C_IBP_2311 V12.35 Past Paper PDF
Document Details
Uploaded by Deleted User
null
null
Tags
Summary
This document is a past paper for the Certified Application Associate - SAP IBP for Supply Chain exam. It includes a series of multiple choice questions.
Full Transcript
IT Certification Guaranteed, The Easy Way! Exam : C_IBP_2311 Title : Certified Application Associate - SAP IBP for Supply Chain Vendor : SAP Version : V12.35 1 IT Certific...
IT Certification Guaranteed, The Easy Way! Exam : C_IBP_2311 Title : Certified Application Associate - SAP IBP for Supply Chain Vendor : SAP Version : V12.35 1 IT Certification Guaranteed, The Easy Way! NO.1 You are starting a new implementation project for SAP IBP and are considering the possible system architecture. What are the possible approaches for setting up the system landscape? Note: There are 2correct answers to this question A. Setup the two-tier landscape and have the configuration for development system regularly - updated from the production system B. Create additional planning areas in the test system to support training needs. C. Create additional test planning areas in the production system to support cutover needs D. Set up a three-tier landscape using transport, starting from the development system to test and - production Answer: B,D NO.2 Which of the following are features of lag-based snapshots? Note: There are 2 correct answers to this question A. The number of lag-based snapshots are limited to nine levels. B. Lag-based snapshots are created in the Configuration app for a fixed time range. C. Target key figure for these snapshots are expressed to the user in planning view D. Target key figure for these snapshots must have lag as root attribute in the base planning leve Answer: C,D NO.3 What are some of the capabilities of the Planner Workspaces app? Note: There are 2 correct answers to this question. A. It supports simulating the effect of the changes B. It supports favourites created in SAP IBP, add-in for Microsoft Excel C. It supports embedding analytic stories as a workspace component D. It supports sharing with other users or user groups. Answer: B,C NO.4 The Planner Workspaces is an important User Interface of SAP IBP for Supply Chain. What are the value drivers to use this as a planner? Note: There are 3 correct answers to this question A. Issues can be identified and solved with special functions B. It combines various components into one user interface C. It can trigger SAP S/4HANA transactions in real time. D. It combine the data from multiple planning area into one user interface E. Application job can be started from this user interface Answer: A,D,E NO.5 You need to make manual adjustments to your S&OP plan. Which are possible ways of making these changes? Note: There are 2 correct answers to this question A. Leveraging the web-based Planning capability B. Leveraging the functionality of SAP Work zone C. Using Microsoft Excel planning views D. Using Driver-Based planning Answer: A,C 2 IT Certification Guaranteed, The Easy Way! NO.6 You want to display and edit data in different Units of Measure (UOM). Which of the following must you consider before you use the UOM? Note: There are 3 correct answers to this question. A. Analytics allow the user to select the target unit of measure B. Units of measure are usually not time-independent. C. Units of measure is an attributes of master data type, such as product D. Units of measure are usually not time-dependent E. Conversion to the target unit of measure is handled by the SAP IBP Excel add-in. Answer: A,C,D NO.7 Which options can be used to reduce the runtimes of a time-series optimizer run? Note: There are 3 correct answers to this question. A. Keep the number of fairshare segments small B. Split into multiple planning areas to support weekly vs. daily planning needs. C. Use non-overlapping networks by using Subnetworks ID maintained at Location-Products to reduce the size of the problem D. Eliminate the usage of telescopic time buckets E. Increase the use of incremental lot size beyond the frozen horizon. Answer: A,C,D NO.8 Which of the following key functions are supported by SAP IBP for sales and operations? Note: There are 2correct answers to this question A. Allocation planning A & B? B. Simple statistical forecast C. Multi-Level Supply Planning Heuristics D. SAP Product Lifecycle Management Answer: C,D NO.9 You have set up a planning area, and data is now available. You adjust the necessary time profile settings and run a consistency check Which settings can you change and still run a successful consistency check? Note: There are 2 correct answers to this question A. Add a new time profile level to the time profile B. Change the numbering hierarchy of the period IDS in the time profile. C. Change the past and future horizon of the level in the time profile D. Change the description of attribute in the time profile Answer: C,D NO.10 You set up time-series integration using SAP Cloud Integration for data services. During the integration process of master data, an error occurred. In the Data Integration app the job failed with the status "Fatal Error" How can you find more details about the error? A. Navigate to the Master Data Workbook in Excel and open the Log. B. Navigate to the Manage Master Data app and open the Log C. Download the initial Problem report in the Data Integration app 3 IT Certification Guaranteed, The Easy Way! D. Download the Rejection Report in the Data Integration app Answer: C NO.11 You are working with inventory key figures. What are some of the business scenarios where you can use the Last Period Aggregation function? Note: There are 2 correct answers to this question A. Calculating the value of inventory on on weekly basis, using static argentation from the daily 'evel B. Calculating how many periods inventory is going to last based on the planned demand C. Searching for and returning the last not-full value of the inventory key figure D. Calculating the value of inventory on any level from the time profile, ensuring flexibility of calculation Answer: A,D NO.12 What are possible approaches to modeling a customer demand in time-series-based optimization with SAP IBP for response and supply? Note: There are 2 correct answers to this question. A. Ensure discounting does not result in negative costs for each customer-product combination. B. Assign a high cost value (1 million or more ) for non-delivery to priority customers C. Ensure product prioritization with the combination of customer and product D. Try to go as granular as possible with the customer product Answer: A,C NO.13 You are reviewing the master data types that are often used for supply and inventory planning. Which master data types are compound master data types? Note: There are 2 correct answers to this question A. SOURCEPRODUCTION B. SOURCECUSTOMER C. SOURCELOCATION D. SOURCECUSTGROUP Answer: B,C NO.14 A time profile is defined with these levels: day, technical week, week, month, and year. What condition in configuration will allow you to have a different value in the current week, versus all other time buckets? A. IF (,,PERIODID2"="SSPERIODID2CUSS...) B. IF ("PERIODID4"="SSPERIODIDICUSS...) C. IF (,,PERIODID3"="SSPERIODID2CUSS...) D. IF ("PERIODIDl"="SSPERIODIDICUSS...) Answer: B NO.15 You need to work in two separate sessions for two different SAP IBP tenants. What can help you differentiate the appearance of their user interfaces? Note: There are 2 correct answers to this question A. Define a different default planning area via the User Preferences 4 IT Certification Guaranteed, The Easy Way! B. Have a different set to tiles in the Home group of apps C. Set a separate theme for the Home page in the Web UI. D. Add the system name and tenant information from the About section to the Home pages Answer: B,C NO.16 Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)? Note: There are 3 correct answers to this question A. Adjusted transportation receipts B. Aggregated constraints C. Maximum lot size D. Transportation lead time E. Minimum lot size Answer: A,D,E NO.17 You create a planning filter using an SAP IBP Fiori app. Which of the following objects can it be appliedto? Note: There are 2 correct answers to this question. A. Planning view template in the SAP IBP, add-in for Microsoft Excel B. Jobs in the Application jobs app C. Compare function in the Planning Areas app D. Supply chain graph in Supply Chain Network app Answer: A,B NO.18 What are some of the actions configurators can do when working correct answers to this question A. Delete key figure data for a date range for all versions at once B. Copy key figure data from any version to any version C. Copy master data from base version to other version D. Run an application job to purge obsolete versions Answer: A,C NO.19 You need to create time periods for the time profile in a planning are a. What should you be aware of when running the Create Time Periods application job? A. The planning area to which the time profile is assigned must be active B. This application job can also be triggered from SAP IBP, add-in for Microsoft Excel C. A time profile has to be activated so that application job can proceed D. It is mandatory to specify the planning area in the Parameter Section of the application job Answer: C NO.20 Which Supply Planning processes are part of the tactical Planning level within a Planning Hierarchy? Note: There are 2 correct answers to this question. A. Order Prioritization B. Stock Replenishment 5 IT Certification Guaranteed, The Easy Way! C. Inventory Build and Reduction D. Balancing Supply and Demand Answer: C,D NO.21 What is an example of a commonly used time-independent key figure? A. A Special key figure marked as an aggregate key figure (aggregate constraint) B. A unit of measure key figure, such as UoM Conversion Factor C. Any attribute as a key figure D. A currency conversion key figure, such as Exchange Rate Answer: B,C NO.22 You are implementing a demand process in SAP IBP for sales and operations, and consider using the standard forecast key figures available in the sample planning area SAPIBP1. What are the first and last key figures in the logical progression of demand in the S&OP process? A. Local Demand Plan first and Combined Final Demand last B. Statistical Forecast Qty first and Consensus Demand Plan Qty last C. Local Demand Plan first and Consensus Demand Plan Qty last D. Statistical Forecast Qty first and Global Demand Plan Qty for SOP last Answer: A NO.23 What option is available for the key figure that is enabled for fixing? A. Fixing is possible for key figures with negative values B. Fixing is possible for a part of key figure value on a certain planning level C. You can change a fixed key figure only with administrative rights D. Fixing is possible for certain period, Including all child values in the hierarchy Answer: D NO.24 You are adding a value-based filter to a planning view. Which of the following conditions apply? Note: Thereare 2 correct answers to this question. A. These filters can be used together with attributes totals in the same planning view B. The alerts dashboard is not available if a value-based filter is set for the open planning view C. You can add (or delete) planning objects to a planning view after these filters are applied D. You can only apply one value-based filter per planning view. Answer: A,C NO.25 Which of the following conditions are relevant for subtotals in the planning view?Note: There are 2 correct answers to this question. A. The total value can be added before or after the selected attribute B. The Total number of the attribute that can use subtotal in the planning view can be restricted C. The values of the attribute-based total at the highest attribute level in the planning level can be - changed D. Only attribute-based totals can be added to the planning view. Answer: A,B 6 IT Certification Guaranteed, The Easy Way! NO.26 What are the S&OP operator (optimizer) parameters associated with demand fair share? A. Number of fair share segments Maximum days of coverage Number of fair share segments late delivery B. Number of fair share segments Additional tiering costs (default) Number of fair share segments late delivery C. Number of fair share segments Additional tiering costs (default) Maximum inventory D. Number of fair share segments Additional tiering costs (default) Inventory days of supply Answer: B NO.27 Which of the following solutions should be satisfied with violations penalized by the objective function ofthe time-series supply optimizer? Note: There are 3 correct answers to this question. Not adhering to maximum transport values A. Violation of minimum resource utilization B. Not respecting production capacity C. Not-fully satisfied demands D. Violation of minimum aggregated inventory vales Answer: A,C,D NO.28 What does ABC/XYZ segmentation allow you to do? Note: There are 2 correct answers to this question A. Substitute missing values in case of sporadic demands. B. Choose time-independent key figures as segmentation measures C. Identify inventory items that quire closer attentions D. Use forecasting algorithms that are specific to seasonal demands of SKUs in the segment "B" Answer: B,C NO.29 You need to define a new logic for a key figure to drive values from the PERPRODCUSTREGION level to thePERPRODCUST level. Which of the following configuration options are possible for this process? Note: There are 2 correct answers to this question A. Splitting the values from detailed to aggregated level by using a copy operator B. Splitting the values from aggregated to detailed level using multiplication by the proportions C. Splitting the values form aggregated to detailed level, based on the time profile attribute D. Splitting the values from aggregated to detailed level, based on a stored split-factor key figure Answer: B,D NO.30 Which Maintenance, Repair, and Overhaul (MRO) parts planning processes are included in SAP Integrated Business Planning for Supply Chain? Note: There are 3 correct answers to this question. A. Inventory Optimization B. Demand Driven Replenishment C. Demand Planning D. Supply Planning 7 IT Certification Guaranteed, The Easy Way! E. SAP Intelligent Asset Management Answer: A,C,D NO.31 What are some of the available ABC segmentation methods in SAP IBP? Note: There are 2 correct answers to this question. A. By Number of Items (Sorted Average) B. By Pareto Principle (Sorted and Cumulated %) C. By Number of Items (Sorted Value) D. By Pareto Principle (Sorted and Calculated Values Answer: B,C NO.32 What is a prerequisite for modelling outsourced manufacturers with production capacity using the Supply Optimizer? A. Model relative production costs across internal locations and outsourced manufacturing locations B. Use production lead times and offsets to manage components at the outsourced manufacturing location C. Ensure that the outsourced manufacturing locations have a separate subnetwork D. Model target inventory and stocks at the outsourced manufacturing location Answer: A NO.33 Which SAP IBP planning operator can be run to delete planning objects in a certain version? A. Purge Master Data B. Purge Key Figure Data Outside Planning Area Planning Horizon C. Purge Key Figure Data D. Purge Non-Confirming Data Answer: C NO.34 What actions can be performed in the Advanced Dashboards application? Note: There are 3 correct answers to this question. A. Use drill-down functionality B. Add Process instances C. Link two analytics charts. D. Rename the charts E. Display all assigned analytics on a single UI Answer: A,B,E NO.35 You are developing the functionality and appearance of the Excel UI for SAP IBP business users. Which extensibility capabilities for SAP IBP, add-in for Microsoft Excel are provided by Custom VBA coding? Note:There are 2 correct answers to this question. A. Changing the member names B. SAP IBP ribbon extension C. Chaging the entries from the Name Manager D. Changing the layout of the master data workbooks 8 IT Certification Guaranteed, The Easy Way! Answer: B,D NO.36 You are invited to review a problem with a customer's SAP IBP Excel template performance. What areas with the biggest potential performance impact would you focus on? Note: There are 2 correct answers to this question A. Excessive SAP IBP fromating in the Microsoft Excel UI B. Number of local members and complexity of calculation C. Complex calculation graphs for key figures D. Number of analytics charts displaying key figures' values Answer: A,C NO.37 Which unified planning processes' data is commonly reviewed in SAP IBP for sales and operations? Mote: There are 2 correct answers to this question. A. Global Demand Plan B. Constrained Demand plan C. Inventory Plan D. Consensus Demand Plan Answer: C,D NO.38 What are some of the key capabilities of SAP Integrated Business Planning for demand? Note: There are 3 correct answers to this question. A. Automated, exception- based processing B. Statistical analysis using the predictive analytics tools C. Determination of coefficient of variation (CV) D. Classifying demand into zones E. Embedded, on-the-fly demand analytics Answer: A,C,E NO.39 What function would you use to configure a year-to-date calculation? A. Rolling Aggregation B. Last Period Aggregation C. Cumulative Aggregation D. Dynamic Rolling Aggregation Answer: C NO.40 What are the possible ways that an attribute intended for use as an attribute as a key figure can be created and assigned? Note: There are 2 correct answers to this question. A. Created as type DECIMAL and assigned to an external master data type B. Created as type INTEGER and assigned to an compound master data type C. Created as type INTEGER and assigned to a simple master data type D. Created as type DECIMAL and assigned to an compound master data type Answer: C,D 9 IT Certification Guaranteed, The Easy Way! NO.41 You are evaluating criteria for choosing the solver to support planning for a complex supply What are some of the points that should be reviewed? Note: There are 2 correct answers to this question. A. Finite heuristics works with demand prioritization B. Push and Pull production models are used by the optimizer C. Prioritization of demand elements one by one is achieved by unconstrained heuristics D. Planning results can be generated faster by the optimizer. Answer: A,B NO.42 You are configuring disaggregation for the KF 1 key figure in the Planning Areas Model Configuration app. Which methods can you use? Note: There are 3 correct answers to this question A. Disaggregation according to user-defined expression B. Disaggregation according to an equal split C. Disaggregation in batch triggered by an application job D. Disaggregation according to a helper key figure E. Proportional disaggregation by using KF2 in the expression Answer: A,B,E NO.43 What is taken as an input for the demand sensing process? Note: There are 2 correct answers to this question. A. Results of time series analysis B. Forecast Accuracy measures C. Open Sales Order D. Consensus Demand Answer: C,D NO.44 The S&OP Operator Profiles app is used to configure different types of algorithms. Which algorithm- specific settings are unique for the Time Series-based Supply Optimizer? Note: There are 2 correct answers to this question. A. Discretization B. Time profile level C. Global cost factors D. Processing mode Answer: A,C NO.45 For which of the following application jobs can you enter planning filters as parameters? Note There are 2 correct answers to this question. A. Purge Master Data B. Purge Key Figure Data C. Purge Non-Conforming Answer: A,B Create Time Periods for Time Profiles 10 IT Certification Guaranteed, The Easy Way! NO.46 Which prerequisites must be met to maintain data types via the SAP IBP, add-in for Microsoft Excel? Note: There are 2 correct answers to this question A. The Normalized setting is available in the Planning Area B. Restriction types are set correctly C. The Inquire tab is activated in Microsoft Excel D. An applicable business catalogue is assigned to your business role Answer: C,D NO.47 How many different time levels can be selected within one planning view? A. Only time levels from the base planning level of selected key figures B. All time levels available in the time profile, restricted by global configuration parameter C. All time levels available in the time profile D. The number of time levels is restricted to four to avoid negative effects on performance Answer: B NO.48 As an architect, you are configuring the Planner Workspaces user interface settings. Which appearance settings are on your to-do list? Note: There are 3 correct answers to this question A. Adding planning view B. Add Navigation profile C. Define key figure formatting D. Add custom alerts E. Add playbooks for alerts Answer: A,D,E NO.49 You need to use your resource cost effectively with a certain minimum use, even if it means producing more than demand. Which solutions would apply to this scenario? Note: There are 2 correct answers to this question. A. Excess stock can be generated and will need to be staged in an overflow warehouse B. Capacity leveling will be possible for production and storage resources. C. Balance can be achieved between excessive prebuild and minimum use by incorporating violation costs D. Minimum capacity utilization will result in pull production Answer: A,C NO.50 Model configuration allows the attributes of a master data type to be assigned as key figures Which feature is relevant for this type of object? A. This type of key figure is not usually stored and it cannot be s itable B. This type of key figure has better performance than a time-independent key figure C. This object usually provides a single value for a unique planning combination D. This object contains user-defined criteria that monitor the running of business plan Answer: C 11 IT Certification Guaranteed, The Easy Way! NO.51 Which functional capabilities are included in SAP IBP for response and supply? Note: There are 2 correct answers to this question A. Gating Factor B. Analyse supply Usage C. Detailed Production Scheduling D. Calculating buffer proposals Answer: A,B NO.52 What are some of the features of the network charts in SAP Integrated Business Planning for Supply Chain? Note: There are 2 correct answers to this question A. To display the network chart, you need the Ship-From Location master data type in the planning area B. You can create a network chart from the dedicated app, or use the Analytic Advanced app C. You can create a network chart from the dedicated app, or use the Manage Analytic Stories app D. The network charts visualize relationships between warehouse, plants, customer, and supplier, for finished goods Answer: B,D NO.53 Which type of master data represents the Master Data Type Component? A. Virtual mater data type B. Compound Master Data Type C. Reference Master data type D. External Master Data Type Answer: C NO.54 You created a key figure and want to add calculations. Which of the following rules do you consider? Note: There are 2 correct answers to this question A. All key figure calculation have calcuation inputs, which can be marked as stored or calucated B. The calculation chain for a key figure must always result in a calculated key figure C. Aggregation calculations using SUM or MAX functions must be based on a higher aggregation u level. D. Key figure can be calculated across the different planning levels Answer: A,D NO.55 You are setting up planning with lot sizes. What are some of the properties of lot sizes that you need to beware of? Note: There are 2 correct answers to this question A. Lot sizes are applicable for production and handling quantities. B. Periodic lot size setting overrides the minimum lot size. C. Lot size are time-independent master data settings D. Lot size are applicable for production and transportation quantities Answer: C,D 12 IT Certification Guaranteed, The Easy Way! NO.56 How do you achieve rolling aggregation with SAP IBP? A. Using an attribute as a key figure B. Using an appropriate period weight factor C. Using a key figure calculation D. Using a local member Answer: C NO.57 What are some of the prerequisites for configuring a planning area that results in a successful consistency check? Note: There are 2 correct answers to this question. A. Configure at least one calculated key figure for the planning area B. Specify a planning horizon in the planning area for each level of the assigned time profile C. Configure at most two input key figures on the same planning level in a key figure calculation D. Assign the compound master data type and its component master data types Answer: B,D NO.58 What are the possible Master Data Maintenance options for SAP Integrated Business Planning for Supply Chain? Note: There are 3 correct answers to this question A. The SAP IBP, add - in for Micorsoft Excel B. The Manage Master Data app C. The Planner Workspaces app D. The Planning Areas Model Configuration app E. The data Integration job app Answer: A,B,E NO.59 You configured a stored key figure with an editability setting of "not editable" How can users modify the values of that key figure? Note: There are 2 correct answers to this question A. Importing the key figure data files using the Web UI B. Using the key figure calculations in the Web UI C. Using planning object maintenance with key figure data in Excel UI D. Managing the master data via the web UI Answer: A,C NO.60 You want to maintain key figure values for a new attribute and value combination, using SAP IBP, add-infor Microsoft Excel, and you are receiving an error related to missing combinations. How can you resolve this problem? Note: There are 2 correct answers to this question A. Use the Data Integration app to upload the missing combinations B. Use the Manage the master data app to create missing combinations C. Use the function New Planning Object in Excel UI to create missing combination D. Use the Copy Operator to create the missing combinations Answer: A,C NO.61 You are modeling co-products in SAP Integrated Business Planning for Supply Chain. What are some of the properties ofco-production you need to be aware of? Note: There are 2 correct answers 13 IT Certification Guaranteed, The Easy Way! to this question A. The number of co-products that can be defined in the supply model is unlimited. B. The output coefficient is time-dependent and should be modeled as a time series C. The relationship between main product and co-product is specified in the production source of supply. D. Co-production can be modelled only by supply optimizer and finite heuristics Answer: A,C NO.62 What are the relevant use cases for helper key figures? Note: There are 2 correct answers to this questions. A. Used to break down a large calculation into manageable subcalcuations B. Used by end-users in planning views to help visualize cross-period calculations C. Used at any level of calculation level except the Request Level D. Used when you have more than three inputs at the different planning level in one calculation Answer: A,D NO.63 You are implementing SAP IBP for sales and operations and are researching forecast mode algorithms. What are some of the algorithms that can be used? Note: There are 2 correct answers to this question A. Data-cleansing algorithms B. Trend models algorithms C. Sporadic demand models algorithms D. Naive models algorithms Answer: B,D NO.64 Which of the following data can be tracked using a change-history-enabled key figure? Note: There are 3correct answers to this question A. Scenario ID B. Modified code C. Attributes D. Key figure type E. Reason code Answer: B,C,E NO.65 Which of the following checks for master data and key figures does the Check Mode algorithm trigger? Note: There are 3 correct answers to this question. A. It checks whether the location products specified in the master data are connected by customer sourcing rules within the supply chain network B. It reports input key figure for which no related master data exists. C. It checks whether the location resource specified in the master data forms a cycle in the supply chain network D. It checks whether the heuristic detects cycles formed by nodes (such as location products) in the supply chain network 14 IT Certification Guaranteed, The Easy Way! E. It checks whether the sourcing in the Production Source Item master data type exists. Answer: A,D,E NO.66 Which Master Data Types are used in time-series-based planning within SAP IBP for response and supply? Note: There are 3 correct answers to this question A. DS Order fulfilment B. Transportation lane C. Customer D. Location E. Product Answer: C,D,E NO.67 Which planning operators can be executed in a time-series-based planning area? Note: There are 2 correct answers to this question A. Constrained Forecast Run B. Shelf Life Heuristics C. Finite Heuristics D. Deployment Optimizer Answer: A,C NO.68 What is the feature of the weighted average key figure calculation? A. The numerator of the calculation should be stored. B. The first parameter of the formula acts as a weight C. Attributes can be used in weighted average key figure calculation D. The numerator's value should include multiplication by the weight. Answer: D NO.69 What do you need to be aware of when using multiple pairs of key figures in one copy operator? Note: There are 2 correct answers to this question. A. Copying multiple key figures can be processed sequentially B. Copying multiple key figures on different planning levels is not possible. C. Necessary source key figures values are disaggregated. D. Necessary target key figures value are disaggregated Answer: A,D NO.70 Analytics charts are created by the user in the Advanced Analytics application. What can the user do in the Advanced Analytics app? Note: There are 2 correct answers to this question. A. Trigger export to Manage Analytics stories B. Merge charts together. C. Applying filters on there data D. Group Data Answer: C,D 15 IT Certification Guaranteed, The Easy Way! NO.71 Which processes are embedded in the sample planning areas SAP6 and SAP3? A. SAP6 Control Tower, and SAP3 Sales and Operations Planning and Supply Planning B. SAP6 Demand Planning and Sensing, and SAP3 Control Tower C. SAP6 Demand Planning and Sensing, and SAP3 Inventory Planning D. SAP6 Sales and Operations Planning and Supply Planning, and SAP3 Inventory Planning Answer: C NO.72 Which sourcing methods are required to identify the product flow through the network? Note: There are 3 correct answers to this question. A. Sourcing via Production B. Sourcing via Demand Prioritization C. Unspecified Sourcing D. Customer sourcing Rule E. Sorucing via Costs Answer: A,D,E NO.73 You need to integrate data from SAP S/4HANA and legacy ERP to SAP IBP. What are the integration toolsthat you can use with such a setup for data transfer? Note: There are 2 correct answers to this question. A. SAP Cloud Integration for data services B. SAP Smart data Integration C. Core Interface D. Real-time Integration Answer: A,B NO.74 A company only purchases a license for the SAP IBP S&OP module and wants to maximize the use of its standard functionality. What processes will they be able to cover? Note: There are 3 correct answers to this question O Get system-solving recommendations on how to react to production bottlenecks A. Review critical resources against demand B. Conduct Sales and Operations Planning meeting with cross functional representatives C. Build what if scenario for breaching supply-demand gaps D. Prepare versions of S&OP plan based on different optimizer modelling costs Answer: B,C,D NO.75 Which processes are running in sampl to this question. A. Supply and Allocation Planning B. Inventory Optimization C. Response Planning D. Demand Sensing E. Sales and Operation planning 16 IT Certification Guaranteed, The Easy Way! Answer: B,D,E NO.76 Manage Analytics Stories introduces advanced visualization features within SAP Integrated Business Planning for Supply Chain. What are some of the main capabilities of the stories? Note: There are 3 correct answers to this question. A. Links to the external URLs can be embedded in the story. B. The story is structured around one responsive page C. Specific chart and table filters can be applied within the story D. Stories must be re-created in each SAP IBP environment. Answer: A,C,D NO.77 Which of these conditions must be met to create a Local Member key figure? Note: There are 2 correct answers to this question A. Use Excel Cell reference in the report editor option is selected B. Users should have authorization for template administration. C. Activate Local Member recognition settings is selected D. A key figure is selected in the Key Figures tab in the SAP IBP, add-in for Microsoft Excel Answer: B,C NO.78 Which apps can be enhanced with analytical charts? Note: There are 2 correct answers to this question. A. Web-based Planning B. Intelligent visibility C. Planner Workspace D. Dashboards Advanced Answer: C,D NO.79 What is an example of a commonly used time-independent key figure? A. A Special key figure marked as an aggregate key figure (aggregate constraint) B. A unit of measure key figure, such as UoM Conversion Factor C. Any attribute as a key figure D. A currency conversion key figure, such as Exchange Rate Answer: C NO.80 Which conditions have to be fulfilled as a prerequisite to maintain a key figure disaggregation? Note: There are 2 correct answers to this question. A. The key figure is calculated and system editable B. The key figure is calculated and all editable. C. The key figure is stored and system editable. D. The key figure is stored and all editable Answer: C,D 17