Untitled Quiz
39 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

Who is the Acting Executive Director of the National Building Code Development Office?

  • Mariano C. Del Castillo
  • Dante B. Potante
  • Wilfredo S. Lopez
  • Emmanuel P. Cuntapay (correct)
  • What was the previous name of the National Building Code Development Office?

  • National Construction Code Office
  • Architecture and Building Council
  • Building Research and Development Staff (correct)
  • Construction Regulatory Authority
  • Which Bureau is associated with the largest number of personnel listed in the NBCDO composition?

  • Bureau of Design (correct)
  • National Capital Region
  • Bureau of Construction
  • Bureau of Research & Standard
  • What is the role of Dante B. Potante in the NBCDO?

    <p>Acting Deputy Executive Director</p> Signup and view all the answers

    Which individual is linked to the National Capital Region in the NBCDO?

    <p>Lucia B. Vargas</p> Signup and view all the answers

    What position does Rodolfo Somera hold in relation to the NBCDO?

    <p>Technical Staff</p> Signup and view all the answers

    In what year was the order reactivating and reconstituting the Building Research and Development Staff issued?

    <p>2000</p> Signup and view all the answers

    What is the primary purpose of the Revised Implementing Rules and Regulations of the National Building Code of the Philippines?

    <p>To safeguard life, health, property, and public welfare</p> Signup and view all the answers

    Which of the following is NOT covered by the IRR of the National Building Code?

    <p>Traditional indigenous family dwellings</p> Signup and view all the answers

    What is the full-time status of the members of the technical and administrative staff as stated in the document?

    <p>They are full-time but paid by their mother unit</p> Signup and view all the answers

    Which section of the IRR defines the scope and application of the regulations?

    <p>SECTION 103</p> Signup and view all the answers

    According to the document, which discipline is NOT listed as part of the scope covered by the IRR?

    <p>Agricultural</p> Signup and view all the answers

    What authority is vested in the Secretary of the Department of Public Works and Highways concerning the establishment of these rules?

    <p>Overseeing the National Building Code (PD 1096)</p> Signup and view all the answers

    What kind of projects are excluded from the IRR as specified in SECTION 103?

    <p>Traditional indigenous family dwellings</p> Signup and view all the answers

    What does the acronym DPWH stand for?

    <p>Department of Public Works and Highways</p> Signup and view all the answers

    Who is responsible for confirming and transmitting the validated remittance advices weekly?

    <p>Treasury Vault Auditor/Bank Auditor</p> Signup and view all the answers

    What document must collecting officers complete at the close of each business day?

    <p>Report of Collections and Deposits (RCD)</p> Signup and view all the answers

    What should the Local Treasurer do with the first three copies of the Report of Collections and Deposits after certification?

    <p>Submit to the Field Auditor for audit</p> Signup and view all the answers

    What is the purpose of the validation of remittance advices by the Bank Auditor?

    <p>To ensure accurate processing of remittances</p> Signup and view all the answers

    What action must the Field Auditor take towards the Report of Collections and Deposits?

    <p>Certify and submit copies to DPWH-CO Auditor</p> Signup and view all the answers

    How many copies of the Report of Collections and Deposits must be prepared by the Local Treasurer?

    <p>Five</p> Signup and view all the answers

    What document retains the accountability of the Local Treasurer?

    <p>Statement of account current</p> Signup and view all the answers

    Which copy of the Report of Collections and Deposits goes to the DPWH-CO Accountant?

    <p>Triplicate</p> Signup and view all the answers

    What is the fine amount for Light Violations?

    <p>P 8,000.00</p> Signup and view all the answers

    What percentage of the building permit fees is charged for constructing the superstructure above 2.00 meters without a permit?

    <p>100%</p> Signup and view all the answers

    What is the surcharge for excavation for a foundation started without a building permit?

    <p>10% of the building permit fees</p> Signup and view all the answers

    Which violation is imposed a fine of P 10,000.00?

    <p>Grave Violations</p> Signup and view all the answers

    What happens if the annual inspection fee is not paid within thirty days of the prescribed date?

    <p>A surcharge of 25% is imposed</p> Signup and view all the answers

    For which of the following actions is a penalty imposed as per the penal provisions?

    <p>Constructing without adhering to the Code</p> Signup and view all the answers

    What is the fine amount for grave violations?

    <p>P 10,000.00</p> Signup and view all the answers

    If a person alters a building without a permit, what penalty is applied?

    <p>100% surcharge on building permit fees</p> Signup and view all the answers

    What constitutes a light violation regarding occupancy certificates?

    <p>Failure to post the Certificate of Occupancy</p> Signup and view all the answers

    Which of the following best describes a less grave violation?

    <p>Non-compliance with work stoppage order without permit</p> Signup and view all the answers

    What is required if a violation of the provisions of the Code occurs?

    <p>Correction or removal of the violations by the owner</p> Signup and view all the answers

    Which of the following is classified as a grave violation?

    <p>Unauthorized change in construction type</p> Signup and view all the answers

    What action is considered a light violation regarding construction information?

    <p>Failure to post a Certificate of Occupancy</p> Signup and view all the answers

    Which of these would not be classified as a light violation?

    <p>Non-compliance with work stoppage order</p> Signup and view all the answers

    What is an example of a grave violation in construction?

    <p>Changing construction plans without proper permits</p> Signup and view all the answers

    Which of the following violations involves a lack of a Certificate of Change of Use?

    <p>Change in existing use or occupancy</p> Signup and view all the answers

    Study Notes

    National Building Code Development Office (NBCDO) Composition (July 6, 2005)

    • Special Order No. 43, Series of 2005, outlines the composition of the NBCDO, pursuant to Department Order No. 82, Series of 2000.
    • Emmanuel P. Cuntapaya: Acting Executive Director, NBCDO and Chief, Architectural Division, Bureau of Design.
    • Dante B. Potante: Acting Deputy Executive Director, Project Manager, OIC, Director III, Bureau of Design.
    • The NBCDO includes technical staff from various Bureaus (Design, Construction, Research & Standards) and the National Capital Region, as well as administrative staff. A full list of staff names and their respective bureaus is provided in the document.
    • Staff assignments are full-time, but salaries are drawn from their original bureaus.

    Revised Implementing Rules and Regulations of the National Building Code of the Philippines (P.D. 1096)

    • Officially known as the “IRR,” these rules aim to safeguard life, health, property, and public welfare, upholding sound environmental management.
    • The IRR covers architectural, civil/structural, electrical, mechanical, sanitary, plumbing, and electronics disciplines. It applies to all buildings and structures (except traditional indigenous dwellings and those covered by Batas Pambansa Bilang 220).
    • The IRR details procedures for remitting funds, including reporting of collections and deposits with specified timelines and distribution of reports to different offices.
    • The document includes sections on violation classifications (Light, Less Grave, Grave) and corresponding fines (₱5,000, ₱8,000, and ₱10,000 respectively). Surcharges are also specified for various construction-related infractions, ranging from 10% to 100% of building permit fees depending on the stage of construction when violations occur. Failure to pay annual inspection fees incurs a 25% surcharge.
    • It is unlawful to violate any provision of the Code regarding the erection, construction, alteration, repair, use, or maintenance of a building or structure.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    More Like This

    Untitled Quiz
    6 questions

    Untitled Quiz

    AdoredHealing avatar
    AdoredHealing
    Untitled Quiz
    37 questions

    Untitled Quiz

    WellReceivedSquirrel7948 avatar
    WellReceivedSquirrel7948
    Untitled Quiz
    55 questions

    Untitled Quiz

    StatuesquePrimrose avatar
    StatuesquePrimrose
    Untitled Quiz
    50 questions

    Untitled Quiz

    JoyousSulfur avatar
    JoyousSulfur
    Use Quizgecko on...
    Browser
    Browser