4- Power design & MEP systems.docx.pptx
Document Details
Uploaded by AlluringLife
Tags
Related
- Distribution System and Substation Design PDF
- Power System Analysis and Design 5th Edition SI PDF
- UPDA Electrical/Electronic Engineering Reviewer Material No. 02 PDF
- Transmission and Distribution Electrical Engineering PDF
- Meralco Power Up Electrical Design Standards PDF
- AI Power System Analysis and Design PDF
Full Transcript
Power design & MEP systems Lecture 4 Socket Power Design Plan. Distribution. 01 03 CONTENTS 02 04 Power Design Mechanical Load. 01 PART ONE...
Power design & MEP systems Lecture 4 Socket Power Design Plan. Distribution. 01 03 CONTENTS 02 04 Power Design Mechanical Load. 01 PART ONE Power Design. Wire Type & Size 01 Power Design. To design any power circuit, we should select: I. Socket type and size. II. Wire type and size. III. Raceway type and size. IV. Circuit breaker type and rating. 01 Power Design. Socket Types are classified according to : I. General sockets or simplex sockets. II. 10A -16A are commonly used in Egypt. III. One module size. IV. Italian/Egyptian/Euro/American Standard. V. With or without safety shutters. VI. Without earthing (earth is only in the Italian standard). VII. Single, Double or Triple. 01 Power LightingDesign. Terms. Types of Electrical Sockets : 1. Single Socket: Single Socket (2P+E) Single Socket (2P) 2. Double Socket Double Socket (2P+E) Double Socket (2P) 01 Power LightingDesign. Terms. Types of Electrical Sockets : 3. Power Socket: على دائرة فرعية خاصةSingle Socket في حالة توصيل ال.Power Socket يطلق عليها في هذه الحالة ب 4. Column Socket: 5. Column Socket: 01 Power LightingDesign. Terms. Types of Electrical Sockets : 7. Floor Box 6. Industrial Socket Over than 16A. يستخدم فى األماكن التى ال يوجد بها حوائط أو فى االماكن التى Used with heavy loads above 2500VA..تحتوى على حوائط زجاجية May be single phase or three phase. :قد يضم انواع مختلفة من المخارج مثل Consist of two parts (plug and plug-in). )DATA -Telephone -USB socket -HDMI( Three pole or five pole. يثبت في األرض وله مواصفات معينه ويتم استخدامه في اضيق.الحدود :يتم اختيارة اعتمادا على.Ingress Protection(IP) Rating.Number of Modules 01 Power LightingDesign. Terms. Types of Electrical Sockets : 9. Explosion Socket 8. Electrical Socket With USB: 11. Tamper Resistance Socket 10. Anti-Bacterial Socket 01 Power LightingDesign. Terms. Types of Electrical Sockets : 12. Bed Head Unit (BHU): 01 Power LightingDesign. Terms. Socket Installations Types Flush mounted. Wall or surface mounted. Desk mounted. Floor mounted. Ceiling mounted. Load Type & 02 PART TWO Socket Distribution. Concept of Sockets Distribution Sockets of Each Load Type Notes Egyptian Code 02 Socket Distribution. -لكن هناك بعض االحمال االخرى التي يجب النقاط الرئيسية لتوزيع البرايز : اخذها باالعتبار ليس لها عالقة باالثاث و منها في المباني Access point. يتم توزيع البرايز على حسب : CCTV. .1طبقا لبالنات المعماري و توزيع االثاث. Blind & Shutters. .2فى حالة عدم توافرمعلومات عن االثاث يتم Sliding door. التوزيع طبقا للكود. Hand dryer. .3يتم التوزيع حسب االستخدام. Insect killer. Motorized damper. توزيع البرايز حسب نوع الحمل Fingerprint. EWH-electrical water heater. يوجد 3انواع من االحمال Data Racks. وهم : Fire alarm system. 1. Normal Fire Fighting system. 2. Emergency BMS System. 3. Critical MATV system. EX-Fans. 02 Socket Distribution. اشتراطات تصميمية وفقا ً للكود المصري. 02 Socket Distribution. اشتراطات تصميمية وفقا ً للكود المصري. 02 Socket Distribution. اشتراطات تصميمية وفقا ً للكود المصري. أنواع المقابس المستخدمة أقصى مسافة بين المقابAس وبعضها البعض وبين وضع المقابس بترابيزات المعامل المقابس والحائط الAمجاور 03 Mechanical PART THREE Loads. Disconnect Switch Types & Selection Mechanical Load Types VRF VRV 03 Mechanical Loads. Mechanical Load Chart Mechanica l Loads Fire HVAC Plumbing Fighting Air pump Water ventilation Drainage Condition Room Supply 03 Mechanical Loads. 1. HVAC SYSTEM : I. Ventilation الهواء الخارجي عادة ما يستخدم إلي تقليل أو إزالة الملوثات داخل المكان والملوثات والروائح التي تصدر عن طريق األشخاص II. Air Condition ويكون عبارة عن جزئين ( )Indoorو(.)Outdoor Indoor units: 1. Fans. وتكون تغذيتها إما Single Phaseأو Three Phaseحسب الموتور الخاص بتشغيلها ويمكن ربطها بنظام ال BMSأو Fire alarm systemلسحب وطرد الهواء في حالة وجود حريق. 03 Mechanical Loads. HVAC SYSTEM : Fans. ii. Exhaust fan iii. Jet fan i. Fresh Air fan iv. Smock Exhausted Fan v. Pressure fan 03 Mechanical Loads. HVAC SYSTEM : Fans. Wall exhaust fan Central Exhaust fan Celling exhaust fan vi. Toilet ventilation 03 Mechanical Loads. HVAC SYSTEM : Outdoor Units: 1. Compressor. 2. Chillers. 3. AHU. 4. Water Pump. Chiller Air Cooled Chiller Water Pump ACU For Large Spaces Cooling Tower ACU For Small Spaces 03 Mechanical Loads. HVAC SYSTEM : 03 Mechanical Loads. Types of Air Condition system 1. Split Unit a. Mini split unit Floor standing cassette type Split Unit b. Central split 03 Mechanical Loads. Types of Air Condition system 2. Central Air Conditioning Variable refrigerant flow &Variable refrigerant volume VRF & VRV يتكون النظام من وحدة خارجية outdoor واحدة ،توصل مع أكثر من وحدة داخليةindoor بمختلف اشكالها. الفكرة العامة لهذا النظام تعتمد علي الوصول الي نظام تكييف للمساحات الكبيرة باستهالك طاقه اقل. 03 Mechanical Loads. Variable Air Volume 03 Mechanical Loads. VRF and طريقة التغذية في نظام VAV.Disconnected Switch ويوضع بجانب كل واحده منهمindoor unit يوجد بكل غرفة سب لحملعن ا عليحSMDB أوMDB م نل وحةMMC PANEL ي تم ت غ ذية:Outdoor Unit Disconnect Switch. ط ري ق 03 Mechanical Loads. 3. Chilled Water System (Water cooled & Air cooled) For three Systems Chiller gives cooled water to water pump that send cooled.water to AHU OR FAN Air cooled.1 chiller AHU FOR Large Spaces Water pumps FCU FOR Small Spaces 03 Mechanical Loads. Chilled Water System (Water cooled & Air cooled) Water Cooled.2.Same as air cooled but with additional cooling tower to increase system efficiency chiller Cooling tower Water pumps AHU FOR Large Spaces FCU FOR Small Spaces 03 Mechanical Loads. water cooled and Air طريقة التغذية في نظام cooled MDB من لوحةMCC PANEL (Chiller)يتم تغذية- MDB من لوحةMCC PANEL (Water Pumps)يتم تغذية- MDB ) من لوحةMCC PANEL COOLING TOWER( يتم تغذية- )Water cooled system only( SMDBاوMDB ) من لوحةMCC PANEL AHU( يتم تغذية- DB من لوحةFCU يتم تغذية- 03 Mechanical Loads. 4. Inverter 03 Mechanical Loads. Disconnect )سكينة الفصل ( الحماية Switch هى عبارة عن سكينة فصل تستخدم لفصل الكهرباء عن الماكينه أثناء عملية الصيانة واليتم فصل الكهرباء إال بعد :فصل الماكينة و يتم اختيارها طبقا للتالي Type of disconnect switch depend on : 1. Number of poles (single phase or three phase). 2. Ampere rating (From 16A to 3600A). 3. Protection (Fused , Non-Fused). 4. IP protection. Systems require disconnecting switch: 1. Sliding Door. 2. Fire Alarm Control Panel (FACP). 3. HVAC loads. 4. Air Curtains. ويكون علىDisconnected Switch في حالة المنشات السكنية قد يوضع بجانب كل تكييف cm 120.إرتفاع 03 Mechanical Loads. 2. Fire Fighting تغذية الكهرباء الخاصة بها تكون خاصة بال Fire Pumpويتم تغذيتها قبل الدخول على ال MDBمن المحول مباشرة ويجب توافر مصدر اخر لتغذيتها طبقا للكود المصرى. ويمكن تغذيتها من مصدر واحد فقط بشرط أن يكون هذا المصدر ذو اعتمادية عالية وتتحقق االعتمادية للمصدر اذا كان ال يتم فصل الكهرباء عنه أكثر من 4ساعات في السنة وال يتم تغذية هذا المصدر من خطوط هوائية مباشرة ووجود حماية overcurrentواحدة فقط ووجود disconnect switchواحد فقط من اول مصدر التغذية الى لوحة الكنترول الخاصة بال fire pump )(Fire Pumps o Primary Pump. o Standby Pump. o Jockey Pump. 03 Mechanical Loads. 2. Fire Fighting 03 Mechanical Loads. 3. Plumbing 3.1 Heaters Heaters Central heater Normal heater 03 Mechanical Loads. 3. Plumbing 3.2 Drainage 03 Mechanical Loads. Ampere calculation for spilt unit and heater η: efficiency. : power factor. : design current..1.25 ثم اخد اقرب رقم للصناعة اما السخانات بضرب في2.5 لحساب مفتاح التكيفات يتم ضربه في Disconnect Rating (16:3600A). Power Design 04 PART FOUR Plan. AutoCAD 04 Power Design Plan. خطوات عمل الرسومات التصميميه لنظام القوى: .1تنظيف الرسم المعمارى من الزوائد وإعطائه لون رمادى وليكن ( )252ثم عمله بلوك. .2فتح ملف اتوكاد جديد وتسميته .power system design .3عمل layerجديده وتسميتها ARCHووضع الرسم المعمارى عليها. .4عمل layerجديده لوضع Socketsعليها وتوزيعها طبقا للكود والفرش الموجود(.بعض الرموز المستخدمة في التصميم) .5عمل Power system Legendخاص بالمشروع. .6عمل layerجديدة منفصلة خاصة بكال من: )) NORMAL WIRING -EMERGENCY WIRING -CRITICAL WIRING . 7بعد االنتهاء من التصميم وتوصيل اللنيات يتم تسميه كل لنية على حده وترقيمها على اللوحة المناسبة لها. .8إختيار غرفة الكهرباء (:)Zoning The important of zoning to select electrical rooms and avoid voltage drop. 04 Power Design Plan. خطوات عمل الرسومات التصميميه لنظام القوى: .1طريقه تسمية اللنيات : -4رقم الدور ()F1 -3رقم الزون -2اسم اللوحة ()DB .2رقم اللنية ()R1 .10يتم عمل رسمة منفصله خاصه بأحمال ( )Mechanical loadوتسمى ب .mechanical load plan . 11تحديد كل أجهزة التكييفات والسخانات او أي اجهزة تحتاج إلى تغذية كهربية من اللوحات الميكانيكية ووضعها علي الرسمة. .12يوضع كل مفتاح فصل على لنية منفصلة خاصة به. Under Supervision of: Dar Al-Kahrbaa Training Center Thank You. Dar Al-Kahrbaa Training Center General Manager : Eng. Hamdy