warranties from the warrantor. The obligations under such extended warranties are solely the responsibilities of the warrantor. CCDC 2 – 2008 File 007213 30 Note: This contract is protected by copyright. Use of a CCDC 2 document not containing a CCDC 2 copyright seal constitutes an infringement of copyright. Only sign this contract if the document cover page bears a CCDC 2 copyright seal to demonstrate that it is intended by the parties to be an accurate and unamended version of CCDC 2 – 2008 except to the extent that any alterations, additions or modifications are set forth in supplementary conditions.