This document provides a snapshot of the Indian power sector as of November 2024. It details total installed capacity, generation capacity, fuel-wise breakdown, and key policy initiatives. Performance data, including generation targets and plant load factors, is also included.
Full Transcript
Power Sector at a Glance "ALL INDIA" Source: OM SECTION 1.Total Installed Capacity (As on 30.11.2024)- Source : Central Electricity Authority (CEA) Installed Generation Capacity (Sect...
Power Sector at a Glance "ALL INDIA" Source: OM SECTION 1.Total Installed Capacity (As on 30.11.2024)- Source : Central Electricity Authority (CEA) Installed Generation Capacity (Sectorwise) as on 30.11.2024 : Installed Capacity % Share in Sector (MW) Total Central Sector 1,04,453 22.9% State 1,08,330 23.7% Private Sector 2,43,974 53.4% TOTAL 4,56,757 Installed Generation Capacity (Fuelwise) as on 30.11.2024 : Installed % Share in Category Generation Total Capacity (MW) Coal 2,11,030 46.2% Fossil Fuel Lignite 6,620 1.4% Gas 24,818 5.4% Diesel 589 0.1% Total Fossil Fuel : 2,43,057 53.2% RES (Incl. Hydro) 2,05,521 45.0% Hydro 46,968 10.3% Wind, Solar & Other RE 1,58,552 34.7% Non-Fossil Fuel Wind 47,959 10.5% Solar 94,168 20.6% BM Power/Cogen. 10,728 2.3% Waste to Energy 613 0.1% Small Hydro Power 5,084 1.1% Nuclear 8,180 1.8% Total Non-Fossil Fuel : 2,13,701 46.8% Total Installed Capacity 4,56,757 100% (Fossil Fuel & Non-Fossil Fuel) Policy Initiatives / Decision Taken Electricity Act 2003 has been enacted and came into force from 15.06.2003. The objective is to introduce competition, protect consumer’s interests and provide power for all. The Act provides for National Electricity Policy, Rural Electrification, Open access in transmission, phased open access in distribution, mandatory SERCs, license free generation and distribution, power trading, mandatory metering and stringent penalties for theft of electricity. It is a comprehensive legislation replacing Electricity Act 1910, Electricity Supply Act 1948 and Electricity Regulatory Commission Act 1998.The Electricity Act, 2003 has been amended on two occasions by the Electricity (Amendment) Act, 2003 and the Electricity (Amendment) Act, 2007. The aim is to push the sector onto a trajectory of sound commercial growth and to enable the States and the Centre to move in harmony and coordination. Performance of Generation from all Sources 1.0 Performance of Electricity Generation (Including RE) 1.1 The electricity generation target (Including RE) for the year 2024-25 has been fixed as 1900 Billion Unit (BU). i.e. growth of around 9.3% over actual generation of 1738.828 BU for the previous year (2023-24). The generation during 2023-24 was 1738.828 BU as compared to 1624.465 BU generated during 2022-23, representing a growth of about 7.04%. 1.2 Total Generation and growth over previous year in the country during 2009-10 to 2024-25 :- Total Generation Year % Growth (Including Renewable Sources) (BU) 2009-10 808.498 7.56 2010-11 850.387 5.59 2011-12 928.113 9.14 2012-13 969.506 4.46 2013-14 1,020.200 5.23 2014-15 1,110.392 8.84 2015-16 1,173.603 5.69 2016-17 1,241.689 5.80 2017-18 1,308.146 5.35 2018-19 1,376.095 5.19 2019-20 1,389.102 0.95 2020-21 1,381.855 -0.52 2021-22 1,491.859 7.96 2022-23 1,624.465 8.89 2023-24 1,739.091 7.06 2024-25 * 1,238.155 5.26 * Upto November, 2024 (Provisional), Source : CEA(, 201 1.3 The electricity generation target for the year 2024-25 was fixed at 1900 BU comprising of 1444.943 BU Thermal; 147.709 BU Hydro; 55.348 Nuclear; 8 BU Import from Bhutan and 244 BU RES (Excl. Large Hydro). 2.0 Plant Load Factor (PLF): 2.1 The PLF in the country (Coal & Lignite based) from 2009-10 to 2024-25 is as under: All India PLF Sector-wise PLF (%) Year (%) Central State Private 2009-10 77.5 85.5 70.9 83.9 2010-11 75.1 85.1 66.7 80.7 2011-12 73.3 82.1 68.0 69.5 2012-13 69.9 79.2 65.6 64.1 2013-14 65.60 76.10 59.10 62.10 2014-15 64.46 73.96 59.83 60.58 2015-16 62.29 72.52 55.41 60.49 2016-17 59.88 71.98 54.35 55.73 2017-18 60.72 72.38 56.90 55.34 2018-19 61.07 72.64 57.81 55.24 2019-20 55.99 64.21 50.24 54.64 2020-21 54.51 63.40 46.23 54.66 2021-22 58.87 69.71 54.50 53.62 2022-23 64.15 74.67 61.86 56.64 2023-24 69.09 75.09 64.70 67.65 2024-25 * 69.47 74.61 63.99 69.85 * Upto November, 2024 (Provisional), Source : CEA(, 2017) 3.0 Power Supply Position The power supply position in the country during 2009-10 to 2024-25 : Energy Peak Surplus (+) / Maximum Surplus (+) / Year Requirement Availability Peak Demand Deficits (-) Demand Met Deficits (-) (MU) (MU) (MU) (%) (MW) (MW) (MW) (%) 2009-10 8,30,594 7,46,644 -83,950 -10.1 1,19,166 1,04,009 -15,157 -12.7 2010-11 8,61,591 7,88,355 -73,236 -8.5 1,22,287 1,10,256 -12,031 -9.8 2011-12 9,37,199 8,57,886 -79,313 -8.5 1,30,006 1,16,191 -13,815 -10.6 2012-13 9,95,557 9,08,652 -86,905 -8.7 1,35,453 1,23,294 -12,159 -9.0 2013-14 10,02,257 9,59,829 -42,428 -4.2 1,35,918 1,29,815 -6,103 -4.5 2014-15 10,68,923 10,30,785 -38,138 -3.6 1,48,166 1,41,160 -7,006 -4.7 2015-16 11,14,408 10,90,850 -23,558 -2.1 1,53,366 1,48,463 -4,903 -3.2 2016-17 11,42,929 11,35,334 -7,595 -0.7 1,59,542 1,56,934 -2,608 -1.6 2017-18 12,13,326 12,04,697 -8,629 -0.7 1,64,066 1,60,752 -3,314 -2.0 2018-19 12,74,595 12,67,526 -7,070 -0.6 1,77,022 1,75,528 -1,494 -0.8 2019-20 12,91,010 12,84,444 -6,566 -0.5 1,83,804 1,82,533 -1,271 -0.7 2020-21 12,75,534 12,70,663 -4,871 -0.4 1,90,198 1,89,395 -802 -0.4 2021-22 13,79,812 13,74,024 -5,787 -0.4 2,03,014 2,00,539 -2,475 -1.2 2022-23 15,13,497 15,05,914 -7,583 -0.5 2,15,888 2,07,231 -8,657 -4.0 2023-24 16,26,132 16,22,020 -4,112 -0.3 2,43,271 2,39,931 -3,340 -1.4 2024-25 * 11,50,795 11,49,512 -1,282 -0.1 2,49,856 2,49,854 -2 -0.001 * Upto November, 2024 (Provisional), Source : CEA( Total Generation (Including Renewable Sources) (In Billion Units) 1739.1 1,800 1624.5 1,600 1491.9 1376.1 1389.1 1381.9 1,400 1308.1 1241.7 1173.6 1,200 1110.4 1020.2 1,000 928.1 969.5 805.4 850.4 800 600 400 200 0 2009-10 2010-11 2011-12 2012-13 2013-14 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2014-15 Growth in Total Generation (%) 10.00 9.14 8.89 8.84 7.96 8.00 7.15 7.06 5.59 5.69 5.80 6.00 5.23 5.35 5.19 4.46 4.00 2.00 0.95 0.00 -0.52 -2.00 2009-10 2010-11 2011-12 2012-13 2013-14 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2014-15 भारत सरकार Government of India विद्यत ु मंत्रालय Ministry of Power केन्द्रीय विद्यत ु प्राधिकरण Central Electricity Authority Executive Summary on Power Sector November-2024 Executive Summary for the Month of November-2024 Contents SN Section A - Highlights of Power Sector Page 1 Electricity Generation 1A & 1B 2 Generating Capacity Addition 2 3 List of Projects Commissioned 3 4 All India Installed Capacity (MW) Region-wise 3 5 All India Installed Capacity (MW) Sector-wise 4 6 Transmission Lines Added during the month 5 7 Transformation Capacity Addition 6 8 Power Supply Position (Energy & Peak) 7 9 Peak Shortage of Power Supply (MW) in Different Regions 8-9 10 All India PLF Sector-wise 10 11 Trend of T & D and AT & C Losses (%) 12 All India Village Electrification Status 11 13 Average cost of Power & Average Realisation 14 All India Coal consumption for Power Generation (MT) Section B - Capacity Addition Capacity Addition Targets and Achievements in 12th Plan(2012-17), 2017-18 , 2018-19 ,2019-20, 2020-21 1 12 and 2022-23 2 Capacity Addition Targets & Achievements during Nov-2024 and Apr-24 to Nov-24 13 3 Installed Capacity in various Regions including their shares. 14-19 Section C - Transmission Lines 1 Executive summary of Target and Achievement of Transmission Lines during 2023-24 20(1) 2 List of Transmission Lines Commissioned in the month. 20(2) Section D - Substation 1 Executive summary of Target and Achievement of Substations during 2023-24 21(1) 2 Sub Stations (220 kV and above) commissioned/Ready for commissioning in the month. 21(2) Section E - Electricity Generation 1 Electricity Generation (MU) Targets and Achievements for 2023-24 22 Section F - Power Supply Position 1 Energy Power Supply Position (Provisional) for the month. 23 2 Peak Power Supply Position (Provisional) for the month. 24 3 Energy Power Supply Position (Revised) for Oct-2024 and during Apr-24 to Oct-24 25 4 Peak Power Supply Position (Revised) for Oct-2024 and during Apr-24 to Oct-24 26 5 Power Supply to Agricultural Sector during Nov-2024 27 6 Power Supply Position since 2003-04 (Energy Requirement / Availability) 28 7 Graph for Energy Requirement, Availability(BU) & Shortages (2003-04 to 2023-24) 29 8 Power Supply Position since 2003-04 (Peak Demand / Peak Met) 30 9 Graph for Peak Demand, Peak Demand Met(GW) & Shortages (2003-04 to 2023-24) 31 Section G - Growth of Power Sector 1 Growth of Rural Electrification & Pump Sets Energisation 32 2 Growth of Installed Capacity since 6th Plan(1980-85) 33 3 Growth of Transmission Sector since 6th Plan(1980-85) 34 4 All India Yearly Coal consumption for Power Generation (Utilities) 5 All India Annual Per Capita Consumption of Electricity since 2006 35 6 Average cost of power supply & Average realisation (Paisa/kWh) Section H - Rate of Sale of Power 1 Rate of sale of power for the year 2021-22 35-47 2 Outstanding dues of Power Utilities Payable to CPSUs. 48 ABBREVIATION Sr.No Short Form Full Form 1 Ach Achievements 2 ACS Average Cost of Supply Average Revenue 3 ARR Realization Aggregate Technical 4 AT&C and Commercial 5 BU Billion Units Central Electricity 6 CEA Authority 7 CKMs Circuit Kilo Meters Central Public Sector 8 CPSUs Undertakings Damodar Valley 9 DVC Corporation High Voltage Direct 10 HVDC Current Transmission Independent Power 11 IPP Producer 12 IR Inter Regional 13 kV Kilo Volts 14 kWh Kilo Watt Hours 15 MT Million Tonnes 16 MU Million Units 17 MVA Mega Volt Ampere 18 MW Mega Watt 19 NA Not Applicable 20 PLF Plant Load Factor Renewable Energy 21 RES Sources State Load Dispatch 22 SLDC Centre Transmission and 23 T&D Distribution 24 UTL. Utilities 25 w.r.t With Respect To Section A - Highlights of Power Sector for November 2024 SN Contents Page 1 Electricity Generation 1A & 1B 2 Generating Capacity Addition (MW) 2 3 List of Projects Commissioned 3 4 All India Installed Capacity (MW) Region-wise 3 5 All India Installed Capacity (MW) Sector-wise 4 6 Transmission Lines Added (Ckms) 5 7 Transformation Capacity Addition (MVA) 6 8 Power Supply Position (Energy & Peak) 7 9 Peak Shortage of Power Supply (MW) in Different Regions 8-9 10 All India PLF Sector-wise 10 11 T & D and AT & C Losses (%) 12 All India Village Electrification 11 13 Average Cost of Power & Average Revenue Realisation 14 All India Coal Consumption for Power Generation (MT) 1. Electricity Generation for Nov-2024 (BU) Achievement Targets Achievement* % Change of Type Achievement Nov-23 Nov-24 Nov-24 w.r.t. Nov-2023 Thermal 103.67 112.41 104.17 0.48 Nuclear 4.42 4.43 4.80 8.55 Hydro (Large) 6.62 9.02 8.61 29.97 RES including SHP 13.67 15.94 15.90 16.32 Bhutan Import 0.02 0.68 0.22 1239.09 All India 128.40 142.48 133.70 4.13 *Provisional ` 136.00 133.70 134.00 132.00 BU 130.00 128.40 128.00 126.00 124.00 Nov-23 Nov-24 45597 1.1 Electricity Generation During Apr-23 to Nov-23 & Apr-24 to Nov-24 (BU) Type Apr-23 to Nov-23 Apr-24 to Nov-24* % Change w.r.t Apr-23 to Nov-23 Thermal 875.30 908.44 3.79 Nuclear 31.99 37.90 18.48 Hydro (Large) 108.59 117.64 8.34 RES including SHP 155.30 168.86 8.73 Bhutan Import 4.66 5.31 13.90 All India 1,175.84 1,238.15 5.30 *Provisional 1,400.00 1,238.15 1,175.84 1,200.00 1,000.00 800.00 BU 600.00 400.00 200.00 0.00 Apr-23 to Nov-23 Apr-24 to Nov-24* 1A Electricity Generation (including Hydro) (in BU) Nov-2024 Nov-2023 % Growth Growth in Growth in Growth in Conventional Conventional Renewable Sources Total* Renewable Sources Total Conventional Renewable Total Sources Sources Generation Generation Generation 117.80 15.90 133.70 114.73 13.67 128.40 2.67 16.32 4.13 Electricity Generation (including Hydro as RES) (in BU) Growth in Growth in Growth in Conventional Conventional Renewable Sources Total* Renewable Sources Total Conventional Renewable Total Sources Sources Generation Generation Generation 109.19 24.51 133.70 108.11 20.29 128.40 1.00 20.78 4.13 All India Generation From Renewables (All Figures are in BU) Source-Wise All India Sl.No. Generation from For the Month of Cummulative for the period Renewables Oct-2024 Oct-2023 Apr-24 to Oct-24 Apr-23 to Oct-23 1 Wind 3.24 3.55 59.13 61.17 2 Solar 12.26 10.22 80.19 67.90 3 Biomass 0.34 0.27 2.02 1.95 4 Bagasse 0.17 0.18 1.84 2.31 5 Small Hydro 1.46 0.97 8.10 6.72 6 Others 0.25 0.23 1.69 1.58 Total : 17.70 15.41 152.96 141.63 Note: 1) All figures are Actual 1B 2. Generating Capacity Addition for November-2024 (MW) Achievement Targets Achievement* Type % Achievement w.r.t. Nov-2023 Nov-23 Nov-24 Thermal 0 1320 0 NA Hydro (Large) 30 153.33 0 NA RE (including SHP) 566.08 Not Available 2305.31 307.24 Nuclear 0 0 0 NA All India 596.08 1473.33 2305.31 286.75 NA- Not Applicable *Provisional 2500 2305.31 2000 1500 1000 596.08 500 ## 0 All India Nov-23 Nov-24 Generating Capacity Addition(MW) during Apr-23 to Nov-23 & Apr-24 to Nov-24 April-2023 to April-2024 to Nov- % Change w.r.t Nov-2023 2024* Previous Year Thermal 2024 -190 NA Hydro (Large) 30 40 NA RE (including SHP) 7,538.71 14907.9 97.75 Nuclear 700 0 NA All India 10292.71 14727.9 43.09 NA- Not Applicable *Provisional 16000 14727.90 14000 12000 10292.71 10000 8000 6000 4000 2000 0 April-2023 to Nov-2023 April-2024 to Nov-2024 3. List of Projects Commissioned During Nov-2024 1 Thermal NIL 2 Hydro(Large) NIL 3 Nuclear NIL 4. All India Installed Capacity (MW) Region-wise as on 30-11-2024 Fossil fuel based Non-Fossil fuel based Thermal Nuclear Hydro(Large) RES** Grand Total Region Coal Lignite Gas Diesel Total Northern 56657.95 1580 5994.96 0 64232.91 1620 20829.76 43068.08 129750.75 Western 74662.64 1400 10806.49 0 86869.13 3240 7562.50 55199.73 152871.36 Southern 49415.02 3640 6271.8 433.66 59760.48 3320 11867.48 57336.32 132461.3 Eastern 29051.87 0 80 0.00 29131.87 0.00 4764.42 2292.96 36012.24 North-East 1242.02 0 1664.96 36.00 2942.98 0.00 1944.01 615.19 5502.18 Islands 0 0 0 119.54 119.54 0.00 0.00 40.13 159.67 ALL INDIA 211029.5 6620.00 24818.21 589.20 243056.91 8180.00 46968.17 158552.41 456757.49 % of Fossil sources in IC 53.21 % of Non Fossil sources in IC 46.79 45597 Total= 456757.49 500000.00 456757.49 450000.00 400000.00 350000.00 300000.00 243056.91 250000.00 200000.00 158552.41 150000.00 100000.00 46968.17 50000.00 8180.00 0.00 Thermal Nuclear Hydro RES Total 3 5. All India Installed Capacity (MW) Sector-wise as on 30-11-2024 Sector THERMAL Nuclear Hydro(Large) RES* Grand Total Coal Lignite Gas Diesel Total State 69977.5 1150 7012.06 280.31 78419.87 0 27294.45 2616.12 108330.44 Private 73032 1830 10568.24 308.89 85739.14 0 3931 154303.99 243974.13 Central 68020 3640 7237.91 0 78897.91 8180 15742.72 1632.3 104452.93 All India 211029.5 6620 24818.21 589.2 243056.91 8180 46968.17 158552.41 456757.49 *RES as on 30.11.2024 All India Installed Capacity(MW) (Sector-Wise) Central, 104452.93 State, 108330.44 , 23% , 24% State 108330.44 Private 243974.13 Private, 243974.13 , 53% Central 104452.93 State Electricity Generation (MU) Targets and Achievements for 2016-17 Private Central 4 6. Transmission Lines Added during Nov-2024 (Ckms) Voltage Level Nov-23 Nov-24 +/- 500 KV HVDC 0 0 +/- 800 KV HVDC 0 0 765 KV 0 0 400 KV 142 0 220 KV 676 355 All India 818 355 900 818 800 700 600 Ckms 500 400 355 300 200 100 0 All India Nov-23 Nov-24 Transmission Lines Added during Apr-23 to Nov-23 &Apr-24 to Nov-24 (Ckms) Voltage Level Apr-23 to Nov-23 Apr-24 to Nov-24 +/- 500 KV HVDC 0 0 +/- 800 KV HVDC 0 0 765 KV 1660 918 400 kV 2731 2078 220 KV 3453 2121 All India 7844 5117 9000 7844 8000 7000 6000 5117 5000 CKMS 4000 3000 2000 1000 0 All India Apr-23 to Nov-23 Apr-24 to Nov-24 5 7. Transformation Capacity Addition During Nov-2024 (MVA) Voltage Level Nov-23 Nov-24 +/- 800 KV HVDC 0 0 +/- 500 KV HVDC 0 0 +/- 320 KV HVDC 0 0 765 KV 0 1500 400 KV 1500 2200 220 KV 1940 1840 All India 3440 5540 5540 6000 5000 4000 3440 MVA 3000 2000 1000 0 Nov-23 Nov-24 Voltage Level Apr-23 to Nov-23 Apr-24 to Nov-24 +/- 800 KV HVDC 0 0 +/- 500 KV HVDC 0 0 +/- 320 KV HVDC 0 0 765 KV 4500 10500 400 KV 16740 16320 220 KV 11721 11985 All India 32961 38805 74520 38805 MVA 32961 0 1 Apr-23 to Nov-23 Apr-24 to Nov-24 6 8. Power Supply Position (Energy & Peak) in Nov-2024 Energy (MU) Region Surplus(+) /Deficiet (-) in % Requirement Availability Nov-2023 Nov-2024 Nov-2023 Nov-2024 Nov-2023 Nov-2024 Northern 32,145 34,971 32,084 34,961 (-)0.2 0 Western 41,478 42,879 41,478 42,878 0 0 Southern 31,007 31,250 31,006 31,243 0 0 Eastern 13,340 13,563 13,289 13,562 (-)0.4 0 North Eastern 1,451 1,490 1,450 1,490 0 0 All India 1,19,421 1,24,153 1,19,308 1,24,134 (-)0.1 0 Power (MW) Region Surplus(+) /Not Met (-) in % Peak Demand Peak Met Nov-2023 Nov-2024 Nov-2023 Nov-2024 Nov-2023 Nov-2024 Northern 56,366 61,028 56,126 60,956 (-)0.4 (-)0.1 Western 73,288 72,959 73,288 72,959 0 0 Southern 57,208 53,838 56,925 53,831 (-)0.5 0 Eastern 23,216 25,883 23216 25,883 0 0 North Eastern 3,024 3,151 3,022 3,151 (-)0.1 0 All India 2,04,777 2,07,516 2,04,568 2,07,441 (-)0.1 0 * Nov-2024 Figures are Provisional 7 9. Peak Demand not met (MW) in Different Regions in November-2024 Chandigarh Delhi Haryana HP UT of J&K & Ladakh Punjab Rajasthan UP Uttarakhand Nov-2023 0 0 0 0 0 0 0 0 0 Nov-2024 0 0 0 0 0 0 0 0 0 400 NORTHERN STATES (MW) MW 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Chandigar Haryana HP UP UT of J&K Delhi Rajasthan Uttarakha Punjab & Ladakh nd h Nov-2024 Nov-2023 Chattisgarh Gujarat MP Maharashtra Daman & Diu & Dadra & Nagar haaveli Goa Nov-2023 0 0 0 0 0 0 Nov-2024 0 0 0 0 0 0 0 1 0 45597 0 WESTERN STATES (MW) 0 1 MW 0 0 0 0 0 0 0 0 0 0 0 0 0 Chattisgarh Goa MP Gujarat Daman & Diu & Maharashtra Dadra & Nagar haaveli Nov-2024 Nov-2023 AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep Nov-2023 0 0 0 1 17 2 0 Nov-2024 18 38 0 0 0 4 0 50 38 SOUTHERN STATE (MW) 18 MW 17 0 0 0 0 0 1 0 4 2 0 0 0 AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep Nov-2024 Nov-2023 AXIS TITLE 8 Bihar DVC Jharkhand Odisha West Bengal Sikkim A&N Island Nov-2023 262 0 0 0 0 0 8 Nov-2024 119 0 0 0 0 0 7 EASTERN STATES (MW) 200 119 MW 8 7 0 0 0 0 0 0 0 0 0 0 Bengal Odisha Bihar DVC Jharkhand A&N Island Sikkim West Nov-2024 Nov-2023 Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura Nov-2023 0 0 0 0 0 0 0 Nov-2024 0 30 0 0 0 0 0 50 (May 14 D.F.) April, 2018 - October,2018 NORTH-EASTERN Peak Demand Peak Met STATES ( MW ) ( MW ) (MW) 369 369 7016 7016 10270 30 MW 0 0 0 0 0 0 0 0 0 0 0 0 0 Mizoram Tripura Arunachal Assam Manipur Meghalaya Nagaland Nov-2024 Nov-2023 10. All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for Nov-2024 %PLF of Thermal Power Plants (excluding gas based power plants) Sector Nov-2023 Nov-2024 Central 72.91 73.62 State 61.69 59.04 Private Sector IPP 64.26 65.23 Private Sector UTL. 58.65 41.34 ALL INDIA 66.21 65.67 ALL INDIA THERMAL PLF-SECTOR WISE 73.62 80.00 72.91 65.23 65.67 64.26 66.21 61.69 59.04 58.65 60.00 41.34 40.00 20.00 0.00 Central State Private Sector IPP Private Sector UTL. ALL INDIA Nov-2023 Nov-2024 10.1 All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise 45597 ALL INDIA PLF MONTH-WISE 90 80 70 60 50 % 40 30 20 10 0 Jan Feb March April May June July August September October November December MONTHS PLF 2024* 10 11. T & D and AT&C Losses (%) 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 T&D Losses 22.84 22.77 21.81 21.42 21.04 20.66 20.46 20.73 19.27 AT&C Losses 22.62 25.72 23.98 23.56 22.31 21.64 20.73 22.32 16.23 * Provisional Note:.AT&C Losses are based in PFC report on performance of power utilities for the year and T&D Losses are based on General Review Annual Report. 12. All India Village Electrification Total Number of Villiages Electrified (Nos.) % Villages electrified inhabited Villages 597464 All inhabited villages as per census 2011 has been 100.00 electrified on 28.04.2018 Note: From the year 2004-05 onwards Definition of Village Electrification:- A village would be declared Electrified if i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality as well as Dalit Basti / hemlet where it exists. (For electrification through Non-Conventional Energy Sources a Distribution Transformer may not be necessary) ii) Electricity is provided to Public places like Schools, Panchayat Office, Health Centre, Dispensaries, Community Centres etc. and iii) The number of households electrified should be at least 10% of the total number of households in the village 45597 iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be obtained. 13. Average Cost of Power & Average Revenue Realisation Average cost of Average Revenue Gap ACS-ARR Year supply(ACS) Realization(paise/unit) (on subsidy (paise/unit) received basis) paise/unit 2013-14 519.03 441.31 77.72 2014-15 520.57 462.11 58.46 2015-16 530.57 482.55 48.02 2016-17 538.01 500.78 37.23 2017-18 550.06 519.81 30.26 2018-19 600.00 553.00 47.00 2019-20 614.00 585.00 29.00 2020-21 619.00 562.00 57.00 2021-22 Under Process 2022-23 14. All India Coal consumption for Power Generation (MT) 2013-14 489.4 2014-15 530.4 2015-16 545.9 2016-17 574.3 2017-18 608.0 2018-19 628.9 2019-20 622.2 2020-21 615.4 2021-22 697.3 2022-23 Under Process Section B - Capacity Addition SN Contents Page Capacity Addition Targets and Achievements in 12th Plan(2012-17), 2017-18, 2018-19 , 2019- 1 12 20, 2020-21, 2022-23 and 2023-24 2 Capacity Addition Targets & Achievements during Nov-2024 and Apr-24 to Nov-24 13 3 Installed Capacity in various Regions including their shares. 14-19 1. Capacity Addtion Targets and Achievements in the 12th Plan (2012-2017) onwards (i) Capacity Addition Target and Achievement for 12th Plan(2012 to 2017) (Figures in MW) (Figures in MW) Thermal Hydro Nuclear RE including SHP Total Target Ach Target Ach Target Ach. Target Ach. Target Ach. Central 14878 15869 6004 2584 5300 2000 Not Available NA 26182 20453 State 13922 22201 1608 2276 NA NA Not Available NA 15530 24477 Private 43540 53661 3285 619 NA NA Not Available NA 46825 54280 Total 72340 91730 10897 5479 5300 2000 Not Available NA 88537 99209 (ii) Capacity Addition Target and Achievement for 2017-18 (Figures in MW) Thermal Hydro Nuclear RE including SHP Total Target Ach Target Ach Target Ach. Target Ach. Target Ach. Central 4880 3170 800 390 500 0 Not Available NA 6180 3560 State 3546 1760 300 200 NA NA Not Available NA 3846 1960 Private 2940 3780 205 205 NA NA Not Available NA 3145 3985 Total 11366 8710 1305 795 500 0 Not Available NA 13171 9505 (iii) Capacity Addition Target and Achievement for 2018-19 (Figures in MW) Thermal Hydro Nuclear RE including SHP Total Target Ach Target Ach Target Ach. Target Ach. Target Ach. Central 2760 1960 710 110 0 0 Not Available NA 3470 2070 State 4506 2850 130 30 NA NA Not Available NA 4636 2880 Private 0 972 0 0 NA NA Not Available NA 0 972 Total 7266 5782 840 140 0 0 Not Available NA 8106 5922 (iv) Capacity Addition Target and Achievement for 2019-20 (Figures in MW) Thermal Hydro Nuclear RE including SHP Total Target Ach Target Ach Target Ach. Target Ach. Target Ach. Central 6040 3940 600 300 700 0 Not Available 0 7340 4240 State 4256.15 2780 210.99 0 NA NA Not Available 9 4467.14 2789 Private 0 45 379 0 NA NA Not Available 9377 379 9422 Total 10296.15 6765 1189.99 300 700 0 Not Available 9386 12186.14 16451 (v) Capacity Addition Target and Achievement for 2020-21 (Figures in MW) Thermal Hydro Nuclear RE including SHP Total Target Ach Target Ach Target Ach. Target Ach. Target Ach. Central 5790 4080 300 300 0 0 Not Available 0 6090 4380 State 4276 846 111 111 NA NA Not Available 38 4387 995 Private 525 0 195 99 NA NA Not Available 7368 720 7467 Total 10591 4926 606 510 0 0 Not Available 8185 11197 13621 (vi) Capacity Addition Target and Achievement for 2021-22 (Figures in MW) Thermal Hydro Nuclear RE including SHP Total Target Ach Target Ach Target Ach. Target Ach. Target Ach. Central 5400 2370 0 0 700 0 Not Available 0 6100 2455 State 4360 1590 100 0 NA NA Not Available 85 4460 17452 Private 525 525 393 393 NA NA Not Available 15862 918 16780 Total 10285 4485 493 393 700 0 Not Available 15947 11478 20825 (vii) Capacity Addition Target and Achievement for 2022-23 (Figures in MW) Thermal Hydro Nuclear RE including SHP Total Target Ach Target Ach Target Ach. Target Ach. Target Ach. Central 2120 660 60 0 700 0 Not Available 0 2880 856 State 2400 800 130 120 NA NA Not Available 196 2530 16126 Private 0 0 0 0 NA NA Not Available 15206 0 15206 Total 4520 1460 190 120 700 0 Not Available 15402 5410 16982 (vii) Capacity Addition Target and Achievement for 2023-24 (Figures in MW) Thermal Hydro Nuclear RE including SHP Total Target Ach Target Ach Target Ach. Target Ach. Target Ach. Central 6880 2920 2060 78 1400 1400 Not Available 0 10340 4441 State 7820 2120 100 0 NA NA Not Available 43 7920 2163 Private 0 1128 720 0 NA NA Not Available 18,441.70 720 19570 Total 14700 6168 2880 78 1400 1400 Not Available 18485 18980 26131 2. Capacity Addition Targets / Achievements During Nov-2024 (MW) Cummulative Nov-24 Apr-24 to Nov-24 Deviation Schemes Sector Target 2024-25 Target Achievement Target Achievement (+) / (-) Central 6740 1320 0 3300 0 0 State 8620 0 0 4100 0 0 Thermal Private 0 0 0 0 60 0 Total 15360 1320 0 7400 60 0 Central 1800 0 0 1000 0 0 State 320 33.33 0 166.66 40 0 Hydro Private 1200 120 0 1080 0 0 Total 3320 153.33 0 2246.66 40 0 Nuclear Central 1200 0 0 0 0 0 Central NA NA 0 NA 0 0 RE State NA NA 0 NA 0 0 including Private NA NA 2305.31 NA 14907.9 0 SHP Total NA NA 2305.31 NA 14907.9 0 Central 9740 1320 0 4300 0 0 State 8940 33.33 0 4266.66 40 0 All India Private 1200 120 2305.31 960 14967.9 0 Total 19880 1473.33 2305.31 9526.66 15007.9 0 Capacity addition Targets/Achievements during 2024-25 22000 20000 18000 Capacity (MW) 16000 14000 12000 10000 8000 6000 4000 2000 0 Thermal Hydro Nuclear Total Axis Title Target Achievement Capacity Addition Targets/Achievements during the Month of Nov-2024 1600 1400 1200 1000 800 600 400 200 0 Thermal Hydro Nuclear Total Target Achievement 13 ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS LOCATED IN THE REGIONS OF MAIN LAND AND ISLANDS (As on 30.11.2024) (UTILITIES) Mode wise breakup Ownership/ Thermal Renewable Region Grand Total Sector Nuclear Coal Lignite Gas Diesel Total Hydro RES*(MNRE) Total State 19525 250 2878.9 0 22653.9 0 6008.25 815.2 6823.45 29477.35 Private 22084.33 1080 772 0 23936.33 0 3241 41873.88 45114.88 69051.21 Northern Region Central 15048.62 250 2344.06 0 17642.68 1620 11580.51 379 11959.51 31222.19 Sub Total 56657.95 1580 5994.96 0 64232.91 1620 20829.76 43068.08 63897.84 129750.75 State 21290 900 2849.82 0 25039.82 0 5446.5 604.23 6050.73 31090.55 Private 31762.17 500 4676 0 36938.17 0 481 53929.2 54410.2 91348.37 Western Region Central 21610.47 0 3280.67 0 24891.14 3240 1635 666.3 2301.3 30432.44 Sub Total 74662.64 1400 10806.49 0 86869.13 3240 7562.5 55199.73 62762.23 152871.36 State 22192.5 0 791.98 159.96 23144.44 0 11867.48 637.08 12504.56 35649 Private 13572.5 250 5120.24 273.7 19216.45 0 0 56157.34 56157.34 75373.79 Southern Region Central 13827.04 3390 359.58 0 17576.62 3320 0 541.9 541.9 21438.52 Sub Total 49592.04 3640 6271.8 433.66 59937.5 3320 11867.48 57336.32 69203.8 132461.3 State 6970 0 80 0 7050 0 3550.22 278.11 3828.33 10878.33 Private 5613 0 0 0 5613 0 209 2004.85 2213.85 7826.85 Eastern Region Central 16291.86 0 0 0 16291.86 0 1005.2 10 1015.2 17307.06 Sub Total 28874.86 0 80 0 28954.86 0 4764.42 2292.96 7057.38 36012.24 State 0 0 411.36 36 447.36 0 422 276.25 698.25 1145.61 North Eastern Private 0 0 0 0 0 0 0 308.94 308.94 308.94 Region Central 1242.02 0 1253.6 0 2495.62 0 1522.01 30 1552.01 4047.63 Sub Total 1242.02 0 1664.96 36 2942.98 0 1944.01 615.19 2559.2 5502.18 State 0 0 0 84.35 84.35 0 0 5.25 5.25 89.6 Private 0 0 0 35.19 35.19 0 0 29.78 29.78 64.97 Islands Central 0 0 0 0 0 0 0 5.1 5.1 5.1 Sub Total 0 0 0 119.54 119.54 0 0 40.13 40.13 159.67 State 69977.5 1150 7012.06 280.31 78419.87 0 27294.45 2616.12 29910.57 108330.44 Private 73032 1830 10568.24 308.89 85739.14 0 3931 154303.99 158234.99 243974.13 ALL INDIA Central 68020 3640 7237.91 0 78897.91 8180 15742.72 1632.3 17375.02 104452.93 Total 211029.5 6620 24818.21 589.2 243056.91 8180 46968.17 158552.41 205520.58 456757.49 Figures at decimal may not tally due to rounding off Abbreviation:- SHP=Small Hydro Project (≤ 25 MW), BP=Biomass Power, U&I=Urban & Industrial Waste Power, RES=Renewable Energy Sources Note : - 1. RES include SHP, BP, U&I, Solar and Wind Energy. Installed capacity in respect of RES (MNRE) as on 30.11.2024 (As per latest information available with MNRE) *Break up of RES all India as on 30.11.2024 is given below (in MW) : Small Bio-Power Solar Total Wind Power Hydro Power BM Power/Cogen. Waste to Energy# Power$ Capacity 5084.25 47959.13 10728.21 612.99 94167.83 158552.41 # Includes Waste to Energy and Waste to Energy (Off-grid) $ Includes Ground Mounted Solar, Rooftop Solar, Hybrid Solar Comp. and Off-grid Solar/ KUSUM A. Capacity Added during November, 2024 0 MW B. Capacity Retired during November, 2024 0 MW C. Net Conv. Capacity Added during November, 2024 A-B 0 MW D. Net RES Capacity Added during November, 2024 2305.31 MW E. Net Capacity Added during November, 2024 C+D 2305.31 MW * Off-grid RES Capacity has been included from July-2021 onwards Sector wise breakup of RES capacity as shown is provisional. Allocation from central sector stations has been updated till 30.11.2024. Share from private sector generating stations has been updated as per latest information available. INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN NORTHERN REGION INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES (As on 30.11.2024) Mode wise breakup Ownership/ Thermal Renewable State Grand Total Sector Nuclear Coal Lignite Gas Diesel Total Hydro RES*(MNRE) Total State 0 0 1800.4 0 1800.4 0 0 0 0 1800.4 Private 878.22 0 108 0 986.22 0 0 376.38 376.38 1362.6 Delhi Central 2771.27 0 207.01 0 2978.29 102.83 723.09 0 723.09 3804.21 Sub-Total 3649.49 0 2115.41 0 5764.91 102.83 723.09 376.38 1099.47 6967.21 State 2510 0 150 0 2660 0 200 69.3 269.3 2929.3 Private 4561.78 0 0 0 4561.78 0 539 2248.17 2787.17 7348.95 Haryana Central 1566.6 0 431.59 0 1998.19 100.94 1591.73 5 1596.73 3695.86 Sub-Total 8638.38 0 581.59 0 9219.97 100.94 2330.73 2322.47 4653.2 13974.11 State 0 0 0 0 0 0 805.6 287.61 1093.21 1093.21 Private 0 0 0 0 0 0 1219.4 863.19 2082.59 2082.59 Himachal Pradesh Central 144.67 0 0 0 144.67 28.95 1223.88 0 1223.88 1397.5 Sub-Total 144.67 0 0 0 144.67 28.95 3248.88 1150.8 4399.68 4573.3 State 0 0 175 0 175 0 1230 170.17 1400.17 1575.17 Jammu & Kashmir Private 0 0 0 0 0 0 0 146.2 146.2 146.2 and Ladakh Central 577.14 0 129.07 0 706.22 67.98 1091.88 0 1091.88 1866.08 Sub-Total 577.14 0 304.07 0 881.22 67.98 2321.88 316.37 2638.25 3587.45 State 2300 0 150 0 2450 0 1243.4 127.8 1371.2 3821.2 Private 4474 0 0 0 4474 0 288 2002.6 2290.6 6764.6 Punjab Central 1440 0 0 0 1440 196.81 2296.04 0 2296.04 3932.85 Sub-Total 8214 0 150 0 8364 196.81 3827.44 2130.4 5957.84 14518.65 State 7580 250 603.5 0 8433.5 0 433 23.85 456.85 8890.35 Private 3257 1080 0 0 4337 0 104 29754.57 29858.57 34195.57 Rajasthan Central 1031.56 250 171.13 0 1452.68 556.74 1407.67 344 1751.67 3761.09 Sub-Total 11868.56 1580 774.63 0 14223.18 556.74 1944.67 30122.42 32067.09 46847.01 State 7135 0 0 0 7135 0 724.1 49.1 773.2 7908.2 Private 8814.33 0 0 0 8814.33 0 842.4 5524.75 6367.15 15181.48 Uttar Pradesh Central 5538.42 0 1029.51 0 6567.93 289.48 1857.52 30 1887.52 8744.92 Sub-Total 21487.75 0 1029.51 0 22517.26 289.48 3424.02 5603.85 9027.87 31834.6 State 0 0 0 0 0 0 1372.15 87.37 1459.52 1459.52 Private 99 0 664 0 763 0 248.2 881.76 1129.96 1892.96 Uttarakhand Central 503.1 0 69.66