4- Power design & MEP systems.docx.pptx

Full Transcript

Power design & MEP systems Lecture 4 Socket Power Design Plan. Distribution. 01 03 CONTENTS 02 04 Power Design Mechanical Load. 01 PART ONE...

Power design & MEP systems Lecture 4 Socket Power Design Plan. Distribution. 01 03 CONTENTS 02 04 Power Design Mechanical Load. 01 PART ONE Power Design. Wire Type & Size 01 Power Design. To design any power circuit, we should select: I. Socket type and size. II. Wire type and size. III. Raceway type and size. IV. Circuit breaker type and rating. 01 Power Design. Socket Types are classified according to : I. General sockets or simplex sockets. II. 10A -16A are commonly used in Egypt. III. One module size. IV. Italian/Egyptian/Euro/American Standard. V. With or without safety shutters. VI. Without earthing (earth is only in the Italian standard). VII. Single, Double or Triple. 01 Power LightingDesign. Terms. Types of Electrical Sockets : 1. Single Socket: Single Socket (2P+E) Single Socket (2P) 2. Double Socket Double Socket (2P+E) Double Socket (2P) 01 Power LightingDesign. Terms. Types of Electrical Sockets : 3. Power Socket: ‫ على دائرة فرعية خاصة‬Single Socket ‫في حالة توصيل ال‬.Power Socket ‫يطلق عليها في هذه الحالة ب‬ 4. Column Socket: 5. Column Socket: 01 Power LightingDesign. Terms. Types of Electrical Sockets : 7. Floor Box 6. Industrial Socket Over than 16A. ‫يستخدم فى األماكن التى ال يوجد بها حوائط أو فى االماكن التى‬ Used with heavy loads above 2500VA..‫تحتوى على حوائط زجاجية‬ May be single phase or three phase. :‫قد يضم انواع مختلفة من المخارج مثل‬ Consist of two parts (plug and plug-in). )DATA -Telephone -USB socket -HDMI( Three pole or five pole. ‫يثبت في األرض وله مواصفات معينه ويتم استخدامه في اضيق‬.‫الحدود‬ :‫يتم اختيارة اعتمادا على‬.Ingress Protection(IP) Rating.Number of Modules 01 Power LightingDesign. Terms. Types of Electrical Sockets : 9. Explosion Socket 8. Electrical Socket With USB: 11. Tamper Resistance Socket 10. Anti-Bacterial Socket 01 Power LightingDesign. Terms. Types of Electrical Sockets : 12. Bed Head Unit (BHU): 01 Power LightingDesign. Terms. Socket Installations Types Flush mounted. Wall or surface mounted. Desk mounted. Floor mounted. Ceiling mounted. Load Type & 02 PART TWO Socket Distribution. Concept of Sockets Distribution Sockets of Each Load Type Notes Egyptian Code ‫‪02 Socket Distribution.‬‬ ‫‪ -‬لكن هناك بعض االحمال االخرى التي يجب‬ ‫النقاط الرئيسية لتوزيع البرايز‬ ‫‪:‬‬ ‫اخذها باالعتبار ليس لها عالقة باالثاث و منها‬ ‫في المباني‬ ‫ ‬ ‫‪Access point.‬‬ ‫يتم توزيع البرايز على حسب ‪:‬‬ ‫ ‬ ‫‪CCTV.‬‬ ‫‪.1‬طبقا لبالنات المعماري و توزيع االثاث‪.‬‬ ‫ ‬ ‫‪Blind & Shutters.‬‬ ‫‪.2‬فى حالة عدم توافرمعلومات عن االثاث يتم‬ ‫ ‬ ‫‪Sliding door.‬‬ ‫التوزيع طبقا للكود‪.‬‬ ‫ ‬ ‫‪Hand dryer.‬‬ ‫‪.3‬يتم التوزيع حسب االستخدام‪.‬‬ ‫ ‬ ‫‪Insect killer.‬‬ ‫ ‬ ‫‪Motorized damper.‬‬ ‫ ‬ ‫توزيع البرايز حسب نوع الحمل‬ ‫‪Fingerprint.‬‬ ‫ ‬ ‫‪EWH-electrical water heater.‬‬ ‫يوجد ‪ 3‬انواع من االحمال‬ ‫ ‬ ‫‪Data Racks.‬‬ ‫وهم ‪:‬‬ ‫ ‬ ‫‪Fire alarm system.‬‬ ‫‪1. Normal‬‬ ‫ ‬ ‫‪Fire Fighting system.‬‬ ‫‪2. Emergency‬‬ ‫ ‬ ‫‪BMS System.‬‬ ‫‪3. Critical‬‬ ‫ ‬ ‫‪MATV system.‬‬ ‫ ‬ ‫‪EX-Fans.‬‬ ‫‪02 Socket Distribution.‬‬ ‫اشتراطات تصميمية وفقا ً للكود‬ ‫المصري‪.‬‬ ‫‪02 Socket Distribution.‬‬ ‫اشتراطات تصميمية وفقا ً للكود‬ ‫المصري‪.‬‬ ‫‪02 Socket Distribution.‬‬ ‫اشتراطات تصميمية وفقا ً للكود‬ ‫المصري‪.‬‬ ‫أنواع المقابس المستخدمة‬ ‫أقصى مسافة بين المقاب‪A‬س وبعضها البعض وبين‬ ‫وضع المقابس بترابيزات المعامل‬ ‫المقابس والحائط ال‪A‬مجاور‬ 03 Mechanical PART THREE Loads. Disconnect Switch Types & Selection Mechanical Load Types VRF VRV 03 Mechanical Loads. Mechanical Load Chart Mechanica l Loads Fire HVAC Plumbing Fighting Air pump Water ventilation Drainage Condition Room Supply ‫‪03 Mechanical Loads.‬‬ ‫‪1. HVAC SYSTEM :‬‬ ‫‪I.‬‬ ‫‪Ventilation‬‬ ‫الهواء الخارجي عادة ما يستخدم إلي تقليل أو إزالة الملوثات داخل المكان والملوثات والروائح التي‬ ‫تصدر عن طريق األشخاص‬ ‫‪II.‬‬ ‫‪Air Condition‬‬ ‫ويكون عبارة عن جزئين ( ‪ )Indoor‬و(‪.)Outdoor‬‬ ‫‪ Indoor units:‬‬ ‫‪1. Fans.‬‬ ‫وتكون تغذيتها إما ‪ Single Phase‬أو ‪ Three Phase‬حسب الموتور الخاص بتشغيلها ويمكن ربطها بنظام ال ‪ BMS‬أو‬ ‫‪ Fire alarm system‬لسحب وطرد الهواء في حالة وجود حريق‪.‬‬ 03 Mechanical Loads. HVAC SYSTEM : Fans. ii. Exhaust fan iii. Jet fan i. Fresh Air fan iv. Smock Exhausted Fan v. Pressure fan 03 Mechanical Loads. HVAC SYSTEM : Fans. Wall exhaust fan Central Exhaust fan Celling exhaust fan vi. Toilet ventilation 03 Mechanical Loads. HVAC SYSTEM :  Outdoor Units: 1. Compressor. 2. Chillers. 3. AHU. 4. Water Pump. Chiller Air Cooled Chiller Water Pump ACU For Large Spaces Cooling Tower ACU For Small Spaces 03 Mechanical Loads. HVAC SYSTEM : 03 Mechanical Loads. Types of Air Condition system 1. Split Unit a. Mini split unit Floor standing cassette type Split Unit b. Central split ‫‪03 Mechanical Loads.‬‬ ‫‪Types of Air Condition system‬‬ ‫‪2. Central Air Conditioning‬‬ ‫‪Variable refrigerant flow &Variable refrigerant volume VRF & VRV‬‬ ‫يتكون النظام من وحدة خارجية ‪outdoor‬‬ ‫واحدة‪ ،‬توصل مع أكثر من وحدة داخلية‪indoor‬‬ ‫بمختلف اشكالها‪.‬‬ ‫الفكرة العامة لهذا النظام تعتمد علي الوصول‬ ‫الي نظام تكييف للمساحات الكبيرة باستهالك‬ ‫طاقه اقل‪.‬‬ 03 Mechanical Loads. Variable Air Volume 03 Mechanical Loads. VRF and ‫طريقة التغذية في نظام‬ VAV.Disconnected Switch ‫ ويوضع بجانب كل واحده منهم‬indoor unit ‫يوجد بكل غرفة‬ ‫ سب لحملعن‬ ‫ا‬ ‫عليح‬SMDB ‫أو‬MDB ‫ م نل وحة‬MMC PANEL ‫ ي تم ت غ ذية‬:Outdoor Unit Disconnect Switch. ‫ط ري ق‬ 03 Mechanical Loads. 3. Chilled Water System (Water cooled & Air cooled) For three Systems Chiller gives cooled water to water pump that send cooled.water to AHU OR FAN Air cooled.1 chiller AHU FOR Large Spaces Water pumps FCU FOR Small Spaces 03 Mechanical Loads. Chilled Water System (Water cooled & Air cooled) Water Cooled.2.Same as air cooled but with additional cooling tower to increase system efficiency chiller Cooling tower Water pumps AHU FOR Large Spaces FCU FOR Small Spaces 03 Mechanical Loads. water cooled and Air ‫طريقة التغذية في نظام‬ cooled MDB ‫ من لوحة‬MCC PANEL (Chiller)‫يتم تغذية‬- MDB ‫ من لوحة‬MCC PANEL (Water Pumps)‫يتم تغذية‬- MDB ‫) من لوحة‬MCC PANEL COOLING TOWER( ‫يتم تغذية‬- )Water cooled system only( SMDB‫او‬MDB ‫) من لوحة‬MCC PANEL AHU( ‫يتم تغذية‬- DB ‫ من لوحة‬FCU ‫يتم تغذية‬- 03 Mechanical Loads. 4. Inverter 03 Mechanical Loads. Disconnect )‫سكينة الفصل ( الحماية‬ Switch ‫هى عبارة عن سكينة فصل تستخدم لفصل الكهرباء عن الماكينه أثناء عملية الصيانة واليتم فصل الكهرباء إال بعد‬ :‫فصل الماكينة و يتم اختيارها طبقا للتالي‬ Type of disconnect switch depend on : 1. Number of poles (single phase or three phase). 2. Ampere rating (From 16A to 3600A). 3. Protection (Fused , Non-Fused). 4. IP protection. Systems require disconnecting switch: 1. Sliding Door. 2. Fire Alarm Control Panel (FACP). 3. HVAC loads. 4. Air Curtains. ‫ ويكون على‬Disconnected Switch ‫في حالة المنشات السكنية قد يوضع بجانب كل تكييف‬ cm 120.‫إرتفاع‬ ‫‪03 Mechanical Loads.‬‬ ‫‪2. Fire Fighting‬‬ ‫تغذية الكهرباء الخاصة بها تكون خاصة بال ‪ Fire Pump‬ويتم تغذيتها قبل الدخول على ال ‪ MDB‬من المحول مباشرة ويجب‬ ‫توافر مصدر اخر لتغذيتها طبقا للكود المصرى‪.‬‬ ‫ويمكن تغذيتها من مصدر واحد فقط بشرط أن يكون هذا المصدر ذو اعتمادية عالية وتتحقق االعتمادية للمصدر اذا كان ال يتم‬ ‫فصل الكهرباء عنه أكثر من ‪ 4‬ساعات في السنة وال يتم تغذية هذا المصدر من خطوط هوائية مباشرة ووجود حماية‬ ‫‪ overcurrent‬واحدة فقط ووجود ‪ disconnect switch‬واحد فقط من اول مصدر التغذية الى لوحة الكنترول الخاصة بال‬ ‫‪fire pump‬‬ ‫)‪(Fire Pumps‬‬ ‫‪o Primary Pump.‬‬ ‫‪o Standby Pump.‬‬ ‫‪o Jockey Pump.‬‬ 03 Mechanical Loads. 2. Fire Fighting 03 Mechanical Loads. 3. Plumbing 3.1 Heaters Heaters Central heater Normal heater 03 Mechanical Loads. 3. Plumbing 3.2 Drainage 03 Mechanical Loads. Ampere calculation for spilt unit and heater η: efficiency. : power factor. : design current..1.25 ‫ ثم اخد اقرب رقم للصناعة اما السخانات بضرب في‬2.5 ‫لحساب مفتاح التكيفات يتم ضربه في‬  Disconnect Rating (16:3600A). Power Design 04 PART FOUR Plan. AutoCAD ‫‪04 Power Design Plan.‬‬ ‫خطوات عمل الرسومات التصميميه‬ ‫لنظام القوى‪:‬‬ ‫‪.1‬تنظيف الرسم المعمارى من الزوائد وإعطائه لون رمادى وليكن (‪ )252‬ثم عمله‬ ‫بلوك‪.‬‬ ‫‪.2‬فتح ملف اتوكاد جديد وتسميته ‪.power system design‬‬ ‫‪.3‬عمل ‪ layer‬جديده وتسميتها ‪ ARCH‬ووضع الرسم المعمارى عليها‪.‬‬ ‫‪.4‬عمل ‪ layer‬جديده لوضع ‪ Sockets‬عليها وتوزيعها طبقا للكود والفرش الموجود‪(.‬بعض الرموز المستخدمة في‬ ‫التصميم)‬ ‫‪.5‬عمل ‪ Power system Legend‬خاص بالمشروع‪.‬‬ ‫‪.6‬عمل ‪ layer‬جديدة منفصلة خاصة بكال من‪:‬‬ ‫‪)) NORMAL WIRING -EMERGENCY WIRING -CRITICAL WIRING‬‬ ‫‪. 7‬بعد االنتهاء من التصميم وتوصيل اللنيات يتم تسميه كل لنية على حده وترقيمها على‬ ‫اللوحة المناسبة لها‪.‬‬ ‫‪.8‬إختيار غرفة الكهرباء (‪:)Zoning‬‬ ‫‪ The important of zoning to select electrical rooms and avoid‬‬ ‫‪voltage drop.‬‬ ‫‪04 Power Design Plan.‬‬ ‫خطوات عمل الرسومات التصميميه‬ ‫لنظام القوى‪:‬‬ ‫‪.1‬طريقه تسمية اللنيات ‪:‬‬ ‫‪ -4‬رقم الدور (‪)F1‬‬ ‫‪ -3‬رقم الزون‬ ‫‪ -2‬اسم اللوحة (‪)DB‬‬ ‫‪.2‬رقم اللنية (‪)R1‬‬ ‫‪.10‬يتم عمل رسمة منفصله خاصه بأحمال (‪ )Mechanical load‬وتسمى ب‬ ‫‪.mechanical load plan‬‬ ‫‪. 11‬تحديد كل أجهزة التكييفات والسخانات او أي اجهزة تحتاج إلى تغذية كهربية من‬ ‫اللوحات الميكانيكية ووضعها علي الرسمة‪.‬‬ ‫‪.12‬يوضع كل مفتاح فصل على لنية منفصلة خاصة به‪.‬‬ Under Supervision of: Dar Al-Kahrbaa Training Center Thank You. Dar Al-Kahrbaa Training Center General Manager : Eng. Hamdy

Use Quizgecko on...
Browser
Browser