Highway Engineering PDF

Document Details

Uploaded by Deleted User

Tags

highway engineering road design traffic studies transportation

Summary

This document covers highway engineering topics, including historical development of roads in Nepal, technical terms, and requirements for an ideal road alignment. It details various aspects of road design, maintenance, and specific specifications that are helpful to professionals in the field.

Full Transcript

# Highway Engineering ## 1. General - Highway, Railway, Waterways, Airway ## 1.2. Historic Development of Roads in Nepal - नया बाचे काम गोस्वारा पुरानो बाचे काम गोखार }- 1948. AD - Public work development: -1950AD - Department of road - 1970 AD - Department of building J (2027 BS) ## * In world...

# Highway Engineering ## 1. General - Highway, Railway, Waterways, Airway ## 1.2. Historic Development of Roads in Nepal - नया बाचे काम गोस्वारा पुरानो बाचे काम गोखार }- 1948. AD - Public work development: -1950AD - Department of road - 1970 AD - Department of building J (2027 BS) ## * In world 1. Roman road (Roman) 2. Tresaguet read (France) 3. Metcalf road (England) 4. Telford read (UK) 5. Macadam construction (England) ## 1.3 Basic requirement of an ideal alignment 1. Short 2. Easy 3. Safe 4. Economical (S.ES.E) ## * Sensitinty & flexibility F = Rate of charge of outlet discharge " parent discharge For proportional outlet, F=1 hyper proportional, F>1 Sub-proportional, F<1 ## Sensitivity S = Rate of change of outlet dischane water lerd Rate F " = 29/9 LD/D Q=CDn constant S=nF, n= canal index * for rigid module, S=0 * Gibb's module is a type of rigid module. ## * for hill read, additional care should be done for 1. Stability 2. Drainage 3. Geometric 4. Resisting leigh Standard ## 1.4 Technical terms ### a) Approach road (15m min) * A single vertical come shall be provided for a bridge for bridge having total length of 30m. ### b) Berm Berm ### ) Bleeding (reasons. ) - due to excessive binder. - not hot enough during application - insufficient binding material - loss of cover aggregates) - Also known as flushing. - To stop bleeding more, blindage (coarse & fine agg.) should be applied, ### d) Blinding (gritting) ## Spreading of stone chips, sand & other fine material. ### e) Borrow pit (paralled to road) ### +) Centrifugal ratio = P = √² = W Centrifugal fore wt of vehicle * P < b to avoid overturn W *P <f to avoid lateral skid W ### g) Crete way - width = 60-75cm - thickness = 10 to 15 um - C/S spacing = 1.5m ### 4) Dead man or motam (Tell-tale) - ↑post ((arबा) - ↑ left over ((छोडेको) - * both semeo same purpose ### i) Fly over ### o) Off backing ### p) Prime coat (0.8 to 1.57 lit/m²): 1.05 ### 9) Road delineator: Outlining roadway. ### r) Ribbon development ### 5) Road furniture - Delineator, boards, lights etc ### t) Rumble strips (Rough surface for vibration) ### 4) Sage: Junction of two falling gradient. ### ✔ Seal wat 0.66/H/m² & sand = 0.012m³/m² * baffic is allowed after 24hn of application (impending & sideway) ### Mi) skidding → घुमेको भन्दा धेर कुदा। ### x) slipping → - धुने जति कुवेन । - 120 - ↓ - ०८. - ↓ - NRS:- longitudinal friction coeff=0.3有100.4 - Lateral " " - 0.15 ### y) Subway - z) Summit junction of - too ising gradient ## 1.5 Technical terms (2) ### a) Tack loet: (0.5 to 1.05 lit/m²):. O'.f ### b) Traffic lane (3.5m) ### e) Traffic segregation (for efficiency & safely) ### a) Traffic capacity: Vechile per hour perlane ### e) Traffic volume density; Vechile per km ### Traffic volume 1 No. of reahide that pass a given point during specified point of time. - Traffic volume=Traffic density X traffic speed ### g) Theoritical or basic capacity - C = DOOOV - vehick/hr - S - 3=spacing(m) - V= km/hr ### -1.5 m in bridge & naducts. - in no cose - Pleass than 1. 모량음 ### 5) Traffic separator or median - (5m min) - (3m in restricted) ### 1) Tuming radius - 1) curb to carb - #wheel base - * wheel cut - * small radius - a) curb to curb (ii) wall to wall - dist. beth front & rear axle - max. angle tyre can state - → small wheel base f - large whed cut needed. - * turning radio of car = 35.5ft - =10.82m ### j) Vertical clearance (5mimim) - 114v 6m, 720kV 16m ### k) Widening of inve - * provided when Radius ≤ 300m. - *Mechanical = - L2 - 2R - L=length of - wheel bax - (6 or 6.1m) - * Psychological = V - 9.5R,n=no. Ilanes ### 1) zebra gring white & black ## About 5cm ciggregate is used in bore coune couse. While 1.25 cm in wearing. * Mastic astri asphalt layer requires no rolling Compaction). ## 2. Geometric design ## 2.1 Basic Design control 1. Design whed load 2. Sub grade soil 3. Gimatic factor 4. Parement component material 5. Environmental factors. ## 2.2 Element of cross section ### a) Bus bays : 75m away bom intersection. - 5:1 tapering for deceleration - 15m standing space per bo wiath, min 3m, prefer 3.75m - Merging taper 3:1. - Intepection को departure side DAT provide गर्ने । ### b) Carriage way - Single lane - = 3.75m - upto 3m in difficult - Intermediate - =5.5m - Multilane, lane width = 3.5m ### c) (amber - cross slope - camber should never be less than 50% of gradient. - The camber for shoulder should be 0.5% Steeper on spaight sections. - Min-3% & max-5%. & earth - Parabolic camber for is ideal for fast moving rehide. ### d) Types of camber 1. sloped camber / straight lined for cement concrete road. 2. Parabolic camber 3. composite camber (best) 4. Negative camber edge is higher than centa - eement concrete Bitumen Goard Earth - Pavement→ - Camber→ - (%) - 1.5 to 2 - 2.5 - 4 - 5 ## Formation width - carriage way + shoulder - Top width of embankment - Bottom width of cutting - Exclude drainages ## f) Formation level - RIL ## g) Foot path - side walk / foot way - Min. width=1.5m (upto 500) - Designed for hourly volume of 15 minutes peak period. - Max. width=3m (2500-3000) - for narrow footpath (<1.8m) - passin zone of 1.8m & length 2m is provided CK 50m fon Wheelchair. ## h) kerb - ⅰ) Right of way - National highway - Feeder - District - 50 m - 30 m - 20 m ## j) Road way width - carriage way + 2x shoulder + Separators ## k) Shoulder - Minimum 0.75m - on either side. - 0.5-0.75m of strip near parement should be impervios. - Color & texture different from Carriage way. - shoulder > 3.75m are undesirable - Class I - Class Ⅱ - Class Ⅲ - Class IV - 3.75 - 2.5 - 2 - 1.5 ## d) Spoil bank, drainage etc. ## 2.3 Honzontal Curve - R= 0.0079 V2 - etf - R= - V2 - , - 12f(e+f) - fa 1 - Smoothnen ## * A summit cune is parabola: * A valley cume is two bansition Curve with no circular in beth. ## 2.4 Super Elevation, sight distances & gradient ## 2.4.1 Super elevation → Cant or banking → etf = B 2 V2 GR → Max = 127R - 7% in plain & rolling - 10% in Rolling hill (no snow) - 7% in snow bound areas → Minimum = camber % → Rate of change of outer edge should be less than 1:150 in plain & rolling. & 1:60 in & mountain. in comparision with the grade of centeline. ## Minimum. →28SSD(2 way) - single lane - Multi-1XSSD - - Date - (1) way) ## 2.4.2 Sight distance ### a) Stopping sight distance - 3.6 254$ → Non-stopping sight distance → In down slope Vinhoñzontal. * Depends on - Height of driver's eye above Surface 1.2m - Ht. of object on road 0:15m - speed of vehicle - Features of road - Speed - 20 - 30 - 40 - 60 - 80 - 1100/120 - distance(m) - 20 - 30 - 50 - 80/130 - 190/260 ### b) Overtaking sight distance - Driver eye Jo 1.2 m from road - Objent - Speed - 40 - 60 - 80 - 100 120 - distance - 165 - 300 - 490 - 640 - 880 ### c) Overtaking zone - Single lane - 2x OSD - Multi Jane - → 3x os I f length. ## d) Safe sight distance at intersection - sight brangle - Spacing - Min. 1.2m width - → sight briangle is kept during. overtaking. ## 2.4.3 Gradient - Pise or fall. wir.thorizontal. - Hill - Plain - Ruling - 1:20 - 1:30 - Limiting (max - 1:15. - 1:20 - Exceptional - 1:2 - 1:15 - Min - 1:1:00 for osच्चा drain - 1:200 for inferior dreios - 1.500 for concrete → Exceptional gradient + 60m per km. → Floating gradient is generally provided at summit cune. →The rise or fall in excess of floating gradient is called ineffective rise or ineffective fall. - Speed - 201301401 61 80 100/12 - max. gradient - 12 - (%) - 2.5 NRS 2070 ## 2.5. Transport unit | Class | Vehicle | |---|---| | | Bicycle, motorcycle | | | Car, auto rickshaw, SUV, Light van & pick up | | | Light mini truck, bactor Rickshaw | | | Truck, bus, mini bw, backtor with baiker | | | Non-motorized carns | ## 2.5.2. Road classification | **Administative** | **Technical** | |---|---| | (21) | 1. Class I | | National highway | 2. class II | | DOR SRN | 3. class Ⅲ | | { | 4. class I | | Feeder read (208) | | | 3. District road | | | DOLIDAALRN & | | | 4. Urban road | | | local 60 kmph, ADTL 2000 | | | collector ← 80 kmph, ADT 2000~5000 | | | amerian K → 100kmph, ADT 5000-20,000 | | | 120kmph: Express ways, ADT>20,000 | | ## 2.5.3. Carriage way ## 2.5.4 vehicle dimension - Width - 2.5m - height - 4.75m. - length - 18m, - axle load - 100 KN ## 2.5.5 Terrain classification | (%) | (degre) | |---|---| | 0 to 10 | 0-5.7 | | 10 to 25 | 5.7-14 | | 25t060 | 14-31 | | >60 | >31 | ## 2.5.6 Design speed | Class | Plain | Rolling | Hill | steep | |---|---|---|---|---| | 1 | 120 | 100 | 80 | 60 | | Ⅱ | 80 | 60 | 40 | 30 | | Ⅲ | 80 | 60 | 40 | 30 | | 14 | 60 | 40 | 30 | 20 | ## 2.5-7 Sight distance ## 2.5.8 Shoulder coldth min. 0.75m on eithor ## 2.5.9 Camben ## 2.5.10 Right of way 750,30,20 ## Approximate correlation | Plain & rolling | Ma | S | |---|---|---| | National highways | ۱۱ | ۱۱ | | Feeder road | ۱۱, ۱۱۱ | ۱۱۰ | ## .5.11 Specification of hair pin bend in Hill road. a) Minimum design speed - 20 kmph b) Minimum radio of curvature - 15m c) Min length of pansition came - 15m d) Max. longitudinal gradient - 4% e) Max. Super eleration - 10% f) Min dist beth 2 bends - 60m ## 2.5.12 Lael of senice (LOS) → Qualitative measure * LOS are!- 1. LOS A - Free flow 2. LOS B - Steady 3. 105 - steady but limited 4. LOSED - Steady at highh 5. LOS E - Saturation 6. LOS F - Congestion LOS B is adopted for design. capacity of roads in Nepal. →At LOSB, volume of baffic = 45% of maximum capacity under mixed condition ## 2.5.13 Road Hump - Only provided in Cass IV rood (speed 230 kmph) - Bs some urban area of their necessity is jomfied. - width = 3.7m, height = 0. Im at crocon parabolic shepё. - The faces is painted with 45° inclined 20mm wide altermate black & white strips. ## Same as driver eye ht - Page: - Date: / - 1 - * Min width of bicycle = 1.2m for each dir - * Lend of illumination = 30 Lux on high speed roads & 15 lux on other main road. - * In Nepal, forward period (Perspective period) = 20 years. ## 2.6 Traffic signs. ### a) Regulatory /Mandatory :- - Circular shape. - stop sign (900x900mm) octagonal हुन्छ - Give way sign (equilateral triangle) (स्मान्नै पर्ने) - STOP - GIVE WAY/900mm ### b) Waming (cautionary sifn:- ### c) Informatory sign :- - Illam Kut - ↑ - → - 450 m ## 2.7 Parking Study - 9) Parallel parking. - b) Perpendialar - © 45° angle - d) 75° angle ## 2.8 Road Marking - a) longitudinal lines = 10cm wides - b) Transverse line visible by ser - c) Parement marking generally white - panking restrictions, continuos centre line. - & barrier line markings - →Fellow ## 2.9 Expected life of road 1. WBM (single coat) 2. Surface dressing (single cost) 3. Premix bituminuos carpet 4. Sheet asphalt surfacing 5. Sheet asphalt 6. All concrete roads - 2yrs - 3 years - 8 - 8-15 - 15 - 25-40 ## 2.10 Intensity & suitability of road.. | Intensity | road | |---|---| | <160 Ton/m/day | - Earth, Graved, Mooram Kankar, Sta | | 160-330 | - WBM, 15cm PLC | | 330-500 | - Surface creased (2 coat) Bitminos. | | 560-1450 | - 15cm PCC+ bituminon cap | | 1400-3500 | - Bitaminow grouted macadam, RCC | | 3500-5000 | - Sheet asphalt, Re 20cm RCC | | | - 22.5 RCC + hard stone perement | - - Spacing during overtaking - - driver's eye - - bicyde lane - - GWT below subgrade - - 1.2m - Page: - Date: / - 1 ## 2.11 Percentile 1. 98th - Design speed 2. 85th - Upper speed limit for regulation 3. 75th - Tooer Safe Speed on highway 4. 15th - Locoer Speed limit for regulation. ## 3 Drainage system Requiement : - surface water from adjoining land should be prevented from entering highnes. * Case way is also known as. Submersible bridge. * In cutting, drains are pronided on both sides. * Highest level of AWT should be below subgrade by minimum 1.2m. ## 4. Road a) Subgrade - should be 60 cm abore HAL. b) Capping layer abone subugrade to Strengthen it. c) Sub-base - min thicknes - = 200m3 d) Base coune - " - = 150 mm e) surface course →→ - " - - 20 mm. (5 cm al)) ## 4.1.1 Aggregate test 1. Crushing test - Compression testing machine 2. Abrasion test - Los Angeles 3. Impact test - Impact rare tester / page testig 4. Soundness test - कोटेसो पातले item (D0000 5. Shape testit 6. Bitument adhesion test 7. Sp gr & water alorrorption test→ ## 4.1.2 Bitumen test - 1. Penetration test - hadness or softness - 10.6% max (Pensky - Martens - (Escond - apparates) - 2 - Jent brigute - 2. Ductility test - elongation (2372) - 8. - office - ↑ Flash & fire point - ype Viscometeor - 3. Viscosity test - थोपा थोपा - gives result - 4. Float test (when en sitios de muitable - In second - (for 50m) - viscometer & prot - ↓ - apperates) - Solubility test→ヤリ - ($0.2% - byut - Dareuitable) - 10., Loss on heating↓ - 5. Sp. gr. test (0.97-102) - -4mm antice - 6. Softening point test - at 2500 - → Ring & ball apparatus, 500/min - temip at which bitument attains partialar degree of softening test ## 4.2 Road Macherieños al Cleaning ground 1) Dozer 11. Bull Dozer 111) Angle Dozer IV) Tree Dozer v) Tractor (chain & roller/wheel) vi) Scraper (cutting edge, Scroop) :)) Rooter or rippon b) Cutting & embankment ⅰ) Dozer ⅱ) Shovel for hard soil ⅲ) Plough v) Tractor vⅵ) Trundle altter - • Expanding ballost. - Truck, crusher, expanding machine - Roller - d) Bitumen & ballast mixing machine. - ⅰ) Bitumen boiler ;ⅱ) Bitumen sprayer - ⅲ) Bitumen mixer & spreader - e) Concrete mixing machine - Grader - g) Compaction machine - Roller घ्छ Suitability a) Bull dozer - shallow excavation b) Scraper - shallow excavation, dig, haul & discharge in uniform layer of soft soil. c) Power shovel - shallow excavation (Stoff soil) d) Dragline - Excavation lower than existing pred (Soft & medium Sil) - Clampshell - → - " - رد - Excavation below GL D Hoe ## g) Roller - compaction - Smaller grea 4) Rammer - ⅰ) Vibrator-dy - Granular soil compaction ⅰ) Watering ⇒ cohesion len "" k) Grader - - levelling 1) Bitumen heating device (decanter) m) Bitumen distributor (5) Aggregate spreader ## 4.3 Road maintenance & repair ### a) Routine - Localized nature. - Required in any road, - Done by length worker or forced account - Labour contract - Material मा ८खालै खर्च नहुने । ### b) Recurrent - Regular internal - 10 calized nature - अलि खर्यालु। ### c) Periodic - 6 yean in Blacktopped & 4 years in pared - खर्चालु काम ### d) Specific maintenance - for specific location - Resurfacing - Restoration - Rehabilitation }3R of read Page: Date: / 1 ### e) Rehabilitation - when maintenance cost > 50% of road construction cost - Reconstructed. ### f) Emergency - Disaster of 10 yen ## 4.4 Different types of failures a) Crazing - zig zag cracking b) Scanfying - loosening of top surface by mechanical meary c) Picking - " - by ippenck pick axte axe d) Foretting - Failure from top by binding - failure e) Revelling - Failure from top by abrasion & attrition. f) Rut - depression, longitudinal or transvone Cross rut g) Reel - Raised portion beth adjacent rits h) Pot hole - Commonest) (Chauckhole) * Routine maintenance in graved learthern. * Reciment " tus bituminos roade ⅰ) Volatization & oxidation of binder make surface brittle. ## 4.5 National Highways (Total -21) | By road→ | Highway | km | |---|---|---| | H03 | Tribhuvan highway | 102fkm | | 402 | Mahendra " " | 160 km (189-29) | | 404 | Arniko " " | 113 km (Mallighr-kodari) | | 405 | Prithivi " " | 173km (Naubise-Polchana) | | 406 | Narayanghat-Muglin | 36km | | 407 | Dhulikhel-sindhuli | 208 km | | | BP. Highway | 158 km (Banepa-Bording) | | | Mechi " " | 891 km (268+123) Gharila | | | Koshi " " | 159 km Rani border-Mayankung | | | Sagarmatha | 265 km Kadamaha-Soflusalon | | | Siddhath " " | 28182 km Sunauli Poblare, | * The DHQ not connected with highway is Humla (PY 073/74) →Connected to National road network in 2020 december. ## 5 Bridge ## 5.1 Components of bridge 1. Foundation - (Open, pile or well) 2. Substructure - (Albutment & stem) below deak 3. Super structure - (Plate girder, Orass girder, deck slab, foot path, railing, kerb, drainage prout etc) ## 5.2 Suitability of Bridge. 1. Solid slab bridge - Span upto 8m 2. Deck girder bridge - Span 10 to 20 3. T-beam bridge. - Span 10 to 25 (cast monolithically) 4. Balanced cantilever - span upto 25m. bridge... ## 5.3 Trail bridge - Trails are non-motorable road. Bridge on such bail are trailbridge. Types!- 1) Steel truss bridge 11) Twin bridge. (111) Suspended bridge 1: 14) Suspension bridge - No tower - Walk width, 70cm & - 100 cm - Economical - Later one - Tower support cable - 106 cm - Zwalkway - Expensive. (20-25% more than suspended) - Ancient one - (18th century) - (Fan) - (Harp) - Page - Date: / - 1 - Suspero - Cable stayed ## 5.5 Karnali bridge. - Asymmetric, single tower, cable stayed bridge. - 500m length. - longest of its type in Nepal. - second longest in Asia. - Made by Japan - Inagurated by G. P. koirala. - Lonneus Kailali & Bardiya. - (Resalki stees) * longest bridge under construction = 1.15 km : (121 span होस) * Kankai मा 703 m., Mechi 583 m (20m lougestsan) (560m dd) ## 6. Otta Scal - for maintenance of low volume paffic roads. - It provides durability, imperiobness, skid resistance ete. - Used in tempory & less important road. a) Single os - 29-11 yn b) Double OS - 712-15yb - It consists of 16-32mm thick bituminon surfacing of graded aggregate placed on a relatively thick film of comparatively soft binder which on rolling & Dafficking can work its way upwards through the aggregate interstices.. - Bitumen sed is grade 150/200 or MC 3000 or MC800 cutback. - Max size of aggregate used in otta seal is 16mm but 19 mm can be accepted in first seal where double is provided. - The amount of fines (<0.075) should be less than 10% but can be accepted wato 15% * Min length of transition curve in plain = 2.72 R * " " " in steep tahittv2 R * Traffic studies a) Traffic volume study → Counting → No. of vehicles crossing in particular instant → density x speed b) Speed studies -spot speed study - speed of a vehicle -Speed & delay study - average of as c) Origin & destination study. - to plan the road network & facilities - to plan the schedule of different modes of transportatπος. - Moving car ofserne method - to plan - ↳ paffic capacity - Page: - Date: / - 1 - gins basic data for determining desire lines. - to locate: new bridge so perdemand Methods:- i) Roadside intervies, 1ⅱ) Licence plete method, iii) Return part card method is) Tagontar nettod ⅴ) Home interview method. d) Traffic flow studies characteries *basic paftic manoeures are diverging, merging & crossing. - D - M - C - weaving = small angle cross, - diverging & maging & - diverding at same place. e) Traffic cepacity study f) Parking study g) Accident studies or the ton ffic fire #Bidge: 1) - Deck type - Through type 3) AN - semi through - type

Use Quizgecko on...
Browser
Browser