Part Analysis Report N° 20022024 7233 PDF

Summary

This document is a part analysis report, detailing the traceability, electrical tests, X-ray checks, and final control of a specific part. It includes data and results of various tests conducted to evaluate the part's conformance to specifications. The part analysis report ultimately evaluates the conformity of the part to required specifications.

Full Transcript

![](media/image3.png) Part Analysis Report **N° 20022024 7233** +-----------------------------------+-----------------------------------+ | **Customer P/N : ** | **06M.115.393.F** | +===================================+===================================+ | **BONTAZ...

![](media/image3.png) Part Analysis Report **N° 20022024 7233** +-----------------------------------+-----------------------------------+ | **Customer P/N : ** | **06M.115.393.F** | +===================================+===================================+ | **BONTAZ P/N :** | **269060** | +-----------------------------------+-----------------------------------+ | **8D Number:** | **200224 7233** | +-----------------------------------+-----------------------------------+ | --------------- | **1** | | **Quantity:** | | | --------------- | | +-----------------------------------+-----------------------------------+ | | | +-----------------------------------+-----------------------------------+ **Modification history** **Index** **Description** **Author** **Approved by** **Date** ----------- ----------------- ------------ ----------------- ------------ A Creation Hassna I.NASSIRI 02/09/2024 **Picture of the product** Summary ======= [[1.] [Summary] 3](#_Toc40363075) [[2.] [Traceability data of the part] 4](#traceability-data-of-the-part) [*[2.1.]* [Engraving on part] 4](#engraving-on-part) [[3.] [Di-electrical checking of the solenoid valve]](#_Toc40363079) [[4.] [Final control :]....9](#_Toc40363085) 5.Control by Xray............................................................................10**6.Conclusion.......................................................................................10** 1. Traceability data of the part ============================= 1. Engraving on part ----------------- ![](media/image7.png) Di-electrical checking of the solenoid valve ============================================ - **VISUAL CHECK** ![](media/image9.png) **Leakage shall be less than 1 cc/min at the pressure of 5 +/- 0.5 bar:** **Result: The part is** **conformed** 3. **[x ray check ]** **OFF ON** ![](media/image11.png) **Coil aspect is conformed.** **No missing component** **The activation on/off performed correctly no strange behavior founded.** Final control: ============== **To check the conformity of the part in hydraulic function, we checked the part by our final control bench.** ![](media/image13.png) **The result of the first check on the EOL bench, after reciving the part is conform,** **P to A flow value 1,669 l/min ok on the minimum tolerence** **Flow rate specification \> 1.5 l/min** **SLR value 7.830 bar conforme** **no functionnel deviation was detected.** 5. **[Conclusion:]** **As mentioned below the part is conform on the EOL bench with flow rate on the minimum tolerance.** **P to A flow value 1,669 l/min ok on the minimum tolerence** **Flow rate specification \> 1.5 l/min** **We're working with the R&D team in order to increase the flow value on the maximum tolerance.**

Use Quizgecko on...
Browser
Browser